The information of winning the bid for the 5.7 billion yuan expressway project is coming.

2026-04-02 11:14:39

The new construction of Poyang-Wannian Expressway is located in Wannian County and Poyang County of Shangrao City and Leping City of Jingdezhen City, Jiangxi Province. The route starts from Wanwan Expressway, intersects with Hangzhou-Changzhou Expressway, and ends at the planned Pengdong Expressway, with a total length of 40.126 km. The project adopts the standard construction of two-way four-lane expressway, with a design speed of 100km/H and a subgrade width of 26.0m. There are 18 bridges with a total length of about 19638 m and 2 tunnels with a total length of 775 m, and the ratio of bridge to tunnel is 50. 87%. Six interchanges, three toll stations, one service area, one maintenance area and related traffic are set up synchronously.

Poyang-Wannian Expressway New Construction Project Franchise Project Investor Bidding

Project Overview: The Poyang-Wannian Expressway New Construction Project is located in Wannian County and Poyang County of Shangrao City and Leping City of Jingdezhen City, Jiangxi Province. The route starts from Wanwan Expressway, intersects with Hangzhou-Changzhou Expressway, and ends at the planned Pengdong Expressway, with a total length of 40.126 km. The project adopts the standard construction of two-way four-lane expressway, with a design speed of 100km/H and a subgrade width of 26.0m. There are 18 bridges with a total length of about 19638 m and 2 tunnels with a total length of 775 m, and the ratio of bridge to tunnel is 50. 87%. Six interchanges, three toll stations, one service area, one maintenance area and related traffic, electromechanical and housing construction supporting projects are set up synchronously. The total investment of the project is estimated to be about 5.759 billion yuan, which is implemented in the franchise mode.

Bidding scope: This bidding is the franchise investor of the project. The successful bidder is responsible for the whole process of investment and financing, survey and design, construction and implementation, operation and management, maintenance and repair, debt repayment and expiration transfer of the project. The cooperation period includes the construction period and the charging operation period.

Bid winning information:

First bid winning candidate: Anhui Construction Engineering Group Co., Ltd. (Leader)

Anhui Construction Engineering Group Investment Development Co., Ltd.

Anhui Construction Engineering Highway and Bridge Construction Group Co., Ltd.

Anhui Construction Engineering Construction Investment Group Ltd.

Anhui Jianggong Lugang Construction Group Co., Ltd.

Anhui Research and Design Institute

of Building Science Second Successful Candidate: CCCC Second Harbor Engineering Co., Ltd.

Third Successful Candidate: Longjian Road & Bridge Co., Ltd. (Lead) 0 HTML 0 UNK1 2 Shandong Communications Planning and Design Institute Group Co., Ltd. 0 HTML0 UNK1 3

All can be viewed after purchase
Correlation

The new construction of Poyang-Wannian Expressway is located in Wannian County and Poyang County of Shangrao City and Leping City of Jingdezhen City, Jiangxi Province. The route starts from Wanwan Expressway, intersects with Hangzhou-Changzhou Expressway, and ends at the planned Pengdong Expressway, with a total length of 40.126 km. The project adopts the standard construction of two-way four-lane expressway, with a design speed of 100km/H and a subgrade width of 26.0m. There are 18 bridges with a total length of about 19638 m and 2 tunnels with a total length of 775 m, and the ratio of bridge to tunnel is 50. 87%. Six interchanges, three toll stations, one service area, one maintenance area and related traffic are set up synchronously.

2026-04-02 11:14:39

The Port Coal Price Statistics Table shows the port coal prices in different regions. On the whole, some port prices have changed and some have not changed. Among them, the price change of Indonesian coal (3800 calorific value) at Xinsha Port is relatively large, with an increase of 30%; the price change of general bituminous coal (5500 calorific value, 5000 calorific value) at Qinhuangdao Port, general bituminous coal (5500 calorific value) at Sime Darby Port and Indonesian coal (3800 calorific value) at Haichang Port is relatively small, with a change value of 0. The data comparison time is April 2, 2026 and March 26, 2026.