Digital New Energy DataBM. Com learned from the State Energy Administration that on November 22, the General Department of the State Energy Administration issued a public announcement to solicit opinions on the Notice on Promoting the Integration and Dispatch of New Energy Storage.
The document points out that the scope of new energy storage for power system dispatching is clearly accepted. The new energy storage power station connected to the power system and signed the dispatching agreement can be divided into dispatching and dispatching new energy storage and self-use new energy storage. Dispatching and dispatching new energy storage refers to new energy storage power stations with independent metering devices and operating according to market clearing results or instructions of power dispatching agencies, including independent energy storage power stations and new energy storage stations with conditions for independent operation; Power station self-use new energy storage refers to a new type of energy storage power station that operates jointly with power generation enterprises and users and is controlled by power generation enterprises and users according to their own needs, including new energy allocation energy storage that does not operate independently, thermal power joint frequency modulation energy storage, and user-side energy storage that signs dispatching agreements and has the ability to accept dispatching instructions.
The original text is as follows:
In order to standardize the grid-connected access management of new energy storage, optimize the dispatching operation mechanism, give full play to the role of new energy storage, and support the construction of new energy system and new power system, our Bureau has organized and drafted the Notice on Promoting the Grid-connected and Dispatching Application of New Energy Storage (Draft for Comments). It is now open to the public for comments. Relevant units and people from all walks of life
are welcome to fax their opinions and suggestions to 010-81929218 or send them to nengxiaochuneng@nea.gov.cn by e-mail within 30 days from the date of publication of this bulletin.
Thank you for your participation and support!
Attachment: Notice on Promoting the Grid Connection and Dispatching of New Energy Storage (Draft for Comments)
General Department
of National Energy Administration November 20