Project name: JSSG-2 Bid Section
of Jingmen-Shayang Section of Jingmen-Jianli Expressway via Qianjiang Bidding scope: Subgrade works within the scope of JSSG-2 Section of Jingmen-Shayang Section of Jingmen-Qianjiang-Jianli Expressway (including three main canals, K6 + 500 ~ K45 + 040), pavement works (K3 + 116.
Planned commencement date: September 30
, 2025 Estimated contract price: 280000: RMB million
Bid winning information:
First place: China Construction Third Engineering Bureau Group Co., Ltd.
Hubei Road & Bridge Group Co., Ltd.
Bid price (RMB) : 2463888888.88
No.2: Jiangxi Communications Engineering Group Co., Ltd.
Bid Price (RMB): 2468722615.88
No.3: CCCC First Harbor Engineering Co., Ltd.
Bid Price (RMB): Name of 2473803019.07
Project: Announcement
of Successful Candidates of Dajiaoting Plot 624 Project (South Area) Construction Site: Plot
624, No.4, Dajiaoting Construction Scale: The total construction area is about 241,696.6 The above-ground construction area is about 163462. 37 ㎡, and the underground construction area is about 78234.
Estimated contract price: 139800 (ten thousand yuan)
Construction period requirements: 979 calendar days
Bidding scope: All the contents shown in the construction drawings of the southern area of the 624 plot project in Dajiaoting. It includes foundation and foundation, main structure, building decoration, roof engineering, building water supply and drainage, heating, ventilation and air conditioning, building electricity, intelligent building, building energy saving, elevator and outdoor engineering.
Bid winning information:
First place: China Construction Second Engineering Bureau Co., Ltd.
Bid price (RMB): 1184050165.64
Second place: Beijing Urban Construction Group Co., Ltd.
Bid price (RMB ): 1184050165.64
No.3: China Railway Construction Engineering Group Co., Ltd.
Bid Price (RMB): 1184050165.64 Project Name: Announcement on
Bid-winning Result of EPC of High-end Residential Project of Liangshan Xuefu :
Bid Winning Unit: First Construction Project of China Construction Third Engineering Bureau Limited Liability Company
Consortium Unit: CITIC Architectural Design & Research Institute Co., Ltd.
Total Bid Price (RMB 10,000): 72081. 904780
Project Name: Public Announcement
of Successful Candidates of Science City Smart City Phase II Investment Amount: 6,909 00000 (RMB)
Scope of tender: Phase II of Science City and Smart City, including No.1 supporting building, No.2 factory building and No.3 basement, with a total planned land area of about 56391. 35 square meters, a total construction area of about 186214. 22 square meters, and a total capacity construction area of about 182811. 91 square meters. The non-capacity building area is about 3,607.92 square meters; the maximum building floor is 6 floors above the ground and 1 floor underground, the maximum building height is 59.85 meters, the maximum span is 16 meters, of which: the building area of No.1 supporting building is about 4,726.89 square meters, the capacity building area is about 4,932.51 square meters, the building height is 21.50 meters; The building area of No.2 factory building is about 179395. 07 square meters, the capacity building area is about 177879. 40 square meters, 6 floors above the ground, and the building height is 59.85 meters; The construction area of basement No.3 is about 2092.
