Bid winning information of large projects in Heilongjiang, Hebei, Anhui and Sichuan

2026-01-29 11:46:01

Bengbu Section of Huaiyuan-Fengtai Expressway, the project route starts from the northwest side of Junwang Service Area of G3 Beijing-Taiwan Expressway in Chenji Town, Huaiyuan County, connects with the current G3 Beijing-Taiwan Expressway, lays from north to south, passes through the west side of Bengbu Airport, crosses the North Feihe River on the west side of Feihe Town, and then crosses the Vortex River and the Euryale River on the west side of Fannan Town and the east side of Heliu Town. It continues southward through the east side of Lanqiao Town and the west side of Bailianpo Town, crosses the Cihuai New River, ends at the boundary of Bengbu and Huainan in Huangwei Village, Tangji Town, and connects with the Huainan section of Huaiyuan-Fengtai Expressway, with a total length of about 55.48 km.

Project Name: Announcement of

Successful Candidates for the Biomass Recycling Industrial Park Franchise Project in Fuyu County, Heilongjiang Province Construction Location: The construction site is located in

the former Chenming Paper Factory in Fuyu County, Qiqihar City, Heilongjiang Province Construction Scale: The project covers a total area of 1091.6 mu. Construction of a 400,000-ton/year bleached hardwood pulp production line and a 1,600,000-ton/year raw material treatment plant. 3.

Service period: The franchise period of this project is 20 years. If the project is not implemented within three years, the government has the right to withdraw the franchise free of charge.

Bidding scope: This project is implemented in the franchise mode, and the implementation mode of "Build-Own-Operate (BOO)" is proposed to be adopted.

Bidding control price: The total investment is 4040 million yuan

Bid winning information:

First place: Heilongjiang Zelin Biomass Recycling Industrial Park Co., Ltd.

Quotation amount (10,000 yuan): 404000. 00

Second place: Jiangsu Zhong Zhao Engineering Consulting Co., Ltd.

Quotation amount (ten thousand yuan): 358500.00

Third place: Jingsheng Project Management Co., Ltd.

Quotation amount (ten thousand yuan): 309800.00


Project name: start-up area XACR-2025 -Announcement of

Successful Candidates for General Construction Contracting of Parcel 008 Construction Location: The project is located in the start-up area

of Xiongan New District Construction scale: The total land area is 147,400 square meters, and the total construction area is about 328,700 square meters, of which the above-ground construction area is about 217,400 square meters. It mainly constructs residential buildings, kindergartens, public service supporting facilities, supporting businesses, bus transfer centers and other supporting facilities, with an underground building area of about 111,300 square meters, and mainly constructs civil air defense, parking spaces, equipment rooms, etc; The total land area of supporting green space construction is 18364.6 square meters. The land area for supporting construction roads is 20085.

The main contents and scale of the general contracting bidding for this construction are as follows:

The main construction contents and scale of E02-06-05 and E02-06-07 plots: The total construction area is about 135,000 square meters, and the above-ground construction area is about 87,800 square meters. Underground building area is about 4. The main construction contents include residential, commercial, underground garage, civil air defense engineering and equipment room, synchronous construction of public service supporting, municipal roads (including municipal pipelines) and other projects; Main construction content and scale of

plots E02-06-09 and E02-06-14: The total construction area is about 193,700 square meters, the above-ground construction area is about 129,600 square meters, and the underground construction area is about 6. The main construction content includes residential, commercial, underground garage, civil air defense engineering and equipment rooms. Synchronize the construction of public service supporting projects.

Project investment type: enterprise investment project.

Bidding scope:

Bid Section I: The bidding scope is the general contracting of the construction of plots E02-06-05 and E02-06-07 of the XACR-2025-008 land parcel project in the start-up area. Including but not limited to foundation and foundation, main structure, curtain wall engineering, building decoration (including fine decoration), building roof, building water supply and drainage and heating, building fire protection, building electricity, intelligent building, ventilation and air conditioning, building energy conservation, small municipal, elevator, floodlighting, high and low voltage power transformation and distribution engineering, civil air defense and ancillary facilities. All the contents within the scope of the drawings, such as signs (including local nameplates), traffic safety projects, supporting projects and municipal road projects (including municipal pipelines), meet the requirements of the special acceptance standards for green buildings and barrier-free facilities, excluding landscape greening projects, reserved points for municipal heating and heat exchange stations in the plots. The details shall be subject to the bidding documents, drawings and bill of quantities.

