Guangdong Huadian Qingyuan Yingde Yinghongxing Photovoltaic Power Generation Project 5MW-5MWh Energy Storage System Construction Project Tender Announcement

2023-09-12 10:59:39

Guangdong Huadian Qingyuan Yingde Yinghongxing Photovoltaic Power Generation Project 5MW-5MWh Energy Storage System Construction Project has been approved, the tenderer is Guangdong Qingyuan Huadian Power Generation Co., Ltd., and the project funds are self-owned funds and bank loans. This project has met the bidding conditions and is now open for bidding.

(Bidding No.: CHDTDZ041/18-ZB-043)

I. Bidding Conditions

Guangdong Huadian Qingyuan Yingde Yinghong Xingguang Complementary fishing and photovoltaic " Two、 Project Scale and Bidding Scope

2.1 Bidding and Procurement Project Address: Yinghong Town

, Yingde City, Guangdong Province 2.2 Project Scale: 5MW-5MWh 2.3

Bidding and Procurement Project Duration: Completion

before December 20, 2023 2.4 The bidding scope

is divided into one bidding section. Specifically:

III." Bidder Qualification Requirements

[5MW-5MWh Energy Storage System Construction Project of Qingyuan Starlight Photovoltaic Project ]

1. The bidder is an independent enterprise legal person or other organization legally registered within the territory of the People's Republic of China.

2. The bidder has not been ordered to suspend production, business or enter into bankruptcy proceedings.

3. The bidder is not in the penalty period

of prohibition of bidding confirmed by the administrative department or the relevant documents of China Huadian Group Co., Ltd. 4. The person in charge of the unit is the same person or different units with holding or management relationship. They shall not participate in bidding for the same bid section or for the same tender project

that is not divided into bid sections. 5. Bidders shall not be included in the list of serious illegal and dishonest enterprises in the national enterprise credit information publicity system (https://www.gsxt.gov.cn) by the market supervision and administration organ (which has not been lifted during the bid evaluation period).

6. Bidders shall not be included in the "list of discredited executives" by the "Credit China" website (www.creditchina.gov.cn) (which has not been lifted during the bid evaluation period).

7. Bidders shall not be included in the "blacklist" list of joint punishment for dishonesty in production safety by the State Emergency Management Department (www.mem.gov.cn) (which has not been lifted during the bid evaluation period)

8. Bidders shall have at least battery monomer, PCS (energy storage converter), Independent R & D and production capacity of one of the EMS (Energy Management System) products. The test report or product certification

issued by a third-party testing institution shall be provided. 9. The bidder has the qualification

of general contracting of power engineering construction at or above the third level issued by the competent construction administrative department of the state. 10. Performance requirements: from January 1, 2018 to the deadline for bidding, the bidder must have at least one contract performance of not less than 4MW energy storage system general contracting construction project (PC or EPC) (performance certification materials: scanned copies of contracts including cover, procurement content, signing time, signature and seal pages, etc.; The quality acceptance certificate with the user's signature or the settlement invoice corresponding to the bidding performance contract can be used to prove the materials. Otherwise, it will be treated as invalid performance)

11. Consortium bidding

is not accepted for this project. Acquisition

of bidding documents 4.4. Potential bidders who have not registered and applied for platform services are invited to visit the e-commerce platform of Huadian Group (www. Chdtp. National legal working days (09: 00-17: 30) Customer service consultation telephone: 010-62228787 -1, Telephone on duty for non-working days (09: 00-17: 00): 18601069326. Step

2: Register online. Log in to the e-commerce platform of Huadian Group (www. Chdtp.

