Shengzhou City, Zhejiang Province, Accelerates the Development of New Energy Equipment Industry with Wind and Solar Hydrogen Storage and Many Subsidies

2023-09-18 11:29:12

Promote the application of distributed photovoltaic power generation, and grant a one-time subsidy of 0.3 yuan/watt to the project investor according to the actual grid-connected capacity.

We should speed up the cultivation of benchmarking enterprises. For power batteries, new energy storage equipment, photovoltaic power generation equipment, wind power equipment, hydrogen fuel cells and other key parts enterprises, the annual sales revenue of their related business exceeded 10 million yuan, 20 million yuan, 50 million yuan and 100 million yuan for the first time, rewarding 100000 yuan, 200000 yuan, 500000 yuan and 1 million yuan respectively.

To promote the application of distributed photovoltaic power generation, according to the actual grid-connected capacity, the main body of project investment will be given a one-time subsidy of 200 yuan per kilowatt for the investment unit of energy storage facilities, with a maximum of 1 million yuan for a single project. In order to implement the strategic decision-making plan of "carbon peak and carbon neutralization", seize the new opportunities of energy reform and the window period of green and low-carbon development, the implementation opinions

on accelerating the high-quality development of new energy equipment industry are based on the 14th Five-Year Plan for National Economic and Social Development of Shengzhou City and the Outline of the Long-term Goals for 2035. In combination with the 14th Five-Year Plan for the Development of Renewable Energy in Zhejiang Province and the Implementation Opinions on Promoting the High-quality Development of New Energy in Zhejiang Province, the following implementation opinions are formulated to accelerate the high-quality development of new energy equipment industry in our city.

It is now open to the public for comments. If there are any comments and suggestions for revision, please give written feedback to the Economic Operation Section of our Bureau before September 24, 2023. Please indicate your name and contact information for written feedback to facilitate communication.

Collection date: September 17, 2023-September 24

, 2023 Contact person: Qiu Mengli

Tel: 0575-83129560

Address: 19/F, 403 Tiedaiyuan 1st Road, Shengzhou City (State-owned Comprehensive Building) 0HT ML0 UNK1 0 HTML 0 UNK1 1 Implementation Opinions on Accelerating the High-quality Development of New Energy Equipment Industry 0 HTML 0 UNK1 2 (Draft for Opinions) 0 HTML 0 UNK1 3 Township (Street) Party Committee (Party and Labor Committee) and People's Government (Office). Municipal departments and units: 0 HTML 0 UNK1 4 In order to implement the strategic decision-making and deployment of "Carbon Peak and Carbon Neutralization", seize the new opportunities of energy reform and the window period of green and low-carbon development, according to the Fourteenth Five-Year Plan for National Economic and Social Development of Shengzhou City and the Outline of the Long-Term Target for the Year 2035, Shengzhou Municipal Economic and Social Development Co., Ltd. Combining with the 14th Five-Year Plan for Renewable Energy Development in Zhejiang Province and the Implementation Opinions on Promoting the High-quality Development of New Energy in Zhejiang Province, the following suggestions are put forward to accelerate the high-quality development of new energy equipment industry in our city. 0 HTML 0 Xi Jinping 5 I. General Requirements 0 HTML 0 Xi Jinping 6 Guided by Xi Jinping Thought on Socialism with Chinese Characteristics for a New Era, implement the overall plan of the state and Zhejiang Province on accelerating the development of new energy industry, accelerate the cultivation and expansion of new energy equipment industry, take power battery and energy storage industry as the leading factor, and focus on supporting clean energy equipment industries such as photovoltaic. Planning the layout of hydrogen energy industry, comprehensively upgrading the development level of new energy equipment "10000 mu 100 billion" new industry platform, actively creating new energy application demonstration cities, and striving to build a new highland for the development of new energy equipment industry, to provide strong support for Shengzhou to build a "strong city of advanced manufacturing industry". By 2026, the city's new energy equipment industry has achieved remarkable results in agglomeration development, innovation empowerment, application and promotion, and has achieved a planned industrial output value of 40 billion yuan. To build a first-class manufacturing base of new energy equipment industry in China, a leading application base of new energy equipment industry in the Yangtze River Delta, and a well-known innovation base of new energy equipment industry in Zhejiang Province. Key tasks 0 HTML0 UNK1 8 (I) Vigorously develop new energy equipment industry 0 HTML0 UNK1 9 1. Focus on supporting the development of new energy power batteries and supporting industries, and strengthen power batteries such as nickel-hydrogen power batteries, lithium iron phosphate batteries and ternary lithium batteries. We will promote the development of new energy storage technologies such as lithium-ion batteries, sodium-ion batteries, liquid flow batteries and compressed air energy storage. 0 HTML 0 UNK2 0 promotes the development of energy storage materials such as positive and negative materials, diaphragms and electrolytes 0 HTML 0 UNK2 1, and fosters the development of supporting links such as batteries, wiring harnesses and connectors. Enhance the packaging and integration capabilities of energy storage battery modules, and actively develop energy storage converters, energy management systems, battery management systems and other supporting industries. Around the power battery and energy storage industry such as Fudi Battery, we will extend the upstream and downstream industrial chain and enhance the level of localization. (Responsible units: Municipal Bureau of Economy and Information Technology, Municipal Development and Reform Bureau, Municipal Science and Technology Bureau. The first is the leading unit, and the others are collaborative units, the same below) 0 HTML0 UNK2 2 2. Positive layout

