Project Name: Fuqing Ronggang Agricultural Development Co., Ltd. Rural Revitalization Cultural Tourism Holiday Project
Project Overview: Fuqing Ronggang Agricultural Development Co., Ltd. Rural Revitalization Cultural Tourism Holiday Project is a construction project approved by Fuqing Municipal Development and Reform Bureau (Approval No. Min Fa Gai Bei [2025] A060459). It aims to build a comprehensive demonstration area integrating rural revitalization, cultural tourism and recreation and vacation. The project is planned to include a central square, a conference center, a research and study base, an agricultural planting park, 208 hotel and standard guest rooms, a theme park and other supporting facilities, covering an area of 71866. 67 square meters, with a total construction area of 621634 square meters and an annual reception of 500,000 visitors.
Bid winning information:
First place: CCCC Construction Group Southeast Construction Co., Ltd.
Quotation amount (10,000 yuan): 261544. 5
Second place: CCCC First Highway Engineering Co., Ltd. Xiamen Engineering
Co., Ltd. Quotation amount (10,000 yuan): 2621 14.5
Third place: Fujian Communications Construction Group Engineering Co., Ltd.
Quotation amount (ten thousand yuan): 258295. 5
Project name: Fuyan UAV Industrial Park Construction Project EPC General Contracting Successful Candidate Announcement
Project Location: Shaanxi Province. Bidding conditions of Weinan City
: The EPC general contracting of the construction project of this Fuyan UAV Industrial Park has been approved by the project approval/approval/filing authority, the source of project funds is self-raised by other fund enterprises, and the tenderer is Beiyan (Xi'an) Digital Industry Group Co., Ltd. This project has met the bidding conditions, and the current bidding method is public bidding.
Construction Scale: The total land area of the construction project of Fuyan UAV Industrial Park is about 59564. 49 m ' (about 89.35 mu), and the total building area is about 130858 m', of which: the above-ground building area is about 114 352 m *, and the underground building area is about 16506 ㎡ '. At the same time, the construction of outdoor greening, roads, pipe networks and other supporting facilities will be completed.
Bid winning information:
First place: CCCC First Highway Engineering Co., Ltd.
Quotation amount (10,000 yuan): 62640.50
Second place: CCCC Second Highway Engineering Co., Ltd
. Quotation amount (10,000 yuan): 62 246.0125
No.3: China Railway Construction Urban Construction and Transportation Development Co., Ltd.
Quotation amount (ten thousand yuan): 62478. 15
Project name: Construction
of Boluo Lake Flood Control Project in Nong'an County Construction site: located in Bajilei Town, Nong'an County and
Bidding content of Nong'an Town: a new pumping station will be built, 0.67 kilometers of new diversion canal will be built at the entrance of the pumping station, and 20.333 kilometers of new ductile iron pipeline with a diameter of DN1600 will be built. The pipeline crosses 1 provincial road and 14 county and township roads (12 concrete roads). There are 2 asphalt pavements, 39 field roads and 5 rivers.
Planned construction period: from December 28, 2025 to October 31, 2026.
Bid winning information:
First place: CCCC Second Harbor Engineering Co., Ltd.
China Railway 19th Bureau Group Co., Ltd.
Bid winning price: 193771738.84 yuan
Second place: Fengjia Construction Co., Ltd.
Bid winning price: 189987975 yuan
Third place: Shandong Zhongxing Installation Engineering Co., Ltd.
Bid winning price: 191594263.03 yuan
浙公网安备33010802003254号