The Catalogue of Classified Management of Eco-environmental Impact Assessment of Construction Projects (2027 Edition) has been deliberated and adopted by the 3rd Ministerial Meeting of the Ministry of Ecology and Environment in 2026 on September 3, 2026, and is hereby promulgated for implementation as of January 1, 2027. Huang Runqiu, Minister of the Ministry of
Ecology and Environment, November 16
, 2026, List
of Classified Management of Eco-environmental Impact Assessment of Construction Projects (2027 Edition)
Article 1 In order to implement the classified management of ecological environmental impact assessment of construction projects, this catalogue is formulated in accordance with the relevant provisions of the Ecological Environment Code of the People's Republic of China. Article
2 According to the characteristics of construction projects and the sensitivity of the ecological environment in the region, the possible impact of construction projects on the ecological environment shall be taken into account comprehensively, and the ecological environment impact assessment of construction projects shall be classified and managed.
The construction unit shall, in accordance with the provisions of this directory, organize the preparation of the report on the ecological environmental impact of the construction project, the report form on the ecological environmental impact or the registration form on the ecological environmental impact. Article
3 The term "eco-environmental sensitive areas" as mentioned in this catalogue refers to all kinds of protected areas at all levels established according to law and areas that are particularly sensitive to the eco-environmental impact of construction projects. It mainly includes the following areas:
(1) National parks, nature reserves, scenic spots, world cultural heritage sites, world natural heritage sites, and drinking water source protection areas;
(2) The scope of control over the red line of ecological protection other than (1), permanent basic farmland, basic grasslands, important wetlands, natural forests, key protected wildlife habitats, key protected wildlife growth and breeding sites, natural spawning grounds, feeding grounds, wintering grounds and migration channels for important aquatic organisms, natural fishing grounds and aquatic germplasm resources. Forbidden and protected areas of desertified land, closed and semi-closed sea areas;
(3) areas with the main functions of residence, scientific research, medical and health care, culture and education, office work of organs and organizations, social welfare, and cultural relics protection units. The report on the impact of the
ecological environment and the report form on the impact of the ecological environment shall focus on the analysis of the impact of construction projects on the sensitive areas of the ecological environment. Article
4 Construction units shall strictly determine the categories of ecological environmental impact assessment of construction projects in accordance with this list, and shall not change the categories of ecological environmental impact assessment without authorization. The
construction content involves two or more industry categories and general processes in this list, and the category of ecological environmental impact assessment is determined according to the highest single grade.
The construction content does not involve the reconstruction and expansion projects of the main project, and the category of ecological environmental impact assessment is determined according to the content of the reconstruction and expansion project. Article
5 Construction projects not specified in this list shall not be included in the management of ecological environmental impact assessment of construction projects; If the competent department of ecological environment at the provincial level considers it necessary to incorporate the construction projects not specified in this list into the management of ecological environmental impact assessment of construction projects, it may, according to the characteristics of pollution factors, ecological impact factors, greenhouse gas emissions and the sensitive nature and degree of the ecological environment in which the construction projects are located. Report to the Ministry of Ecology and Environment for confirmation and implementation. Article
6 The Ministry of Ecology and Environment shall be responsible for the interpretation of this list and shall revise it in due course. Article
7 This Directory shall come into force as of January 1, 2027. The Catalogue of Classified Management of Environmental Impact Assessment of Construction Projects (2021 Edition) (Decree No.16 of the Ministry of Ecology and Environment) shall be abolished at the same time.
According to the Catalogue of Classified Management of Eco-environmental Impact Assessment of Construction Projects (2027 Edition), cement, lime and gypsum manufacturing 301 (except for the substitution of agricultural and forestry biomass fuels in cement kilns) is listed.


Note:
7. Pilot projects shall be implemented in accordance with the provisions of the corresponding industry categories in this directory.
8. Equipment renewal within the scope of existing construction land, no new product types, production capacity, no increase in pollutant types, emissions and ecological environment risks, no change in production processes, pollutant discharge methods and discharge directions, and be included in the project of pollutant discharge permit management. It is not included in the management of ecological environmental impact assessment of construction projects.
浙公网安备33010802003254号