2. Focus on key areas such as power batteries, new energy storage, photovoltaic cells, hydrogen fuel cells, hydrogen energy "production, storage, transmission and use", and promote key core technology research and industrial application. Supporting leading enterprises to implement a number of major scientific and technological projects at the national, provincial and municipal levels through "unveiling the list", and granting subsidies within 25% of the project's R & D or application investment, up to 3 million yuan (including higher-level subsidies). The national and provincial science and technology plan (special) projects completed and accepted in this year will be supported by 10% of the total amount of subsidies from their superiors over the years. By 2026, we will strive to produce more than 5 major scientific and technological achievements at or above the municipal level in the field of new energy. (Responsible unit: Municipal Science and Technology Bureau, Municipal Finance Bureau)

3. Encourage enterprises to increase R & D investment, implement the policy of additional deduction of enterprise R & D expenses and preferential tax policy for basic research, implement the enterprise R & D reserve system, and implement the policy of reward and subsidy for enterprise R & D investment. We will deepen and improve the system of science and technology innovation vouchers, promote the opening and sharing of scientific research facilities and equipment, provide innovation vouchers to enterprises and entrepreneurs with innovative needs, and provide incentives and subsidies to innovative carriers providing services. (Responsible unit: Municipal Science and Technology Bureau)

(IV) Accelerate the application and promotion

of new energy 1. Promote the alternative application of green energy such as lithium, sodium and hydrogen energy in old engineering equipment, and accelerate the elimination of diesel vehicles below the fourth national standard and diesel forklifts below the second national standard. When promoting the application of new energy and clean energy vehicles and adding or renewing official vehicles, new energy vehicles should be purchased in principle, and taxis should be encouraged to use new energy vehicles. For public parking lots and in-road parking spaces for motor vehicles, we will explore the implementation of preferential policies for partial reduction and exemption of parking fees for new energy vehicles. Promote the construction of electric vehicle charging infrastructure in an orderly manner, promote the basic coverage of village communities, and support new energy vehicles to go to the countryside. For public charging facilities built and put into operation by professional charging facilities operating enterprises in the same year, 25% of the actual equipment investment will be subsidized; for charging facilities built by public transport enterprises and open to the outside world, 30% of the equipment investment will be subsidized if the power is ≥ 150 kW, and 20% of the equipment investment will be subsidized if the power is <150 kW; For urban taxis, professional logistics express delivery enterprises that build their own charging facilities and community-specific charging facilities and open to the outside world, a 15% subsidy for equipment investment will be granted. (Responsible units: the Municipal Development and Reform Bureau, the Municipal Bureau of Economy and Information Technology, the Municipal Finance Bureau, the Municipal Transportation Bureau, the Municipal Agriculture and Rural Bureau, the Municipal Urban Investment Group, and the Municipal Power Supply Bureau)