Bid Section II: The scope of this tender is the general contracting of the construction of plots E02-06-09 and E02-06-14 of the XACR-2025-008 plot project in the start-up area. Including but not limited to foundation and foundation, main structure, curtain wall engineering, building decoration (including fine decoration), building roof, building water supply and drainage and heating, building fire protection, building electricity, intelligent building, ventilation and air conditioning, building energy conservation, small municipal, elevator, floodlighting, high and low voltage power transformation and distribution engineering, civil air defense and ancillary facilities. All contents within the scope of drawings such as signs (including local nameplates), traffic safety works and supporting works shall meet the requirements of special acceptance specifications for green buildings and barrier-free facilities, excluding all heating pipe networks and equipment and facilities within one meter from the reserved points of landscape greening works and municipal heating to the heat exchange station in the plot. The specific contents shall be subject to the tender documents, drawings and bill of quantities. Division of

bid sections: this project is divided into two bid sections:

bid section 1: the plot numbers are E02-06-05 and E02-06-07, and the estimated contract price is about 795 million yuan;

Bid Section II: Plot No. E02-06-09 and E02-06-14, and the estimated contract price is about 10.

Planned construction period: The planned construction period is 730 calendar days. It is planned to commence on November 16, 2025 and complete on November 16, 2027.

Bid winning information:

First place: Hebei Construction Engineering Group Co., Ltd.

Hebei Construction Engineering Xiongan Construction Development Co., Ltd.

Quotation amount (RMB): 696,838, 498.16

Second place: MCCCE Xiongan Construction Development Co.,

Ltd. MCCCE Group Co., Ltd.

Quotation amount (RMB): 696,733, 110.38

Third place: China Railway 12th Bureau Group Co., Ltd.

China Railway 12th Bureau Group Xiongan Construction Co., Ltd.

Quotation amount (RMB): 696,950, 840.98

Bid Section II

1st place: China Xinxing Construction Engineering Co., Ltd

. MCC5 Xiongan Construction Co., Ltd.

Bid price (RMB 10,000): 93238. 904286

2nd place: Zhong MCC Construction Engineering Group Xiongan Construction Development Co., Ltd

. MCC Construction Engineering Group Co., Ltd.

Quotation amount (ten thousand yuan): 93142. 254593

No.3: China Railway Construction Group Co., Ltd.

China Railway Construction Group Xiongan Development Co., Ltd. 0H TML0 6850050 0 Quotation amount (ten thousand yuan): 93345. UNK2 HTML0 UNK2 1 Project name: Lintan County 300MW Distributed Photovoltaic Corridor Project (PC) General Contracting Public Notice of Successful Candidates 0 HTML0 UNK2 2 Construction unit: Longnan Guoyuan Energy Investment Co., Ltd. 0 HTML0 UNK2 3 Construction site The primary site of the project is located in Xincheng Town, Liushun Town, Yangsha Township, Guzhan Town, Changchuan Township, Yangyong Town, Shubu Township, Wangqi Town, Taobin Town, Zhuoluo Township, Chengguan Town, Sancha Township, Shimen Township, Dianzi Town and other villages and towns under the jurisdiction of Lintan County 0HTML0UNK2 4 Construction Scale: It is planned to invest in the construction of 300MW distributed corridor photovoltaic. The overhead part is implemented on both sides of the rural road, the overhead length of the road occupied by each megawatt is about 1500 meters, and the ground clearance is 4. A total of 700 Wp monocrystalline high-efficiency components of 428572 blocks are installed, and the installed capacity of the DC side is 300 MWp; 0 HTML0 Division of bid section of 285714 5: this project is divided into two bid sections (of which: the first bid section is 100MWp, with a total of 700 Wp monocrystalline high-efficiency components of 142858 blocks installed; the second bid section is 200MWp, with a total of 700 Wp monocrystalline high-efficiency components of UNK2 blocks installed). 0 HTML0 UNK2 6 Planned construction period: planned commencement date: before February 15, 2026; planned completion date: before September 30, 2026. 0HTML0 017030 7 Bid winning information: 0HTML0 UNK2 8 First bid section 0HTML0 UNK2 9 First place: Gansu First Construction Group Co., Ltd. 0 HTML0 UNK3 0 Quotation amount (ten thousand yuan): 27693. UNK2 HTML0 UNK3 1 Second place: Guizhou Construction Engineering Group Third Construction Engineering Co., Ltd. Ren Company 0 HTML0 UNK3 2 Quotation amount (ten thousand yuan): 27500.The third place in the 05716

: Zhongshang Jiantou Construction Co., Ltd.

