G219 Yunnan-Napo Pingmeng Highway Design and Construction General Contracting
Construction Location: Baise City, Guangxi Zhuang Autonomous Region
Construction Scale: G219 Yunnan-Napo Pingmeng Highway starts from Waideng Bridge at the junction of the existing National Highway 219 between Yunnan Province and Guangxi. It ends at the junction of Napo County and Jingxi City, with a total length of 112.474 kilometers, a design speed of 40 km/H, a roadbed width of 8.5 meters and a pavement width of 7.5 meters. The whole line is constructed according to the standard of two-way two-lane second-class highway.
№ 1 Length of contract section (km) 65, survey and design of construction drawing of G219 Yunnan boundary to Napo Pingmeng Highway (Bainan Section) and construction of corresponding works. The specific work contents include ① location survey (including supplementary location survey), detailed survey, construction drawing design and construction drawing budget preparation of highway engineering (including route, subgrade, pavement, bridge and culvert, intersection engineering, greening and environmental protection engineering, etc.), traffic engineering and facilities along the line; ② preparation of bill of quantities and special technical specifications for the project; ③ engineering construction; ④ defect repair, etc. The Employer shall be responsible for entrusting the construction drawing survey and design consultation, safety assessment, project completion (handover) quality inspection, water and soil conservation monitoring and acceptance, and environmental protection monitoring and acceptance, and shall pay the relevant expenses.
№ 2 Length of contract section (km) 47.4892, survey and design of construction drawing of G219 Yunnan-Napo-Pingmeng Highway (Pingmeng Section) and construction of corresponding works. The specific work contents include ① location survey (including supplementary location survey), detailed survey, construction drawing design and construction drawing budget preparation of highway engineering (including route, subgrade, pavement, bridge and culvert, intersection engineering, greening and environmental protection engineering, etc.), traffic engineering and facilities along the line; ② preparation of bill of quantities and special technical specifications for the project; ③ engineering construction; ④ defect repair, etc. The Employer shall be responsible for entrusting the construction drawing survey and design consultation, safety assessment, project completion (handover) quality inspection, water and soil conservation monitoring and acceptance, and environmental protection monitoring and acceptance, and shall pay the relevant expenses.
Bid winning information:
№ 1 contract section
First place: CCCC Road & Bridge Construction Co., Ltd.
CCCC Highway Planning & Design Institute Co., Ltd.
Bid price: 89482 RMB
1,720 Second place: CCCC First Highway Engineering Group Co., Ltd.
and CCCC First Highway Survey and Design Institute Co., Ltd.
Bid price: 89445: RMB
4,830,000 Third place: Zhejiang Communications Engineering Group Co., Ltd.
Guizhou Communications Planning, Survey and Design Institute Co., Ltd. Tender offer of the Company
: 89692 RMB 9,600
№ 2 Contract Section
No.1: CCCC Second Harbor Engineering Co., Ltd.
CCCC Second Highway Investigation and Design Institute Co., Ltd
. Tender offer: 6,351 40403: 0.002 yuan
Second place: Guizhou Highway Engineering Group Co., Ltd.
Anhui Transportation Planning and Design Institute Co., Ltd.
Bid price: 635009903.283: 0.002 yuan
Third place: CCCC First Highway Engineering Co., Ltd. Bid price of CC
CC First Highway Investigation and Design Institute Co.,
Ltd.: 636184397.55 RMB
浙公网安备33010802003254号