2. Actively promote the coordinated development of "integration of source, network, load and storage", and support the development of "microgrid + energy storage", "new energy + shared energy storage" and other power side energy storage. Promote the application of distributed photovoltaic power generation, give 0 to project investors according to the actual grid-connected capacity, accelerate the large-scale application of new energy storage, actively encourage thermal power to rationally allocate new energy storage, and explore the development of new energy storage with peak shaving, frequency modulation and other multi-scenario applications. It supports the diversified application of energy storage on the user side of communication base stations, data centers, parks and industrial enterprises. We will accelerate the construction of a number of demonstration projects of "integration of light, wind and fire storage and charging" with advanced technology, standardized management and strong driving force for the development of local industries. A one-time subsidy of 200 yuan per kilowatt is given to the investment unit of energy storage facilities, and the maximum amount of a single project is not more than 1 million yuan . (Responsible units: the Municipal Power Supply Bureau, the Municipal Development and Reform Bureau, the Municipal Bureau of Economy and Information Technology, the Municipal Finance Bureau, the Municipal Natural Resources Bureau, the Municipal Agriculture and Rural Bureau, and the Municipal Ecological Environment Sub-bureau)

3. Strengthen the supply of hydrogen sources, and encourage the use of existing refueling (gas), charging and comprehensive energy supply service stations to implement the reconstruction and expansion projects of hydrogen stations. Support state-owned capital and social capital to participate in the investment, construction and operation of fixed hydrogenation stations. For newly built, rebuilt and expanded fixed hydrogenation stations with a daily hydrogenation capacity of more than 500 kg, subsidies shall be granted according to 10% of the investment in fixed hydrogenation station equipment, with a maximum of 2 million yuan. Encourage and guide hydrogenation station operators to find more cost-effective sources of hydrogen, and give hydrogenation subsidies of 10 yuan/kg to hydrogenation station operators whose hydrogenation machines exceed 35 MPa and whose terminal hydrogen sales price is not higher than 35 yuan/kg. To support the construction of fuel cell distributed power generation and cogeneration demonstration projects, subsidies shall be granted according to 20% of the investment in equipment, with a maximum of 3 million yuan. Support the expansion of fuel cell power to agricultural machinery, construction machinery, unmanned aerial vehicles and other fields, according to the hydrogen fuel cell power to 500 yuan/kilowatt subsidies, a single equipment limit of 50000 yuan. (Responsible unit: Municipal Development and Reform Bureau, Municipal Finance Bureau)

(5) Optimizing the development environment

of enterprises 1. Encourage social capital such as venture capital, venture capital and private capital to invest in new energy-related industries. Financial institutions are encouraged to develop green financial products such as green credit, green insurance, green bonds and green industry funds, and to support the construction of major new energy projects. We will guide financial institutions to establish new energy enterprises and wind power

2. Promote green energy technology and equipment and low (zero) carbon solutions in an all-round way, accelerate the construction of a comprehensive energy service system, and promote low-carbon energy consumption. Supporting the construction of new energy projects in parks and factories, and awarding 500000 yuan, 300000 yuan and 100000 yuan respectively to those newly recognized as national, provincial and Shaoxing green enterprises (factories, products, parks, supply chains, green design demonstrations, etc.). (Responsible units: Municipal Development and Reform Bureau, Municipal Bureau of Economy and Information Technology, Municipal Finance Bureau)

3. Guiding enterprises to improve the quality of intellectual property creation. To promote the construction of standard system, enterprises that have led the formulation of industry standards and local standards in the field of new energy and have issued and implemented them will be awarded 200000 yuan and 100000 yuan respectively. To promote government-enterprise cooperation, the social government-enterprise cooperation in the field of new energy led by enterprises (excluding government investment projects) will be awarded 100000 yuan and 50000 yuan respectively for national and provincial pilot projects or honors. (Responsible unit: Municipal Bureau of Economy and Information Technology, Municipal Market Supervision Bureau, Municipal Finance Bureau)

4. Fully apply and promote the national green power certificate system, and use the green certificate as the basic certificate for the determination of renewable energy power consumption. Actively carry out green power trading to provide market participants with sound, friendly and easy-to-use green power trading services. We will guide all kinds of power users to purchase new energy power and green power manufacturing products, promote the application of new energy green power in different industries and fields, comprehensively improve the level of clean energy use in the whole society, and support enterprises to incorporate green power consumption into corporate social responsibility reports. (Responsible unit: Municipal Power Supply Company, Municipal Development and Reform Bureau)

III. Safeguard measures

(I) Strengthen policy publicity and guidance. Strengthen planning guidance, make excellent policy support, strengthen project support, and do a good job of integrated planning and promotion with Shengzhou New Energy Equipment "Ten Thousand Mu and One Hundred Billion" New Industrial Platform Construction Plan. We will guide the development of new energy equipment industry clusters and comprehensively upgrade the development level of the "100 billion mu" new industrial platform. We should make good use of all kinds of media channels and strengthen the publicity and interpretation of new energy policies. Keep a close eye on project construction and make every effort to promote the construction of key projects and put them into operation to achieve results. (Responsible unit: Municipal Bureau of Economy and Information Technology, Municipal Development and Reform Bureau)

