Cancel 4 silicon materials, 6 batteries and 3 components! Ministry of Industry and Information Technology Releases Important List of Photovoltaic Industry

2023-12-06 18:11:25

Daquan Energy and other enterprises are among the cancelled ones.

On December 6, the Ministry of Industry and Information Technology issued a proposed announcement in line with the ". Jingke, Longji, Gaojing Solar Energy, Aixu and other 12 enterprises were included in the list of enterprises that meet the requirements of the document; Fourteen enterprises, such as Daquan and Jingyang Energy , intend to revoke their normative enterprise qualifications because they can not maintain the requirements of normative conditions; The names of five enterprises such as Inner Mongolia Zhonghuan Xiexin Photovoltaic Materials Co., Ltd. have changed.

All can be viewed after purchase

Correlation

According to the notice, Inner Mongolia will promote the consumption of new energy into a number of measures to steadily improve the level of consumption of new energy for self-use, effectively expand the scale of new energy delivery, enhance the regulation capacity of the power system, improve the price of new energy and market trading policies, and strengthen supervision and management.

2023-12-12 09:54:34

Enterprises can declare market-oriented grid-connected new energy projects at any time, or apply for the abolition of market-oriented grid-connected new energy projects that have been approved but can not be implemented at any time.

2023-12-05 09:18:47

No permanent basic farmland, basic grassland, Grade I protected forest land and key state-owned forest areas in Northeast Inner Mongolia shall be occupied.

2023-12-01 09:15:03

Newly registered centralized photovoltaic power stations and industrial and commercial distributed photovoltaic projects with parity access to the grid will be charged 0.25 yuan per kilowatt-hour. For other new energy projects such as wind power generation, geothermal power generation, solar thermal power generation and photovoltaic supporting energy storage, which are connected to the grid at a fair price according to the national policy, the on-grid price is 0.341 yuan/kWh.

2023-11-30 16:22:04

The General Department of the National Energy Administration issued a notice to publicly solicit opinions on the Notice on Promoting the Grid-connected and Dispatching Application of New Energy Storage (Draft for Opinions).

2023-11-23 10:08:07

Henan Development and Reform Commission issued a circular to encourage innovative modes of distributed photovoltaic power generation, standardize industry management, enhance regulatory capacity, and promote the healthy development of household photovoltaic.

2023-11-03 09:31:18

If it is not completed within the time limit, it will automatically withdraw from the power grid to absorb resources.

2023-10-26 09:17:25

Relevant enterprises with more serious bad credit records are included in the list of key concerns for management.

2023-10-18 18:16:00

Summary of hydrogen energy policy in the third quarter! Locally, Zhejiang promulgated the most hydrogen energy policies in the third quarter.

2023-10-16 10:02:33

In addition to loosening the production of green hydrogen, the Dadong District Government has also put forward a series of hydrogen subsidy policies, covering enterprise production, industrial park construction and the purchase of hydrogen vehicles.

2023-09-27 09:36:28

Chongqing Forestry Bureau issued a notice on soliciting opinions on the revision of the Notice of Chongqing Forestry Bureau on Further Standardizing the Management of Forest Land Used in the Construction of Photovoltaic and Wind Power Projects (draft for comments).

2023-09-26 09:50:56

According to the Notice, wind power projects, as well as onshore centralized photovoltaic power generation projects and offshore photovoltaic projects newly incorporated into the project bank, should adopt self-construction, joint construction or purchase of new energy storage methods to implement market-oriented grid-connected conditions. New energy storage (2 hours) should be built according to the proportion of 10% or more of the power.

2023-09-21 14:12:10

The announcement requires that the roof distributed photovoltaic power generation project should start construction after obtaining the access opinions of the grid enterprises and the approval of the township examination. If the access opinions and the approval of the examination are not obtained, the grid enterprises will not accept the application for grid connection.

2023-09-21 14:11:56

The Basic Rules clarify the construction path of electricity spot market, standardize the mechanism design of electricity spot market, clarify the operation requirements of electricity spot market, and standardize the relevant terms of electricity spot market.

2023-09-18 17:55:54

It involves four cities (prefectures) in the field of energy, and the main problems are illegal occupation of arable land and construction without approval.

2023-09-18 17:47:51

Involving photovoltaic and energy storage, Inner Mongolia proposed that by 2025, the economy of energy and electronics industry will take shape, and the coordinated development of "optical storage terminal information" will be realized.

2023-09-15 09:21:23

The Ministry of Natural Resources has decided to carry out four-year pilot projects in 43 cities in 15 provinces (cities) including Beijing to deploy pilot projects for the redevelopment of inefficient land.

2023-09-14 09:21:02

The Ministry of Housing and Urban-Rural Development issued a draft for soliciting opinions on the specifications of photovoltaic power generation projects, and made plans for the construction requirements and operation and maintenance of photovoltaic projects.

2023-09-12 10:22:43

Support and encouragement should be given in the direction of project landing, talent introduction, scientific research and innovation.

2023-09-06 11:29:13

If the annual output value reaches more than 50 million yuan, the subsidy shall be given according to 50% of the actual rent incurred in that year, with a maximum of 500000 yuan per year for a single enterprise.

2023-09-06 09:39:14

It is strictly forbidden to abandon or abandon cultivated land

2023-09-04 09:43:55

Recently, the National Development and Reform Commission, the Ministry of Finance and the National Energy Administration jointly issued the Notice on Promoting the Consumption of Renewable Energy Power with Full Coverage of Renewable Energy Green Power Certificates. How to issue green certificates? How to trade? How to apply? The National Development and Reform Commission released a picture interpretation.

2023-08-04 10:32:01

What arrangements have been made in the Notice to improve the renewable energy green power certificate system and promote renewable energy power consumption?

2023-08-04 10:17:54

CEMPI

105.29

-0.38 -0.36%

CONCPI

94.30

-1.31 -1.37%

CLKPI

104.52

-0.09 -0.09%

SPPI

45.16

+0.02 +0.04%

MORPI

76.51

-0.42 -0.55%

What is happening in the cement industry?