On May 20, the tender announcement for EPC general contracting project of 100MW photovoltaic energy storage integration project in Huairen City, Shuozhou City, Shanxi Province was issued, and the tenderer was Huairen Heng run Photovoltaic Power Generation Co., Ltd.

It is understood that the project is located in Xinjiayuan Township and Wujiayao Town, Huairen City, Shuozhou City, Shanxi Province, covering an area of about 2784 mu. It is planned to build a 100MW ground photovoltaic grid-connected power station with a DC side installed capacity of 122MWp. A 220kV booster station has been built in Phase I, and the project is connected to the grid at 220kV voltage level. In this phase, the capacity of the booster station in Phase I will be expanded, and the power will be connected to the grid at 220kV voltage level through the outgoing line of Phase I.
The bidding project is divided into one bid section , and the bidding scope includes that the contractor is responsible for the specific site selection and land acquisition of the project and bears the land lease fee during the construction period, and is responsible for the handling of various procedures in the early stage and bears the relevant preliminary expenses. Be responsible for the construction drawing design of photovoltaic power generation, procurement of all materials and equipment, supply, site construction, construction of temporary facilities, commissioning, expansion and transformation of 220KV booster station, grid connection, trial operation, etc. The planned duration of the
project is 12 months . Consortium bidding is accepted
in this tender . The
bidding documents will be obtained from 9:00 on May 21 , 2026 to 9:00 on May 26, 2026. The bid
closing/opening time is 9: 00 a.m. on June 11, 2026.