A quick look at the Report on the Work of the Government in 2026.

2026-03-05 11:31:57

On March 5, the Premier of Li Qiang made an Report on the Work of the Government to the Fourth Session of the 14th National People's Congress.

On March 5, the Premier of Li Qiang made an Report on the Work of the Government to the Fourth Session of the 14th National People's Congress. The main points are as follows:

1. Review of

Work in 2025 GDP Growth of 5 Percent

, 12.67 Million New Jobs in Cities and Towns,

Grain Output Reaching 1.43 Trillion Jin

, Annual Output of New Energy Vehicles Exceeding 16 Million

in the Past 5 Years 0 HTML 0 UNK7 GDP grew at an average annual rate of 5.4% 0 HTML 0 UNK8 The scale of added value of manufacturing industry remained the largest in the world for 16 consecutive years 0 HTML 0 UNK9 The per capita disposable income of residents increased at an average annual rate of 5.4% 0 HTML 0 per capita disposable income 0 The cumulative number of new urban employment exceeded 60 million 0 HTML 0 UNK1 1 2. Major Targets and Tasks for the Tenth Five-Year Plan Period 0 HTML 0 UNK1 2 GDP Growth Maintained in a Reasonable Range 0 HTML 0 UNK1 3 Annual Increase in R & D Investment of the Whole Society by More than 7% 0 HTML 0 UNK1 4 Cumulative Reduction of Carbon Dioxide Emissions Per Unit of GDP by 17% 0 HTML 0 UNK1 5 Core Production of Digital Economy Industrial added value will account for 12.5% of GDP 0 HTML 0 UNK1 6 The average years of schooling of the working-age population will rise to 11.7 years 0 HTML 0 UNK1 7 The average life expectancy will rise to 80 years 0 HTML 0 UNK1 8 The comprehensive grain production capacity will reach about 1.45 trillion Jin 0 HTML 0 UNK1 9 The comprehensive energy The production capacity reaches 5.8 billion tons of standard coal 0 HTML 0 UNK2 0 III. Overall Requirements and Policy Orientation for Economic and Social Development in 2026 0 HTML 0 UNK2 1 Economic growth 4.5% -5% 0 HTML 0 UNK2 2 More than 12 million new jobs in cities and towns 0 HTML 0 UNK2 3 Consumer price increase of about 2% 0 HTML 0 UNK2 4 Grain output of about 1.4 trillion Jin 0 HTML 0 U NK25 Carbon dioxide emissions per unit of GDP will be reduced by about 3.8% 0 HTML 0 UNK2 6 The deficit rate will be arranged at about 4%. The scale of the deficit will increase by 230 billion yuan over the previous year 0 HTML 0 UNK2 7 The scale of general public budget expenditure will reach 30 trillion yuan for the first time 0 HTML 0 UNK2 8 Plan to issue 1.3 trillion yuan of ultra-long-term special treasury bonds 0 HTML 0 UNK2 9 Plan to arrange 4.4 trillion yuan of local government special bonds 0 HTML 0 UNK3 0 4. Part of the work tasks in 2026 0HTML0 UNK3 1 Income increase: 0HTML0 UNK3 2 Formulate and implement the income increase plan for urban and rural residents. Promote the income of low-income groups, increase the property income of residents, We will launch a number of practical measures to improve the salary and social security systems 0 HTML 0 UNK3 3 Consumption: 0 HTML 0 UNK3 4 We will arrange 250 billion yuan of ultra-long-term special treasury bonds to support the replacement of old consumer goods with new ones 0 HTML 0 UNK3 5 Investment: 0 HTML 0 UNK3 6 We plan to arrange 755 billion yuan of investment in the central budget. We will allocate 800 billion yuan of ultra-long-term special treasury bonds for the "two-fold" construction 0 HTML 0 UNK3 7 new quality productivity 0 HTML 0 UNK3 8:0 HTML 0 UNK3 9 to build new pillar industries such as integrated circuits, aerospace, biomedicine and low-altitude economy. Cultivate and develop future industries such as 0 HTML 0 UNK4 0 future energy 0 HTML 0 UNK4 1, quantum technology, embodied intelligence, brain-computer interface, 6G, etc. Deepening the expansion of "artificial intelligence +" 0 HTML 0 UNK4 2 National unified market: 0 HTML 0 UNK4 3 Comprehensive use of capacity regulation, standard guidance, price law enforcement, quality supervision and other means. 0 HTML 0 UNK4 4 Deeply crack down on "involution" competition 0 HTML 0 UNK4 5 Open: 0 HTML 0 UNK4 6 Further expand value-added telecommunications, biotechnology, Pilot opening of wholly foreign-owned hospitals and other fields 0 HTML 0 UNK4 7 Comprehensive Rural Revitalization 0 HTML 0 UNK4 8: Fully carry out the pilot project of extending the second round of land contract for another 30 years after its expiration. Carry out the fourth national agricultural census 0 HTML 0 UNK4 9 New urbanization 0 HTML 0 UNK5 0: Promote the urbanization of agricultural transfer population in a scientific and orderly manner, and relax the registration conditions for high school entrance examination in the inflow areas according to local conditions 0 HTML 0 UNK5 1 Employment: 0 HTML 0 UNK5 2 Build an employment-friendly development mode. Implement the action of stabilizing posts, expanding capacity and improving quality 0HTML0 UNK5 3 Education: 0HTML0 UNK5 4 Improve the policy of free preschool education. Increase the supply of regular senior high school degrees 0 HTML0 UNK5 5 Medical and health 0 HTML0 UNK5 6: The per capita financial subsidy standard for residents' medical insurance will be raised by 24 yuan 0 HTML0 UNK5 7 Social security: 0 HTML0 UNK5 8 The minimum monthly standard of basic pension for urban and rural residents will be raised by another 20 yuan. We will strengthen housing security for families with first marriage and first childbearing, and support families with many children to improve their housing needs. 0 HTML 0 UNK5 9 Green Development 0 HTML 0 UNK60: Establish a national low-carbon transformation fund. Cultivate new growth points such as 0HTML0UNK61 hydrogen energy 0HTML0UNK62 and green fuel 0HTML0UNK63 real estate: 0HTML0UNK64 implement policies to control increment, reduce inventory and optimize supply according to the city, and explore multiple channels to revitalize the stock of commercial housing 0HTML0UNK65