(2) Improve the work promotion mechanism. Strengthen the organization and leadership of the development of new energy equipment industry, establish a leading group and office for the development of new energy industry, implement the "chain length system" of the new energy industry chain, and form a working mechanism of unified leadership, division of responsibilities and orderly promotion. Optimize and improve the statistical system of new energy equipment industry and subdivision industry, regularly carry out enterprise and project consultation, and timely carry out industrial operation analysis and follow-up evaluation. (Responsible units: the Municipal Bureau of Economy and Information Technology, the Municipal Development and Reform Bureau, and the Municipal Bureau of Statistics)

(III) Give priority to strengthening project guarantee. Shengzhou Industrial Fund (parent fund) is encouraged to invest in the establishment of a new energy equipment industry development fund to support the equity investment of industrial funds in new energy enterprises and industrial projects. Shengzhou's high-level talent support policy and the "hometown of celebrities" talent plan are inclined to the new energy equipment industry. We will increase land security for new energy equipment industry projects and give priority to land approval and land supply. Focus on ensuring the energy consumption indicators of major new energy equipment industry projects, and the annual new renewable energy power consumption can be used for project energy consumption balance. (Responsible units: the Municipal Bureau of Economy and Information Technology, the Municipal Party Committee Organization Department (Talent Office), the Municipal Development and Reform Bureau, the Municipal Science and Technology Bureau, the Municipal Finance Bureau, the Municipal Human Resources and Social Security Bureau, the Municipal Natural Resources Bureau, the Municipal Investment and Investment Center, and the Municipal State-owned Company)

IV. Supplementary Provisions

1. The subsidy (reward) funds shall be borne by the municipal finance.

2.

3.

4.

All can be viewed after purchase

Correlation

On September 7, the Ministry of Industry and Information Technology issued five mandatory national standards for photovoltaic modules, including "Safety Requirements for Photovoltaic Modules" and "Requirements for Nameplate Identification of Photovoltaic Modules", with a total of 17 questions.

2026-09-09 10:48:26

The maximum funding period is 3 years.

2026-09-04 16:59:14

In July, the domestic photovoltaic module collection market ushered in a small peak. In July, the total capacity was 15.72 GW, an increase of about 69.9% compared with June, the monthly average price was about 0.735 yuan/W, a slight decline of about 2.3% compared with June, and the price was still falling.

2026-08-14 11:59:47

The 15th Five-Year Plan of Action for Electric Power Safety Production focuses on promoting the modernization of governance, focusing on prevention in advance, strengthening responsibility implementation, risk provention and control, scientific and technological empowerment and emergency response capabilities, with the goal of achieving a comprehensive improvement in the level of intrinsic safety by 2030.

2026-08-11 09:06:41

Shanghai announced the 2026 wind and solar development plan: promoting the construction of 345,000 kilowatts of onshore wind power and 1.454 million kilowatts of photovoltaic power, emphasizing the approval of construction on schedule, grid coordination, technological upgrading and standardized management.

2026-08-06 07:13:39

The Detailed Rules for the Implementation of the Development and Construction Management of Distributed Photovoltaic Power Generation in Zhejiang Province clearly States that general industrial and commercial distributed photovoltaic power generation and large-scale industrial and commercial distributed photovoltaic power generation can choose the mode of full self-generation and self-use or self-generation and self-use surplus electricity; if the self-generation and self-use surplus electricity is used for grid connection, the proportion of annual self-generation and self-use electricity to power generation is not required, and the on-grid electricity is fully involved in the electricity market in principle.

2026-08-05 12:28:34

The Plan specifies that by 2030, a new power system will be initially completed: a green and low-carbon power supply pattern will be basically formed, and the proportion of non-fossil energy generation will reach 50%;

2026-08-03 18:38:06

According to Xinhua News Agency, the Political Bureau of the CPC Central Committee held a meeting on July 30 and decided to hold the Fifth Plenary Session of the 20th CPC Central Committee in Beijing in October this year.