Bidding content: Science City Smart City Phase II, mainly including but not limited to: (1) No.1 supporting building (including civil engineering, electrical engineering, water supply and drainage engineering, fire engineering, seismic support engineering, intelligent engineering, HVAC engineering, elevator engineering, etc.); (2) Plant 2 (including Area A: civil engineering, electrical engineering, elevator engineering, water supply and drainage engineering, seismic support engineering, HVAC engineering, fire protection engineering, intelligent engineering, etc.; Area B: civil engineering, electrical engineering, elevator engineering, high and low voltage power distribution, water supply and drainage engineering, seismic support engineering, HVAC engineering, fire protection engineering, intelligent engineering, etc.; Zone C: civil engineering, electrical engineering, elevator engineering, water supply and drainage engineering, seismic support engineering, HVAC engineering, fire protection engineering, intelligent engineering, etc.; Zone D: civil engineering, electrical engineering, water supply and drainage engineering, seismic support engineering, HVAC engineering, fire protection engineering, intelligent engineering, etc.); (3) Basement 3 (including civil engineering, electrical engineering, water supply and drainage engineering, seismic support engineering, HVAC engineering, fire engineering, intelligent engineering, etc.); (4) Foundation, earthwork, foundation pit engineering, etc.; (5) Civil air defense basement (including electrical engineering, water supply and drainage engineering, HVAC engineering, etc.); (6) Outdoor works (including landscape works, greening works, electrical works, water supply and drainage works, fire protection works, landscape electrical works, landscape drainage works, floodlighting works, signs, etc.). All engineering contents in the construction drawings confirmed by the Employer; (7) Engineering BIM application; (8) Other contents of project construction: ① Assist in handling all the approval and construction work required by Dongguan City and relevant regulations in the early stage of the project, including but not limited to the "Construction Land Planning Permit", "Construction Project Planning Permit", "Construction Project Construction Permit", other supporting related approval, etc., until the government approval documents required for the legal implementation of the project are obtained; ② All works such as project completion acceptance and filing, completion settlement (final settlement), defect warranty, etc. shall be handled; ③ Relevant procedures for various approval items required for the completion of the project; (9) The Contractor shall not refuse to carry out relevant work and bear the corresponding expenses on the grounds of the items not listed above. The Employer reserves the right to adjust the scope of the contract, and the Contractor shall not raise any objection.(10) Be responsible for the construction management of the whole process of the project implementation stage, including but not limited to the arrangement of the project implementation plan, the implementation progress and the management and filing of relevant data; be responsible for the handover procedures of the project and data after the completion of the project, and complete other work required by the Employer. Note: 1. For other detailed bidding scope and contents, please refer to Chapter IX of the Bidding Document. 2. For matters not covered in the above bidding scope, please refer to the bidding drawings and meet the requirements of the design documents.
Maximum bidding price: 515803108.84 (RMB
) Bid winning information:
First place: China Construction First Bureau (Group) Co., Ltd.
Bidding price (RMB): 514,656, 879.71
Second place: Shanghai Baoye Group Co., Ltd.
Tender offer (RMB): 514,737,138.38
Third place: China MCC22 Group Co., Ltd.
Tender offer (RMB): 514,983. 555.01
Project Name: Announcement of
Successful Candidates for General Contracting of Civil Construction of Storage Project of China Grain Storage Rizhao Reserve Co., Ltd. SRC = "https://img7.ccement.com/news/2509/richtext/img/46loohi7dnb1758613484829.
Duration Requirement: Planned Start, Completion time: September 30, 2025-February 1, 2027. Total investment amount of the
project: about 493,000,000 yuan; investment amount of bid section I of this bidding: about 242,000,000 yuan; investment amount of bid section II of this bidding: about 251,000,000 yuan. Division of
bid sections: The Project is divided into 2 bid sections. Section
I: 16 squat silos (including the trestle between silos), 1 # transfer tower and 2 # transfer tower (including the conveying trestle), 3 flat silos, mechanical warehouse, auxiliary room, fire water tank, comprehensive management room (including canteen, office building and dormitory), guard room B, including roads, fences, water and electricity pipe network and other ancillary facilities;
The second bid section is: 16 squat silos (including the trestle between silos), 3 # transfer tower and 4 # transfer tower (including the conveying trestle), cleaning center, tower and support (including the conveying trestle), one-stop service center, guard room A, the foundation of the above buildings and structures and the foundation of the weighbridge, including ancillary facilities such as roads, fences and water and electricity pipe networks.