Quotation amount (10,000 yuan): 27950. The first place in the second bid section

of the 07148

: China Construction Fifth Engineering Bureau Co., Ltd.

Quotation amount (10,000 yuan): 55 380. 009732

No.2: Taiyuan Installation Engineering Group Co., Ltd.

Quotation amount (10,000 yuan): 55747. 99988

No.3: Pengsheng Construction Group Co., Ltd.

Quotation amount (10,000 yuan): 55210. Construction content package It includes residential buildings, supporting garages, supporting businesses, supporting service rooms and green spaces. It covers an area of about 163 mu, with a total building area of about 265000 square meters, of which the underground building area is about 67000 square meters. The above-ground construction area is about 19.

Estimated contract price: 900 million yuan

Planned construction period: 730 calendar days

Bid winning information:

Bid winning company: Anhui Shuian Construction Group Co., Ltd.

Anhui Jianzhu University Design Central Research Institute Co., Ltd. (Consortium)

Bid amount: RMB


750483712.00 Project name: Infrastructure Construction Project of Emerging Manufacturing Park in Bazhong Economic Development Zone, Construction Project of Intelligent Manufacturing Industrial Park in Bazhong Economic Development Zone (Phase I), Bazhong Economic and Technological Development Zone Intelligent Manufacturing Industrial Park Construction Project (Phase II) (one bid section for general contracting of design and construction) Announcement

of Bid Determination Results Construction site: Bazhong Economic and Technological Development Zone

Project investment amount and scale: The estimated total investment of the project is 88033.

Project scale: The total land for the project The 78830 is.96 ㎡; the total construction area is 118565.88 ㎡, of which the above-ground standard workshop area is 116540. The construction scale of Bazhong Intelligent Manufacturing Industrial Park (Phase I) Project: The total planned land area of the proposed Bazhong Intelligent Manufacturing Industrial Park (Phase I) Project is 120.88 mu; The total construction area is about 126,600 square meters, of which the factory building is about 124,800 square meters and the auxiliary production room is about 0. Bazhong Economic Development Zone Intelligent Manufacturing Industrial Park Construction Project (Phase II) Project Scale: This project plans to build Bazhong Intelligent Manufacturing Industrial Park (Phase II), with a total planned land area of 55.87 mu; The total building area is about 51,100 square meters, including about 40,800 square meters of factory buildings and dormitory buildings. 1.

Planned construction period: the total construction period is 730 calendar days (design and construction), including 60 calendar days of design and 670 calendar days of construction.

Bidding scope: complete the design and construction of the project (including procurement); design (including construction drawing design, cooperation in the whole process of construction drawing review and cooperation services in the construction stage); Construction (including the preparation work in the construction stage (three supplies and one leveling, temporary water and electricity) to the completion acceptance and overall handover, defect repair and warranty within the project warranty period, procurement of relevant equipment and materials and other follow-up services).

Bid winning information:

First place: Sichuan Jingxiong Construction Engineering Co., Ltd.

Sichuan Huacheng Huiyu Architectural Design Co., Ltd.

Bid price (RMB): 710322719. The specific construction contents include ecological dredging, Revetment construction and green road construction. The total length of the river course to be harnessed is 282.37 kilometers, and the total amount of dredging is 14.4912 million cubic meters, of which the current amount of siltation is 10.5647 million cubic meters, and the long-term 20-year predicted amount of siltation is 392. At the same time, the total length of the new revetment is about 53.24 kilometers. The total length of the construction road is about 9.

Bidding scope: general contracting of engineering survey, surveying and mapping, design, procurement and construction works, that is, to complete the survey, surveying and mapping, preliminary design (including budget estimate preparation), construction drawing design (including construction drawing budget, construction period services) and construction and procurement of corresponding construction and installation works of the project.

Bidding control price: 593814500.00 RMB yuan (including: engineering construction cost 16823 of the 3-year construction period RMB 0.16 million yuan, investigation cost (including surveying and mapping) RMB 9.3135 million yuan, design cost RMB 10.1234 million yuan, water and soil conservation engineering RMB 1.6823 million yuan, 1.3459 million yuan for environmental protection project, 20.5518 million yuan for basic reserve fund; dredging service fee for 17 years of operation period: 38256.

