On August 20, the Development and Reform Commission of Ulanchabu City, Inner Mongolia, issued a public announcement that the results of the main investors of the 1500MW "Wind, Solar, Fire and Storage Integration" large-scale wind power and photovoltaic base project in Ulanchabu Jingda were obtained. The consortium of Beijing Jingneng Electric Power Co., Ltd. and Guodian Power Development Co., Ltd. was selected.
According to the previous public information, the large-scale wind power photovoltaic base project of Ulanchabu Jingda 1500MW "integration of wind, solar, fire and storage" is planned to be built on the barren hills with better wind and solar resources in Fengzhen City, Ulanchabu. Develop and construct 1.2 million kilowatts of wind power , 300000 kilowatts of photovoltaic and 225000 kilowatts/2 hours of energy storage facilities.
The project plans to build three 220kV booster stations, and the power generated by the project will be transmitted to the 500kV booster station of Inner Mongolia Jinglong Power Generation Co., Ltd. through three new 220kV booster stations. After collection and boosting, it is transmitted to the Beijing-Tianjin-North Hebei Power Grid through the "Jinglong-Datong-Fangshan" 500 kV transmission channel, with an investment of about 8.645 billion yuan.
In addition, the National Energy Administration has included this project in the list of the third batch of large-scale wind power and photovoltaic base construction projects in Inner Mongolia Autonomous Region, with a construction period of 24 months.