All can be viewed after purchase
Correlation

According to foreign media reports, the Iraqi General Administration of Customs revealed that the government has decided to reduce the tariff on solar energy equipment from 33% to 5%, in order to accelerate the popularization of solar energy in the country. The policy covers PV modules, inverters, cables and lithium batteries. The Iraqi News Agency reported that the decision to reduce tariffs on solar photovoltaic modules had been conveyed to the customs and was now

2026-03-05 18:00:31

On March 5, the Premier of Li Qiang made an Report on the Work of the Government to the Fourth Session of the 14th National People's Congress.

2026-03-05 11:31:57

In 2026, there are 830 key projects in Sichuan Province, which are divided into two parts: continuation (526 projects) and new construction (304 projects).

2026-01-20 10:21:13

Since 2027, "household non-natural person distributed photovoltaic projects" will no longer be included in the scope of mechanism price bidding. Prior to this, Shandong has made it clear that industrial and commercial distributed photovoltaic is not included in the scope of mechanism price. Therefore, starting from 2027, Shandong's distributed photovoltaic projects, only natural household photovoltaic projects can participate in the mechanism price bidding.

2025-12-23 13:22:00

By 2035, China's economy-wide net greenhouse gas emissions will be reduced by 7% -10% compared with the peak, striving to do better. The proportion of non-fossil energy consumption in total energy consumption will reach more than 30%, the total installed capacity of wind and solar power will reach more than six times in 2020, striving to reach 3.6 billion kilowatts, the forest stock will reach more than 24 billion cubic meters, new energy vehicles will become the mainstream of new sales vehicles, and the national carbon emission trading market will cover major high-emission industries. A climate-adaptive society has been basically established.

2025-09-25 09:46:25

In the declaration and evaluation of green liquid fuel technology research and industrialization pilot projects, after expert evaluation, it is proposed to support 9 projects such as CITIC Biological 30000 tons/year cellulosic fuel ethanol to carry out green liquid fuel technology research and industrialization pilot projects, including 8 projects involving green hydrogen production links.

2025-08-07 16:13:14

In order to implement the relevant decision-making and deployment of the Party Central Committee and the State Council, the General Administration of Market Supervision insists on the combination of construction and management, takes the initiative to attack and resolutely rectify the problem of "involution" competition in the field of quality.

2025-07-24 17:59:59

Prospective layout of next generation technologies such as perovskite batteries and crystalline silicon thin film tandem batteries.