Bidding content: This project mainly focuses on 17 rivers such as Fengliang River, Baixi River and Longxi River in Fengshun County, and systematically implements the water ecological environment control project. The specific construction contents include ecological dredging, revetment construction and green road construction. The total length of the river course to be harnessed is 282.37 kilometers, and the total amount of dredging is 14.4912 million cubic meters, of which the current siltation is 10.5647 million cubic meters, and the long-term 20-year predicted siltation is 392. At the same time, the total length of the new revetment is about 53.24 kilometers, and the total length of the construction road is about 9.

Construction period: 3 years. Operation period: 17 years.

Maximum bidding price: RMB

593814500.00 Bid winning information:

Bid winning company: Meizhou Municipal Construction Group Co., Ltd.

Meizhou Water Conservancy and Hydropower Survey and Design Institute Co., Ltd.

Zhongyu Design Co., Ltd. 0HT ML0UNK7 Bid amount: RMB 588.0245 million 0 HTML 0 UNK8 Project name: 210 National Highway Urban Renewal Commercial Complex Project (Phase II of Sanxing Shantytown Reconstruction) EPC Bid Candidate Announcement 0 HTML 0 UNK9 Construction location: Chengguan Town, Ningshan County 0 HTML 0 UNK1 0 Project scale: The project includes Sifangdong area and The Bailuwan Resettlement Area is planned to have a total land area of about 56803.66 square meters (85.21 mu) and a total building area of about 274922.26 square meters (about 204616.83 square meters above ground and about 70305 underground), of which the total planned land area of the Sifangdong area is about 9650.75 square meters (14.48 mu). The total construction area is about 20957 square meters; The total planned land area of Bailuwan Resettlement Area is about 47152. 91 square meters (70.73 mu). Total construction area is about 253965.0 HTML0 253965 1 Planned construction period: 1825 calendar days 0 HTML0 UNK1 2 Bidding scope: Bid section 1: EPC of 210 National Highway Urban Renewal Commercial Complex Project (Phase II of Sanxing Shantytown Reconstruction), in accordance with relevant national norms, standards and relevant provisions of the project location. Design, procurement, construction, acceptance and subsequent handover required to make the bidding project meet the completion acceptance standards and meet the functional requirements for normal use. 0 HTML0 UNK1 3 Bid winning information: 0 HTML0 UNK1 4 No.1: Shaanxi Construction Engineering 12th Construction Group Co., Ltd. 0 HTML0 UNK1 5 No.2: Kunpeng Construction Group Co., Ltd. 0 HTML0 UNK1 6 No.3: Henan Dacheng Construction Engineering Co., Ltd. 0 HTML0 UNK1 7 Project name: Tongxing, Beibei District Reconstruction Project of Class D Dangerous Houses in Laojie Area (Construction + Operation) 0 HTML0 UNK1 8 Construction Location: 0 HTML0 UNK1, Beibei District, Chongqing 9 Construction Scale: (I) Reconstruction of about 8277 ㎡ of supporting roads in the residential area. As well as gas pipeline 2500 m, drainage pipeline 5000 m, water supply network 2500 m, greening 16500, 315 sets of fire fighting facilities, 410 sets of security equipment and other infrastructure, improve community comprehensive service facilities 300 m2, 13 cultural facilities, 5 sets of sports facilities, 32 aging facilities and other public service facilities; 0 HTML0 UNK2 0 (II) Reconstruction of about 2692 m2 of roads outside the residential area connecting with the main urban network, as well as 250 m of communication pipelines, 250 m of power supply pipelines and other urban infrastructure facilities; 0 HTML0 UNK2 1 (III) Reconstruction of about 5391 m2 of Class D old and dangerous housing owned by the government and recognized by professional institutions. 0 HTML0 11730 2 Total investment amount of this bidding project: 14626 290 thousand yuan 0 HTML0 UNK2 3 Estimated contract amount of this bidding project: UNK2. See the construction drawings and bill of quantities for the specific scope. If the construction drawings and bill of quantities are inconsistent, the bill of quantities shall prevail. HTML0 UNK2 4 Operation part: responsible for business planning, investment invitation, formulation of relevant operation schemes, and independent operation of the project. Including but not limited to the operation of commercial facades, some housing and other assets within the scope of the project, the maintenance and cleaning of municipal environment, municipal greening, maintenance of facilities and equipment within the scope of the project, etc., to carry out production and operation activities in accordance with the law and regulations, to promote the upgrading of industrial development in the project area, and to promote local employment and sustained and stable income growth of the surrounding people. 0 HTML0 UNK2 5 Defect liability period: 24 months; operation period: 120 months (calculated from the date of project completion acceptance).