) Step 3: Bid purchase. Log in to the business system, click the menu "E-Bidding > Participating Projects", check the project, and click "Tender Purchase". After the online payment is completed, the download permission of the bidding documents will be automatically opened, and the bidder will download the tender by himself. Except that the tenderee terminates the procurement of this bidding project voluntarily, the bidding fee is not refundable after sale; the bidder is requested to open the online bank payment function in advance, and it is recommended to complete the online payment (CFCA) through the enterprise bank account; Potential bidders who have paid the bidding fee do not need to pay the bidding fee again when participating in the subsequent bidding activities of this bidding project, but they need to initiate the payment operation, and the platform will automatically complete the exemption of the bidding fee and the opening of the bidding download permission. Step

4: Apply for a mobile digital certificate. After installing the mobile digital certificate APP (Huadian E-Shield Enterprise Edition), please apply for a digital certificate according to the "Mobile Digital Certificate Operation Guide". In the process of encrypting and uploading bidding documents, submitting bidding queries, signing in for bid opening, and replying to bid evaluation queries, you must scan code and sign, otherwise you cannot complete the relevant operations. (APP download path: For mobile terminal APP of Android system, you need to enter "Service Center"-data download-click "Huadian E-Shield Enterprise Version APP (Android version)"; for mobile terminal APP of IOS system, you need to search "Huadian E-Shield Enterprise Version" in the Apple App Store to download and install. Mobile Digital Certificate Operation Guide Download Path: Platform Home "Service Zone" or enter the "Service Center"-Operation Guide section. Step

5: Download the bidding document. Log in to the business system, click the menu "E-Bidding > Participating Projects > Bidding Business Management > Business Homepage", and download the bidding documents and clarification documents. Before downloading the bidding documents, please fill in the billing information in the "Maintain Billing Information" menu. Step

6: Download the offline bidding client. Log in to the business system, click the menu "E-Bidding > Participating Projects > Bidding Business Management > Bidding Client Download", and download the bidding client, operation manual and other related documents. In order to avoid affecting the bidding, the bidder shall download the bidding client and handle the mobile digital certificate in time after the successful purchase of the bidding document, and complete the bidding test 2 working days before the bidding deadline (the bidding document can be withdrawn after the successful bidding), so as to ensure the normal bidding through the bidding client software. Step

7: The bid bond can be paid by telegraphic transfer or bid bond insurance (insured: Huadian Tendering Co., Ltd.). In addition to the above forms, other forms of submission of bid bond will not be accepted. The bid bond submitted

in the form of bid bond insurance can be purchased by logging in the business system of Huadian Group's e-commerce platform — electronic bidding menu — participating projects — business homepage — bond information (currently, the system only accepts bid bond insurance purchased in this way). The insurance period of the bid bond insurance shall not be less than validity period of the bid.

Insurance and policy invoice matters contact Huaxin Insurance Company, consultation telephone: 010-83568910, 18710239654.

Each bidder must participate in the supplier management and evaluation activities of Huadian Group and become a member of the supplier network of Huadian Group, and non-network members will not be able to participate in the bidding; Bidders are invited to visit the e-commerce platform of Huadian Group (www. Chdtp)

. V. Submission

of Bidding Documents 5.5.2 Submission Method: The electronic bidding documents shall be submitted to the e-commerce platform of Huadian Group through the bidding client (www. Chdtp.

Centralized decryption on the e-commerce platform of Huadian Group. The submission process shall be recorded for future reference.

VII. Others

None.

8. If

bidders or other interested parties have objections to the contents of the announcement of this tender project, please raise them during the announcement period. This bidding project only accepts the objections raised through the complaint and objection system of Huadian Group's e-commerce platform, and informs the processing dynamics through the platform. The method is as follows:

at the lower right corner of the home page of the e-commerce platform of Huadian Corporation → complete login or identity verification according to the prompt → select the type (bidding objection) → select the associated project → select the stage → upload the supporting file → maintain the information of the proposer.

Company Name: China Huadian Corporation Guangdong Company

Name: Geng Nan

Tel: 020-82518006

IX. If a bidder (supplier) or other interested party of the supervisory department

considers that the procurement activities do not conform to laws and regulations, it may complain within 10 days from the date it knows or should know. This bidding item accepts complaints only through the complaint and objection system of Huadian Group's e-commerce platform, and informs the processing dynamics through the platform. The method is as follows:

at the lower right corner of the home page of the e-commerce platform of Huadian Corporation → complete the login or authentication according to the prompt → select the type → select the associated project → select the stage → upload the supporting file → maintain the information of the proposer.