2026-07-30 17:07:03

On July 29, the Development and Reform Commission of Jiangsu Province issued the Implementation Plan for the Development of Distributed Photovoltaic in Jiangsu Province (2026-2030), specifying that by 2030, the cumulative installed capacity of distributed photovoltaic in the province will double that of 2025, reaching 120 million kilowatts; looking forward to 2035, the cumulative installed capacity of distributed photovoltaic in the province will reach 160 million kilowatts.

2026-07-30 07:37:14

To look at the issue of production capacity, we should adhere to a comprehensive, objective and fair attitude, look at it both historically and dialectically, uphold open cooperation, mutual benefit and win-win situation, and jointly resolve contradictions and differences. Protectionism will only disrupt the global economic and trade order, undermine the security and stability of the global production and supply chain and the healthy and orderly development of industrial cooperation, and bring long-term risks to world economic growth.

2026-07-29 09:17:22

Anhui has made it clear that virtual power plants participate in all kinds of power markets as independent subjects, and set up three types of trading units, namely, power generation, power consumption and energy storage, according to the types of resources, and give priority to responding to the needs of the province, and strengthen standardized management and safety supervision.

2026-07-28 15:12:34

The National Energy Administration launched the pilot project of micro-energy network in villages and towns to promote the local consumption of clean energy in rural areas and multi-energy coordination, enhance the autonomy, cleanliness and economy of energy use, complete the demonstration project by 2028, and promote the mature model by 2030.

2026-07-28 15:11:52

By unifying the cost calculation scope, calculation coefficient and calculation model of the whole industry chain of "silicon material-silicon wafer-battery-component", a cost accounting framework that runs through the industry chain is formed, which can eliminate the chaos of different cost accounting calibers and different expressions in the industry.

2026-07-27 14:33:55

Through classified disposal, 260 "zombie projects" which have been shelved for a long time and have not landed within the time limit will be cleaned up, so as to effectively revitalize the new energy construction indicators and standardize the management order of project filing.

2026-07-23 20:09:27

The 15th Five-Year Plan for Renewable Energy Development was issued and implemented to implement the "double carbon" goal and the new energy security strategy, and to promote the high-quality development of renewable energy.

2026-07-23 10:19:18

In 2030, the total installed capacity of renewable energy power generation will reach about 3.5 billion kilowatts, and the annual power generation will reach about 6 trillion kilowatt hours; the total installed capacity of wind power and solar power generation will reach more than 2.8 billion kilowatts, accounting for more than 50% of the total installed capacity, and the annual power generation will reach more than 4 trillion kilowatt hours, accounting for 30% of the total power generation.

2026-07-23 10:00:08

Three mandatory national standards for the photovoltaic industry will be implemented on January 1, 2027.

2026-07-21 08:05:06

The announcement shows that from April 1, 2027, the consumption tax on photovoltaic cells (also known as solar cells) will be levied at a rate of 2%, and from April 1, 2028, the consumption tax on photovoltaic cells will be levied at a rate of 4%.

2026-07-17 17:51:49

The Action Plan for Energy Conservation and Carbon Reduction in the Energy Sector (2026-2028) focuses on energy conservation and carbon reduction in the whole process of energy production and consumption, strengthens target management, technological upgrading and mechanism innovation, and promotes green and low-carbon energy transformation.

2026-07-10 16:54:24

The "Fifteenth Five-Year Plan" Action Plan for Carbon Peak clearly takes the green and low-carbon transformation of energy as the key, promotes the transformation of industrial structure, key areas and supporting systems as a whole, ensures that carbon peak is achieved by 2030, and lays a solid foundation for carbon neutrality.

2026-07-09 17:39:05

Digital new energy DataBM. Com found that recently, many places in the country have issued competitive announcements for photovoltaic, wind power, energy storage and other new energy projects.

2026-07-08 16:52:54

Shandong has promulgated new regulations on direct connection of green power, classified and optimized management, expanded applicable scenarios, strengthened source-load matching and whole-process supervision, and promoted efficient local consumption of green power.

2026-07-08 16:25:45

During the "15th Five-Year Plan" period, the proportion of photovoltaic installed on the roof of newly built industrial plants in the province will reach 100%, and the photovoltaic installed on the roof of existing industrial plants will be "fully installed", so as to achieve the goal of new industrial photovoltaic installed capacity of 10GW.