Bid winning information:

First place: Chongqing Jinshan Property Management Co., Ltd. (Lead unit)

China Railway 14th Bureau Group Co., Ltd. (Member unit of the consortium)

Second place: Guangxi Huaye Construction Engineering Co., Ltd

. Third place: China Railway 10 First Bureau Group Co., Ltd. (Lead unit)

China Railway 11th Bureau Group Urban Rail Engineering Co., Ltd. (Member unit of the consortium)

Project name: G65 Baomao Expressway from Dazhou to Shaanxi, Dazhou-Chongqing Section and G76 Xiamen-Chengdu Expressway Longchang-Guizhou Chishui Section Expressway Safety and Toughness Improvement Project RXTS1 Bid Section Bid Announcement

Project Overview:

G65 Baomao Expressway: The route starts from Daba Mountain Tunnel at the boundary of Sichuan and Shaanxi (stake number is K1190 + 800). It ends at Chengbei Town, Linshui County (stake No.: K1457 + 814), with a route length of 266. The Shaanxi-Dazhou section is 139.318 kilometers long, and the Dazhou-Chongqing section is 127 kilometers long. The construction of this safety and toughness improvement project mainly includes the improvement of subgrade, pavement, bridges, tunnels, traffic safety facilities and mechanical and electrical engineering toughness of the two sections. Longchang-Chishui Section

of G76 Xiamen-Chengdu Expressway: The route starts from Baituling (stake No.: K1723 + 932) in Chishui River Valley at the junction of Guizhou and Sichuan Provinces and ends at Longchang Interchange of Chengdu-Chongqing Expressway (stake No.: K1932 + 238), with a length of 208. The section from Longchang to Naxi is 73.506 kilometers long (K1858 + 732-K1894 + 000 is planned to be an expansion and upgrading section with a route length of 35.268 kilometers, which is not included in the safety and toughness upgrading project). The section from Naxi to Chishui in Guizhou is long 134. The construction contents of this safety and toughness improvement project mainly include the skid resistance of pavement, subgrade protection and drainage capacity, scour resistance and bearing capacity of bridge, bearing capacity and water inrush resistance of tunnel, traffic safety facilities and mechanical and electrical engineering toughness improvement.

Technical standard: G65 Baotou-Maoming Expressway, G76 Xiamen-Chengdu Expressway Longchang-Guizhou Chishui Section: The project maintains the technical standard, subgrade width and design speed of the existing two-way four-lane expressway unchanged (design speed: 80km/H; Subgrade width: 24.

Bidding scope: This bidding is for the construction of safety and toughness improvement projects such as route, subgrade and pavement, bridges, tunnels, traffic safety facilities and mechanical and electrical engineering within the scope of Dazhou-Shaanxi and Dazhou-Chongqing sections of G65 Baomao Expressway and Longchang-Chishui section of G76 Xiamen-Chengdu Expressway.

Note: The improvement of mechanical and electrical engineering toughness refers to the Technical Guidelines for Highway Slope Monitoring Pilot issued by the Ministry of Transport. Technical Specifications for Highway Bridge Structure Monitoring (JT/T1037-2022) and Technical Guidelines for Pilot Construction of Highway Bridge Group Structure Monitoring System (No.1, 2025) mainly focus on the construction of monitoring and early warning perception network for some subgrade slopes, bridges and tunnels. Division of

bid sections and construction period: This tender is divided into one bid section RXTS1, with a construction period of 24 months, a defect liability period of 24 months and a quality warranty period of 60 months. The specific division of bid sections, starting and ending pile numbers, main project contents and scale are shown in Schedule I of this announcement.

Bid winning information:

First place: Sichuan Communications Construction Group Co., Ltd.

Sichuan Shudao Maintenance Group Co., Ltd.

Sichuan Highway Information Technology Co., Ltd.