Company Name: China Huadian Corporation Guangdong Company

Name: Geng Nan

Tel: 020-82518006

X Contact information

Tenderee: Guangdong Qingyuan Huadian Power Generation Co., Ltd.

Contact person: Xu Huawei

Telephone: 13600212923

E-mail: 14297567@qq.com

Tendering Agency: Huadian Tendering Co., Ltd.

Address: No.

2, Xuanwumennei Street, Xicheng District, Beijing Contact Person: Zhou Jinglei

Tel: 010-83565837

E-mail: zhoujinglei@chd.com.cn

Department E-mail: zhaobiaoyibu@chd.com.

All can be viewed after purchase
Correlation

The public bidding for the reconstruction project of hydraulic and electric control system of roller press in Line A of Dalian Shanshui Cement requires the bidder to have the same performance, qualification and performance ability in the cement industry, and to adopt comprehensive evaluation + secondary quotation.

2026-11-27 19:58:10

Shanshui Group invited public bidding for the ecological restoration project of two mines of Taiyuan Shanshui Cement, adopting the mode of pre-qualification, second round quotation and fixed comprehensive unit price contracting, emphasizing the requirements of qualification, performance, credit and performance.

2026-11-27 19:57:40

Market sentiment is getting stronger and stronger, and some leading manufacturers have released the news that they are about to raise their quotations.

2026-11-27 16:18:26

According to the incomplete statistics of the digital new energy DataBM. Com, from November 16, 2026 to November 22, 2026, there are 37 EPC general contracting projects for photovoltaic power plants in China, as well as DB general contracting, optical storage integrated general contracting and other general contracting projects, involving a project scale of 1.31 GW, with a total winning amount of 3.781 billion yuan. ......

2026-11-25 13:32:08

On November 20, Inner Mongolia Huadian Luanjingtan 1.5 million kilowatt photovoltaic sand control project photovoltaic EPC general contracting section I issued a tender announcement, the tenderer is Inner Mongolia Huadian Luanjingtan Green Energy Co., Ltd. The planned photovoltaic capacity of the project is 1.5 million kilowatts, the supporting ecological treatment is 60,000 mu, the capacity ratio is 1:1, two 220KV booster stations are planned to be built, and the total construction period is 365 days. This tender corresponds to a number of tasks within the scope of the 1 million kilowatt photovoltaic project, and defines the corresponding performance requirements for independent bidding and consortium bidding. Some key equipment is purchased by the tenderer.

2026-11-25 10:23:56

JinkoSolar's "Flying Tiger 3" module won the bid for Guoneng's 151.8 MW fishing-photovoltaic complementary project in Dongxing, Guangxi, demonstrating the competitiveness and market recognition of its high-efficiency photovoltaic products in large-scale ground power stations.

2026-11-25 09:03:16

On November 24, Salt Lake announced that it planned to repurchase shares through centralized bidding with its own capital of 1.5-2 billion yuan, with a maximum repurchase price of 33.66 yuan per share, corresponding to 44.56 million to 59.42 million shares, accounting for 0.84%-1.12% of the total equity. This repurchase is based on the recognition of future development and its own value, and is used to cancel capital reduction for a period of 12 months after the approval of the shareholders'meeting. In the first three quarters, the company's revenue of 18.985 billion yuan and net profit of 8.94 billion yuan increased by 58.37% and 90.09% respectively. The lithium salt business grew explosively. The gross profit rate of lithium carbonate was about 86%. The closing price on the 24th was 22.10 yuan, and the market value was 116.944 billion yuan.

