of Xuzhou-Fuyang Expressway: This project is located in Dapeng Town, Tongshan District, Xuzhou City, Jiangsu Province. It starts from Beijing-Taiwan Expressway on the west side of Xuzhou City and ends at the boundary between Jiangsu and Anhui provinces, connecting with the Anhui Section of Xuzhou-Fuyang Expressway. Construction Content: The total length of this project is about 7 kilometers. It adopts the technical standard of two-way four-lane expressway. The design speed is 120 kilometers per hour and the roadbed width is 27 meters. The construction contents include subgrade engineering, pavement engineering, bridge and culvert engineering (including rail-related bridges), crossing engineering, traffic engineering and facilities along the line, mechanical and electrical engineering (including external power access engineering), greening landscape, environmental protection engineering, drainage engineering, etc. Construction period: The construction period of this project is tentatively set at 3 years, from the project commencement date to the handover date, subject to the final results of the approved or approved feasibility study report. Project investment estimation and capital proportion: The project investment is estimated to be about 1.6 billion yuan, and the capital proportion is considered to be 40% of the total project investment. The final result of the approved or approved feasibility study report shall prevail. Note: The construction plan, estimated investment amount and capital ratio of this project are subject to the results of the feasibility study report approved or approved, the estimated investment amount is subject to the approval of the preliminary design, and the final total investment of the project is subject to the final accounts of completion. Bidding scope: The bidding scope is the investor of Jiangsu Section of Xuzhou-Fuyang Expressway (project name). After winning the bid, the investor shall establish a project company in accordance with the Company Law of the People's Republic of China and other relevant laws and policies. The project company shall be responsible for the whole process of project planning, fund raising, construction implementation, operation management, debt repayment and asset management, operate independently and assume sole responsibility for its profits and losses. In accordance with the agreement on the right to invest and operate, the highway (including the right to use the land), the ancillary facilities of the highway and the relevant information shall be transferred to the designated departments of the government free of charge. For the railway-related works in this project, the project company entrusts the relevant railway unit as the railway-related entrusted construction unit. Bid winning information: No.1: Anhui Construction Engineering Group Co., Ltd. No.2: CCCC Second Harbor Engineering Co., Ltd. No.3: Shaanxi Road & Bridge Group Co., Ltd.
浙公网安备33010802003254号