2026-07-08 15:18:29

Yunnan Province launched a demonstration project of integrated hydrogen production from green electricity in 2026, covering eight prefectures (cities), focusing on the production and application of green hydrogen/green ammonia, and strengthening factor guarantee, full-cycle management and project reserve.

2026-07-03 08:00:20

Yunnan Province issued a list of new shared energy storage projects in 2026, identifying 13 all-vanadium liquid flow/sodium ion energy storage projects, calling for speeding up approval, grid connection and construction, strictly controlling the transfer of development rights and construction changes, and vigorously promoting the large-scale and high-quality development of energy storage.

2026-07-03 08:00:18

On July 1, Guizhou Energy issued the Notice on Issuing the Annual Construction Plan of 44 Wind Power and Photovoltaic Power Generation Projects such as Shengtuan Wind Farm in Qixingguan District (hereinafter referred to as the "Construction Notice") and the Notice on Cleaning up the Construction Plan of the First Batch of Wind Power and Photovoltaic Power Generation Projects in Guizhou Province in 2026.

2026-07-02 10:03:06

The General Administration of Market Supervision issued detailed rules for the supervision and spot check of 173 kinds of products, such as photovoltaic modules and inverters, to strengthen the quality supervision of the photovoltaic industry chain.

2026-07-01 09:45:38

While the export data continues to advance rapidly and the market layout blossoms in an all-round way, the wind control problems faced by optical storage enterprises going to sea have become unprecedented important. Recently, at the 2026 SNEC exhibition, Meng Lijun, East China Sales Director of Shanghai XTransfer Network Technology Co., Ltd., was interviewed by the Digital New Energy Databm. Com, using practical cases to dismantle the trade risks and countermeasures in mature European and American markets and emerging markets in Asia, Africa and Latin America.

2026-06-22 16:38:38

Digital New Energy DataBM. Com found that since 2026, many wind and light projects have been launched, with a capacity of more than 68 GW. Some of the regions have announced the results of the competition.

2026-06-22 09:20:01

On June 12, Fujian Development and Reform Commission issued a notice that due to the adjustment of relevant factor guarantee policies and other factors, some photovoltaic power station projects are no longer qualified for development. In order to standardize project management, it was decided to abolish 9 photovoltaic power station projects such as Fuqing Tongwei Huijin Yuguang Integration (Phase II) 60 MW photovoltaic power generation project, with a total installed capacity of 958750 kilowatts.

2026-06-15 13:52:55

The circular solicits opinions on six standards for photovoltaic module testing and evaluation groups, aiming at standardizing industry testing methods and improving the scientificity and consistency of product performance evaluation.

2026-06-15 11:41:14

The Plan proposes that by 2030, the penetration rate of new energy heavy trucks will reach 40% and the number of new energy heavy trucks will exceed 1.6 million, focusing on energy supplement network, full-scene application, standard supervision and policy guarantee, so as to promote green and low-carbon transformation in the field of transportation.

2026-06-15 11:39:02

It is reported that the European Commission has approved an aid plan with a scale of 23 billion euros (about 179.968.1 billion yuan) to deploy more than 37.15GW renewable energy installations in Italy.

2026-06-11 10:04:21

In 2026, the region plans to arrange a total of 5.5 million kilowatts of development and construction of guaranteed grid-connected new energy projects, including 4.8 million kilowatts of wind power and 700,000 kilowatts of photovoltaic power.

2026-06-05 17:53:05

On June 3, Yunnan Energy Bureau and Yunnan Development and Reform Commission issued the Notice on the Development and Construction Plan of the First Batch of New Energy Projects in Yunnan Province in 2026.

2026-06-05 15:08:29

It will focus on four key tasks, namely, spot checking a number of business entities in areas where "involution" competition is prone to occur, punishing a number of business entities with "involution" competition violations and dishonesty, exposing a number of typical cases of "involution" competition violations and dishonesty, and forming a number of achievements in the construction of institutional mechanisms.

2026-05-27 14:04:48

The state announced the list of the fifth batch of renewable energy power generation subsidy projects in 2026, aiming at implementing the subsidy policy, supporting the development of clean energy and ensuring the reasonable income of the projects.

2026-05-21 09:54:22

On May 14, 2026, the National Development and Reform Commission and the National Energy Administration jointly issued the Notice on Promoting the Development of Multi-user Green Power Direct Connection in an Orderly Way. Multi-user green power direct connection can increase policy supply and improve the level of new energy consumption nearby. The notice clarifies the scope of application, covering a variety of users and scenarios; puts forward requirements from the aspects of planning, investment, construction, operation and management; stipulates the transaction and price mechanism, including market participation, measurement management, etc.; also emphasizes the organizational guarantee, and the coordination of multiple departments to promote the smooth development of green power direct connection mode.