2026-11-24 17:09:37

On November 20, Inner Mongolia Huadian Luanjingtan Green Energy Co., Ltd. issued a tender announcement for the EPC general contracting section of Inner Mongolia Huadian Luanjingtan 1.5 million kilowatt photovoltaic sand control project.

2026-11-24 17:00:02

The total investment is 752 million yuan.

2026-11-24 15:21:57

Shanshui Group invited public bidding for the mine road renovation project of Anqiu Company, adopting the mode of pre-qualification, second round quotation and fixed comprehensive unit price contracting, emphasizing compliance, qualification requirements and the whole process of credit review.

2026-11-23 23:57:20

Zibo Company of Shanshui Group invited public bidding for coal procurement in November 2026, adopting online one-time quotation and winning the bid at the lowest price (exceeding the market price). The main body of signing and settlement is Jinan Shanshui Logistics Port, with a performance bond mechanism of 1 million yuan.

2026-11-23 23:56:52

Chifeng Company of Shanshui Group carries out public inquiry and procurement on crusher end disc and rotor disc, adopts two-round online quotation, strictly controls supplier qualification and credit, and emphasizes intellectual property compliance and performance ability.

2026-11-23 23:56:47

On November 17, the termination announcement of the EPC general contracting project of the 400MW photovoltaic project of Kecha Bingdi Fusion Rui Carbon Energy was issued. The project involved two bid sections: the 001 bid section was the EPC general contracting project, and the 002 bid section was the EPC general contracting supervision project. Both bid sections were terminated for some reasons.

2026-11-23 17:46:10

On November 18, China Resources Power Tongchuan 100 MW/200 MWh Independent Energy Storage Power Station Project-Energy Storage Area PC General Contracting Project Tender Announcement was issued. The project is contracted in the mode of construction general contracting. The scope of the project includes: procurement of all equipment and materials in this bid section, unloading and storage (including equipment supplied by Party A), cleaning and coordination of attachments on the ground within the scope of this bid section, civil engineering, installation, commissioning, testing, trial operation, quality assurance, etc.

2026-11-23 16:58:17

On November 22, the bidding results of the wet desulfurization EPC construction project of the 4000t/d clinker new dry process cement production line (supporting 7.5MW pure low-temperature waste heat power generation system) of Zhangye Qilianshan Cement Co., Ltd. were announced. Guangdong Nanda Environmental Protection Co., Ltd. won the bid with the bid amount of 14.25 million yuan.

2026-11-23 16:01:37

Expected this week (11.23-11.27) spot prices continue the trend of weak volatility, light trading situation is difficult to change in the short term.

2026-11-23 15:54:00

Since November, the EPC general contracting project of energy storage power station has successively issued termination and extension announcements, including the failure of the winning bidder to sign the contract as scheduled and major changes in the project.

2026-11-23 13:35:07

The People's Court of Tangxian County, Baoding City, Hebei Province, will conduct a public auction on Taobao Online Judicial Auction Platform from 10:00 on December 10 to 10:00 on December 11 (except for delay).

2026-11-23 09:14:49

Shanshui Group carried out public bidding for geological environment control and land reclamation project in Section 1 of Hougou Mine in Yishui, adopting the mode of pre-qualification, second round quotation and fixed comprehensive unit price contracting.

2026-11-20 19:57:46

This week, there was a partial shortage of high-efficiency component products from some head manufacturers.

2026-11-20 16:22:08

According to the incomplete statistics of the digital new energy DataBM. Com, from November 9, 2026 to November 15, 2026, there are 39 EPC general contracting projects for photovoltaic power plants in China, as well as DB general contracting, integrated optical storage general contracting and other general contracting projects, involving a project scale of 1.33 GW and a total winning amount of 3.501 billion yuan. ......

2026-11-20 14:52:47

Recently, the 200 MW fishing-photovoltaic complementary photovoltaic project in Qi'an, Shucheng County, China Guangdong Nuclear Power Corporation, contracted by China Construction Eighth Bureau General Contracting Construction Co., Ltd., was officially started.