2023-12-27 09:07:44

The notice will be implemented from January 1, 2024.

2023-12-26 11:32:16

At present, there are many problems, such as imperfect industrial policy, insufficient infrastructure, slow promotion of hydrogen vehicles and so on.

2023-12-22 09:25:45

Since 2023, Jilin's new energy projects have allocated energy storage according to 15% of the installed capacity in principle, charging time is more than 2 hours, and centralized sharing is encouraged. Among them, market-oriented grid-connected new energy projects, the capacity proportion and duration of new energy storage are moderately increased.

2023-12-08 11:25:42

Optimize the energy structure and accelerate the clean, low-carbon and efficient development of energy.

2023-12-08 10:01:01

Achieve business income of more than 60 billion yuan by 2025!

2023-12-07 09:17:16

It shall be submitted to the National Development and Reform Commission (Environment and Resources Department) before January 31, 2024.

2023-12-07 09:15:26

Subsidies can reach up to 20 million.

2023-12-04 09:20:30

Projects that have not been started beyond the validity period will automatically become invalid.

2023-12-01 09:44:07

By 2025, more than 10,000 fuel cell vehicles will be promoted in Guangdong Province, with an annual hydrogen supply capacity of more than 100,000 tons, and more than 200 hydrogenation stations will be built. By 2027, the scale of hydrogen energy industry will reach 300 billion yuan, and the whole industry chain of hydrogen "production, storage, transportation and utilization" will reach the advanced level in China.

2023-11-24 15:13:25

Inner Mongolia has standardized the general requirements, grid-connected requirements, application scenarios, layout requirements, investment conditions and support contents of independent new energy storage power station projects.

2023-11-21 09:45:56

The peak period is from 9:00 to 12:00 and from 17:00 to 22:00; the average period is from 7:00 to 9:00, from 12:00 to 17:00 and from 22:00 to 23:00; and the valley period is from 23:00 to 7:00 of the next day. The electricity price ratio is 1.5: 1: 0.5 during the peak period, the normal period and the valley period.

2023-11-17 10:07:03

A mid-term hearing was held on the 201 clause of the United States concerning China's photovoltaic imports.

2023-11-16 09:11:08

There are 302 projects with a total scale of about 1.4G W.

2023-11-10 19:24:58

By 2025, the annual hydrogen supply capacity will exceed 100,000 tons, and by 2027, the scale of the hydrogen energy industry will reach 300 billion yuan.

2023-11-09 11:56:27

It is required to take 2022 as the base year and strive to double the scale and quality of new energy, double the benefits driven by new energy, double the innovation ability of new energy science and technology, and double the manufacturing industry chain of wind and solar hydrogen storage equipment in 2025.

2023-11-08 09:51:17

By 2030, the installed capacity of photovoltaic sand control will be 89 million kilowatts, and the annual power generation will be 150 billion kilowatt-hours.

2023-11-07 18:23:27

The first batch of pilot construction of carbon peak was carried out in 15 provinces and regions.

2023-11-07 09:27:04

Encourage household photovoltaic "self-use, surplus electricity access to the grid" and industrial and commercial photovoltaic "all self-use" to achieve local consumption on the user side, improve the efficiency of distributed photovoltaic power generation, and reduce the pressure of public grid operation.

2023-11-06 14:54:44

Among them, detailed subsidies and application procedures are put forward to support the construction and operation of distributed photovoltaic projects, energy storage demonstration projects, green electricity hydrogen production, hydrogenation station construction, hydrogenation station operation energy storage demonstration project construction, energy storage project operation, etc.

2023-10-27 15:10:36

Since the second half of this year, many scenic projects have been abolished for various reasons.

2023-10-27 09:21:22

As of September 30, 2023, among the photovoltaic projects included in the competitive optimization scheme in 2021, 34 projects with installed capacity of 2.894 million kilowatts have not been started. According to the requirements, the construction scale of the above projects has been cancelled and the corresponding grid absorption space has been vacated.

2023-10-26 11:53:30

The project shall be completed and connected to the grid with full capacity by December 20, 2023, and the county government and the development enterprise shall issue a letter of commitment for grid connection on schedule. Time is tight and the task is heavy.

2023-10-24 14:39:42

The notice clarifies the scope of concurrent duties of relevant managers of renewable energy power generation projects, standardizes the license registration of renewable energy power generation projects, adjusts the license renewal policy of renewable energy power generation projects (units), and clarifies the responsibilities of power business license management of registered enterprises in different places.

