On September 10, the EPC general contracting project of Manla photovoltaic power generation project was tendered publicly.
The announcement shows that the project is located in Menghai County, Xishuangbanna Dai Autonomous Prefecture, Yunnan Province, with a total installed capacity of 182.7336 MW, a rated installed capacity of 150MW , and an estimated contract price of about 402 million yuan .
The project is connected to the booster station of the photovoltaic power station (which has been put into operation) through 6 circuits of 35kV collector lines. No additional booster station will be built. It is planned to expand the main transformer, GIS and power distribution equipment in Shitouzhai booster station. The contents of this

tender include inventory compensation and technical services, survey and design and special services, equipment procurement and installation in photovoltaic field, equipment procurement and installation in booster station, construction works in photovoltaic field and booster station, 35kV collector line, ecological vegetation restoration, Project coordination, etc.
The project construction unit is Yunlu Energy (Menghai) New Energy Development Co., Ltd. In terms of
performance, this tender requires bidders to provide nearly five years (from January 1, 2022 to the present). Subject to the date of signing the contract) has undertaken at least one design and construction general contracting or EPC general contracting performance of photovoltaic power generation projects with capacity of 100MW (including 100MW) and above.
This tender requires a deposit of 100000 yuan . The deadline for payment of
bid bond is 9:00 on October 10, 2026. The deadline for obtaining the
bidding documents is 00:00 on September 18, 2026. The deadline for
submission of bidding documents is 9:00 on October 10, 2026.