2026-11-20 11:09:13

Saving an enterprise is not only a qualification and three production lines, but also a continuous production capacity and employment.

2026-11-19 15:20:00

According to the general contracting company of China Construction Eighth Bureau, recently, the 200 MW photovoltaic project in Qi'an, Shucheng County, China Guangdong Nuclear Power Corporation, which was contracted by the company, was officially started. The project uses the fishing-photovoltaic complementary mode to promote the coordinated development of "six networks" through the construction of new power grids.

2026-11-19 09:36:25

Shanshui Group made a public inquiry and price comparison on the supervision service of SCR denitrification ultra-low emission transformation project of Yantai and Yantai Xinghao Company, and implemented the second round of quotation and bid division, requiring bidders to have corresponding qualifications, performance and credit conditions.

2026-11-18 19:56:39

On November 17, China Datang Group Co., Ltd. officially issued a tender announcement for the procurement of lithium iron phosphate battery energy storage system framework in 2026-2027.

2026-11-18 16:35:36

G6025 Dongkong-Tianzhu (boundary between Hunan and Guizhou) Expressway in Suining, the exit of Baoshipan Tunnel in Matang Miao and Yao Township and the exit of Chashan Tunnel in Shuikou Township started construction one after another at 11-18, marking that the Suining section has entered the substantive construction stage.

2026-11-18 15:46:16

On November 17, the tender announcement for EPC general contracting of 500 MW/2000 MWh shared battery energy storage project in Tongxingtang, Wuzhong, Ningxia was officially issued. The tenderer of the project is Ningxia Youhui Zhentang Energy Co., Ltd. and the construction site is located in Wuzhong City, Ningxia Hui Autonomous Region.

2026-11-18 10:55:54

Looking forward to this week (11.16-11.20), large upstream factories will hold the bottom line of production reduction and price guarantee, and there is little room for spot price reduction. It is expected that the price of silicon materials will continue to fluctuate at a low level in the short term.

2026-11-17 13:14:08

On November 16, the tender announcement for the 300 MW/1200 MWh independent energy storage project of the 34th Regiment of the 2nd Division of the Sinkiang Production and Construction Corps was officially issued.

2026-11-17 10:51:45

Shuozhou Shanshui New Age Cement Company carries out public bidding for the second gear tire of rotary kiln, requiring professional foundry enterprises to bid, and implements the system of fixed total price, first invoice and then payment, strict quality assurance and drawing confirmation.

2026-11-16 19:56:53

The quality of battery equipment is not up to standard.

2026-11-16 16:14:38

On November 14, the official website of the Provincial Development and Reform Commission released the dynamic news that the feasibility study report of Nanxinhe high-speed rail was officially approved: "Recently, the National Development and Reform Commission approved the feasibility study report of the new Nanyang-Xinyang-Hefei Railway."

2026-11-16 15:55:49

According to the authorization of the board of directors of the Company, the Company intends to continue to promote the listing for sale, and adjust the listing base price of the Target Equity from RMB13,500,800 to RMB12,150,800 (10% lower than initial listing price), while the listing base price of the Target Creditor's Rights remains at RMB70 million. After the adjustment, the total base price for the second listing of the Target Equity and the Target Creditor's Rights is RMB82,150,800, and other listing conditions remain unchanged.

2026-11-16 13:44:54

Phosphogypsum acid co-production is a set of strong coupling process, each process checks and balances each other, there is no independent cement section and independent acid production section. Only by abandoning the single-line cement thinking from the design source, making up for the shortcomings of raw material homogenization and material system in the normal temperature section, straightening out the assessment logic, and building a technical team adapted to the coupling process, can project get rid of the predicament of putting into operation with diseases and long-term inefficient technological transformation, and truly realize the technical and economic value of solid waste recycling.

2026-11-16 10:24:01

In the past two weeks, the capacity of the photovoltaic module collection market has doubled, but the capacity of the bidding end has fallen sharply.