2026-05-20 11:01:06

The Political Bureau of the CPC Central Committee held a meeting on April 28 to analyze the current economic situation and economic work. Xi Jinping, General Secretary of the CPC Central Committee, presided over the meeting.

2026-04-28 13:45:08

On April 12, 2026, the General Office of the Central Committee of the Communist Party of China and the General Office of the State Council issued the Comprehensive Assessment Measures for Carbon Peak and Carbon Neutralization. Since 2026, the Party committees and governments of provinces (autonomous regions and municipalities directly under the Central Government) have been evaluated and assessed, and control and support indicators have been set up. The target of reaching the carbon peak by 2030 was defined, and action plans were formulated for the "15th Five-Year Plan" and "16th Five-Year Plan" respectively. The evaluation and assessment are carried out annually, and the results are divided into excellent, qualified and unqualified. Conduct interviews according to the results, and serve as an important reference for cadre assessment, while seriously pursuing accountability for violations.

2026-04-24 15:46:17

The Opinion stresses that we should give priority to conservation, coordinate development and security, promote energy conservation and carbon reduction at a higher level and with higher quality, and support carbon neutralization, energy security and high-quality development.

2026-04-24 10:28:36

This opinion emphasizes the principle of giving priority to conservation, coordinating development and security, systematically promoting energy conservation and carbon reduction through industrial optimization, energy transformation, energy conservation in key areas, strict supervision and policy and technical support, and supporting carbon peak, carbon neutralization and green and high-quality development.

2026-04-24 10:28:26

On April 21, 2026, Li Lecheng, Secretary of the Party Leadership Group and Minister of the Ministry of Industry and Information Technology, chaired the Nineteenth Symposium on Manufacturing Enterprises to further study and implement the spirit of the General Secretary of Xi Jinping Party's impor tant speeches and instructions on future industries, to implement the spirit of the Central Economic Work Conference and the Two sessions, and to focus on accelerating the development of future industries. Listen to the introduction and suggestions of enterprises in relevant industries.

2026-04-22 09:46:46

On April 15, the State Council issued the "Opinions on Deepening the Reform of Investment Examination and Approval System". It is pointed out that temporary regulatory measures such as suspension of approval and filing can be implemented with the consent of the State Council in industries with prominent problems of disorderly competition, and specific requirements, time limits and modes of operation can be specified. Strengthen the coordination of enterprise investment project approval, filing management policy and factor fund management policy, and refuse to provide land use, sea use, energy use, water use, environmental assessment and other guarantees for projects prohibited by the state in accordance with the law and regulations, and shall not arrange government investment or provide financing support.

2026-04-16 10:33:50

On April 13, the Ministry of Industry and Information Technology issued the Notice on the Quality of Industry and Information Technology in 2026. The notice shows that there are six key tasks in this work: the implementation of enterprise quality improvement action, the implementation of quality technology upgrading action, the implementation of product and service quality upgrading action, the consolidation of quality technology foundation, the optimization of quality development ecology and the implementation of "Made in China" brand building action.

2026-04-14 09:24:46

The bill makes it clear that all kinds of anti-unfair competition measures will be used comprehensively to prevent and control "involution" competition in key industries and fields such as platform economy, photovoltaic, lithium batteries and new energy vehicles.

2026-03-30 13:48:22

Shandong has introduced a high-quality development plan for virtual power plants, with a clear regulation capacity of 2 million kilowatts by 2027 and 4 million kilowatts by 2030, to promote the construction of new power systems and low-carbon energy transformation through market-oriented mechanism, technology empowerment and multi-aggregation.

2026-03-30 13:37:30

The difficult area of Q1 photovoltaic grid connection in Guangdong in 2026 involves 7 cities, 26 counties and 224 towns, and the corresponding warning level of low-voltage distribution network is "limited", which requires overall layout and orderly construction.

2026-03-24 16:14:51

Inner Mongolia carries out special verification of energy consumption of step electricity price for electrolytic aluminium, cement and iron and steel enterprises in 2025, aiming at implementing national policies, strengthening energy-saving management and improving energy efficiency.

2026-03-17 17:22:47