Recently, the General Office of the Party Committee of Inner Mongolia Autonomous Region and the General Office of the People's Government of Inner Mongolia Autonomous Region issued a circular on the Implementation Measures for Social Stability Risk Assessment of Major Decision-making in Inner Mongolia Autonomous Region. Risk assessment was carried out on the social stability of Runyang Yueda Photovoltaic Equipment Manufacturing Industry Chain Science and Technology Demonstration Project with an annual output of 55000 tons of industrial silicon. The total investment of the
project is over 800 million yuan, with an annual output of 55000 tons of industrial silicon. It is planned to construct 4 sets of 33000 kVA industrial silicon submerged arc furnaces, 1 × 20 MW submerged arc furnace flue gas waste heat power generation system and supporting public auxiliary equipment and facilities of the project.
The original text is as follows:
Announcement
on Social Stability Risk Assessment of Runyang Yueda Photovoltaic Equipment Manufacturing Whole Industry Chain Science and Technology Demonstration Project with an Annual Output of 55,000 Tons of Industrial Silicon Project According to the Interim Regulations on Major Administrative Decision-making Procedures (Decree No.713 of the State Council), Notice of the Leading Group of the Party Committee of Inner Mongolia Autonomous Region on Maintaining Stability and the Political and Legal Committee of the Inner Mongolia Autonomous Region Committee of the Communist Party of China on Issuing Four Normative Documents, Including the Trial Implementation of the Operating Rules for Risk Assessment of Social Stability on Major Issues in Inner Mongolia Autonomous Region (Nei Wen Fa [2016] No.1), Provisions on Procedures for Major Administrative Decision-making in Inner Mongolia Autonomous Region (Decree No.248 of the People's Government of Inner Mongolia Autonomous Region), Notice of the General Office of the People's Government of Inner Mongolia Autonomous Region on the Issuance of Measures for the Implementation of Risk Assessment of Social Stability in Major Decision-making in Inner Mongolia Autonomous Region (April 25, 2022). The social stability risk assessment of Runyang Yueda Photovoltaic Equipment Manufacturing Whole Industry Chain Science and Technology Demonstration Project with an annual output of 55,000 tons of industrial silicon is hereby announced as follows:
I. Project Overview
1. Construction site: Shanghaimiao Economic Development Zone, Etuoke Qianqi, Ordos City, Inner Mongolia
2. Construction Scale and Content: This project is planned to construct 4 sets of 33000 kVA industrial silicon submerged arc furnaces, 1 × 20 MW submerged arc furnace flue gas waste heat power generation system and project supporting public auxiliary equipment and facilities. The annual output of industrial silicon is 55,000 tons.
3. Investment: The total investment 80132 of the current Project is RMB 6,900 yuan . The source of funds is self-raised funds (30.0%) and loans (70.0%).
II. Purpose and Significance & nbsp;
In order to ensure the universality of opinions and suggestions collected, and at the same time enable the relevant interest groups of the project construction to understand all aspects of the project.
III. Preliminary Idea & nbsp;
In recent years, a number of vicious mass incidents have attracted great attention from the state, local governments and enterprises. Therefore, resolving contradictions and disputes from the source is the basis of building a harmonious society.
IV. Overview of possible risks affecting social stability of the project
Project approval, legal compliance, ecological environment impact during construction and operation, construction plan, fund raising and guarantee, noise, vibration, vehicle congestion impact during construction, floating population impact during construction, wage arrears of migrant workers and other factors.
V. Key Points of Countermeasures for Preventing or Mitigating Social Stability Risks
Vehicles shall be driven in accordance with the established routes, and signs conforming to traffic technical specifications shall be set up; the use and management of project funds shall be strengthened to ensure the implementation and availability of construction funds; Strictly supervise the construction units to carry out civilized construction, reduce disturbance to the people, and strengthen environmental protection.
VI. Feedback channels, methods and deadlines for soliciting opinions and suggestions from the public
1. Feedback channels for soliciting opinions and suggestions from the public
Contact person: Chen Zhanquan 1. Contact number: 15847211236 & nbsp; & nbsp;
2. Feedback method for soliciting opinions and suggestions from the masses & nbsp;
The masses can get in touch by telephone to express their opinions and suggestions on the social stability risks of the proposed project, as well as other relevant demands.
3. The feedback period for soliciting opinions and suggestions from the public may be within 15 days from the date of publication.
Ordos Weite Project Consulting Co., Ltd. November 23