2026-11-16 09:24:34

The new regulations on energy efficiency grades are about to be implemented, and this week, the leading manufacturers have taken the lead in inventory clearance.

2026-11-13 16:57:24

On November 11, Geely issued an EPC tender announcement for the 2026 Tangshan Qianxi 200 MW/800 MWh Independent Energy Storage Project, which is located in Qianxi County, Tangshan City, Hebei Province.

2026-11-13 15:23:48

Shuozhou Shanshui New Era Cement Co., Ltd. purchases a set of kiln inlet high temperature flue gas online analyzer through public bidding, which requires the qualification of the manufacturer/integrator, the performance and comprehensive ability of the cement industry, the total cost is fixed, and no margin is charged.

2026-11-12 20:01:03

The Northeast Operating Area of Shanshui Group carried out public inquiry and procurement of slag powder from November 2026 to March 2027, requiring suppliers to have qualifications, supply guarantees and credit compliance conditions, and to operate online throughout the process.

2026-11-12 20:00:55

Shanshui Group invited public bidding for power agency purchasing services covering 85 enterprises in 9 provinces in 2027, with an estimated annual electricity consumption of 1.685 billion kWh, requiring bidders to have cross-provincial electricity sales qualifications, cement industry performance and performance capabilities.

2026-11-12 19:57:27

Shanshui Group made an open procurement inquiry for the 2026.11 – 2027.03 clinker transportation projects of Jinan Century Innovation and Shanxian Company, requiring bidders to have qualifications, transportation capacity, reputation and compliance operation capabilities, and to operate the whole process online.

2026-11-12 19:57:09

On November 11, China Nengjian announced the successful candidates for the collection of photovoltaic modules in 2026, involving 23 photovoltaic enterprises.

2026-11-12 17:19:40

On November 10, the EPC general contracting project of Wuzhai 200 MW/400 MWh grid-side energy storage power station in Xinzhou, Shanxi, issued a tender termination announcement. The announcement shows that due to the significant changes in the implementation of the project, the bidding activities of the project will be terminated after the study and decision of the tenderer.

2026-11-12 14:44:44

Recently, in response to questions from investors, Tapai Group said that according to the feedback from the Central Environmental Protection Supervision Group and the rectification requirements of Guangdong Province, the annual output of cement clinker production lines in the province should not exceed the annual record capacity. The Provincial Department of Industry and Information Technology issued a document to the local departments of industry and information technology, and the enterprises should report the data to the Bureau of Industry and Information Technology at the beginning of each month, and finally summarized to the Provincial Department of Industry and Information Technology. The implementation is stricter. In the first three quarters, some leading enterprises overproduced by a large margin, which reduced the production margin in the fourth quarter and improved the supply-demand relationship in stages.

2026-11-12 13:30:12

Recently, Huadian Group issued a tender announcement for EPC general contracting of three photovoltaic projects, involving Guizhou and Sichuan, with a total capacity of 2010 MW.

2026-11-11 17:44:45

According to the incomplete statistics of the digital new energy DataBM. Com, from November 2, 2026 to November 8, 2026, there are 45 EPC general contracting projects for photovoltaic power plants in China, as well as DB general contracting, optical storage integrated general contracting and other general contracting projects, involving a project scale of 2.378 GW, with a total winning amount of 5.771 billion yuan. ......

2026-11-11 13:31:13

Due to major changes in the implementation of the project, the tenderee has decided to terminate the bidding activities of the project.

2026-11-11 10:21:42

On November 8, Xinjiang Shihezi Sheng'an Huachu 300 MW/1200 MWh Independent Energy Storage Project EPC Tender Announcement, the source of project funds is self-financing 960 million yuan, the unit price is 0.8 yuan/Wh, the tenderer is Sheng'an Huachu (Xinjiang) Technology Co., Ltd.

2026-11-10 10:54:29

The tenderer of the two abandoned projects is Inner Mongolia Duorui Energy Technology Co., Ltd.

2026-11-09 17:21:23