2023-10-24 13:08:14

Focus on the rectification of mandatory requirements for supporting industries, mandatory requirements for investment landing.

2023-10-24 10:14:46

It will be implemented on December 1 and will be valid for 5 years!

2023-10-23 09:13:32

Shanghai plans to explore the construction of integrated hydrogen production, hydrogen storage and hydrogenation stations in Lingang New Area, and improve the regional hydrogen energy transmission network in Baowu Park and Shanghai Chemical Industry Zone.

2023-10-23 09:12:16

Yueyang County, Hunan Province, issued a notice to regulate the construction and management order of photovoltaic power generation projects, prohibit the fraudulent use of the name of unauthorized enterprises, and require that construction can be started only after obtaining the record certificate, otherwise the grid access procedures will not be handled. The notice will be implemented from May 8, 2023.

2023-10-20 19:20:26

The circular requests that by 2025, a number of demonstration projects with advanced technology, reasonable economic benefits and good prospects for popularization and application should be organized and implemented to promote the formation of a series of relatively mature and perfect supporting policies, technical standards and business models, so as to effectively promote the development of new technologies, new models and new formats of renewable energy.

2023-10-19 09:46:46

Since the third quarter, a total of 21 new subsidy policies involving photovoltaic and energy storage have been introduced in 9 provinces and municipalities.

2023-10-16 11:56:46

Hebei: Hydrogen stations to be included in local construction indicators

2023-10-13 09:12:49

The photovoltaic field is mainly related to photovoltaic power generation projects, offshore photovoltaic power generation, and ecological photovoltaic design in rocky desertification areas.

2023-10-12 10:51:04

Hydrogen energy is included in the key supporting industries in Karamay, and the maximum amount of support is not more than 5 million yuan.

2023-10-08 10:12:05

According to the document, many illegal acts, such as refusing or obstructing the signing of power purchase and sale contracts and grid-connected dispatching agreements with renewable energy power generation enterprises, failing to fairly open the power grid in accordance with regulations, violating the safety responsibility regulations of power construction units, contracting projects without qualification certificates, failing to organize completion acceptance, and unauthorized delivery and use, will be subject to administrative penalties.

2023-10-07 13:21:01

Since the third quarter, a total of 21 new subsidy policies involving photovoltaic and energy storage have been introduced in 9 provinces and municipalities.

2023-09-27 09:11:57

We will encourage the development of new energy sources such as photovoltaic and hydrogen energy, promote the development and utilization of new energy sources, optimize the energy structure, ensure energy security, promote carbon peak and carbon neutralization, and promote green development.

2023-09-25 10:16:44

Selection criteria: the main business income of Shanxi wind power equipment, photovoltaic, new energy storage industry chain "chain core" enterprises in the previous year, in principle, is not less than 50 million yuan; The annual product transaction volume between the core supporting "chain core" enterprises and the "chain owner" enterprises in the industrial chain exceeds 10 million yuan, and the annual product transaction volume between the potential chain owner "chain core" enterprises and more than 5 (including) other enterprises in the same chain exceeds 20 million yuan.

2023-09-25 09:48:54

According to the installed capacity, the subsidy is 0.40 yuan/watt (the subsidy standard is 1 yuan/watt for the project of building integrated photovoltaic application (photovoltaic modules as building components)), and the maximum subsidy for a single project is not more than 5 million yuan.

2023-09-22 11:46:47

The mainland has the conditions to transmit green power to Taiwan on a large scale, and is willing to strengthen cross-strait cooperation in the field of energy and jointly promote the green transformation and development of energy across the Straits.

2023-09-15 09:22:30

By 2025, the annual production capacity of 150 GW photovoltaic cells and components, 5G W wind turbines and components, 100 G Wh energy storage batteries and more than 5000 sets of hydrogen fuel cell equipment will be formed, and the output value of new energy manufacturing industry above the province's scale will reach 800 billion yuan. 

2023-09-13 10:05:29

Separately developed wind power, centralized photovoltaic and other new projects: (new energy projects approved or filed after the issuance of this implementation opinion), in principle, new energy storage shall be allocated according to not less than 10% of the installed capacity and more than 2 hours of energy storage time. Encourage new energy projects in stock to allocate new energy storage. The operation time of the new energy storage shall not be later than operation time of the new energy project.

2023-09-12 09:48:20