Quotation amount (RMB): 12266574400 HTML0 12333282420 9 Second place: Shandong Road & Bridge Group Co., Ltd. 0 HTML0 UNK2 0 Zhejiang Gaoxin Technology Co., Ltd. 0 HTML0 UNK2 1 Quotation amount (RMB): 12333282420 HTML0 UNK2 2 Third place: Guangxi Road & Bridge Engineering Group Co., Ltd. 0 HTML0 UNK2 3 Guangxi Jiaokeji Group Co., Ltd. 0 HTML0 UNK2 4 Quotation Amount (RMB): 12346635800HTML0 UNK2 5 Project Name: SG02 Bid Section of North Extension Line of Huanguan Road 0 HTML0 UNK2 6 Construction Scale: The whole line of North Extension Line of Huanguan Road is located in Qishi Town, running north-south. The project starts from the third section of the third phase of Huanguan Expressway under construction in the south (starting pile number K22 + 190) and ends at the south bank approach of Dongping Dongjiang Bridge (ending pile number K29 + 200), with a total length of about 7. The main line adopts the standard of first-class trunk highway in urbanized areas, with a design speed of 80km/H; The total length of the main line bridge is 5169. The auxiliary road under Qiqiao Road-Huguang Road Bridge adopts two-way four-lane, with a design speed of 40 km/H, and non-motorized lanes and sidewalks are set; the existing Dongping Avenue maintains the current two-way six-lane, with a design speed of 60 km/H.

Bidding content: pavement works, traffic safety facilities, environmental protection facilities, landscape greening, lighting and other related supporting works along the line within K22 + 190 ~ K29 + 200.

Bid winning information:

first place; Poly Changda Engineering Co., Ltd.

Quotation: 169,039,166 yuan

Second place: CCCC Second Highway Engineering Co., Ltd.

CCCC South China (Dongguan) Construction Development Co., Ltd

. Quotation: 168,860 yuan

Third place: China Railway Siju Group Co., Ltd.

Quotation: 169,232,

Project name: TJ-03 Section

of Bengbu Section of Huaiyuan-Fengtai Expressway Project location: Huaiyuan County, Bengbu City, Anhui

Province Tenderee: Anhui Huaifeng Expressway Co., Ltd.

Project overview: Bengbu Section of Huaiyuan-Fengtai Expressway The project route starts from the northwest side of Junwang Service Area of G3 Beijing-Taiwan Expressway in Chenji Town, Huaiyuan County, connects with the existing G3 Beijing-Taiwan Expressway, lays from north to south, passes through the west side of Bengbu Airport, crosses the North Feihe River on the west side of Feihe Town, then passes through the west side of Feinan Town and the east side of Heliu Town, crosses the Guohe River and the Qiuhe River, and continues to cross the Cihuai New River on the east side of Lanqiao Town and the west side of Bailianpo Town. It ends at Bengbu, Huangwei Village, Tangji Town, the boundary of Huainan City, and connects with the Huainan Section of Huaiyuan-Fengtai Expressway, with a total length of about 55.

Among them, the TJ-03 bid section is located in Feinan Town, Heliu Town and Lanqiao Town of Huaiyuan County, with a starting and ending chainage of K27 + 250.8--K39 + 100, with a length of about 11. The project includes subgrade. Implementation, completion and defect repair of bridge and other works. The length of the bridge is 4.308 km, the length of the facilities along the line is 3.305 km, and the length of the subgrade is 4. The bridge hubs are: Guohe River Bridge, Heliu Interchange, Lanqiao Interchange, and Qiuhe River Bridge.

(1) The central stake number of Guohe Bridge is K28 + 122. The bridge span is arranged on the left side: 9 * 25 + 20 + 25 + 20 + 12 * 25 + 24.7 + 25 + 24.7 + 2 * 60 + 80 + 149 + 80 + 25.3 + 25 + 25.3 + 25 + 2 * 30 + 25 + 10 * 25 + 20 +2*25+20+5*25; Right 9 * 25 + 20 + 25 + 20 + 12 * 25 + 25.3 + 25 + 25.3 + 2 * 60 + 80 + 149 + 80 + 24.7 + 25 + 24.

(2) The central pile number of the Qiuhe River Bridge is K33 + 950, and the bridge uses a 30m main span prestressed concrete composite box girder to cross the Qiuhe River. The bridge span is 75 * 30 m, and the total length of the bridge is 2,256 m (including the abutment).

(3) Heliu interchange is set at the intersection of the project and G329. The interchange adopts A-type single horn scheme, and the ramp underpasses the expressway; The design speed of the ramp is 40 km/H, the ramp A adopts the opposite separated two-lane with a width of 19.5 meters, and the other ramps adopt the single-lane section with a width of 10.

(4) The Lanqiao interchange is set at the intersection of the project and the planned S313, the interchange adopts the A-type single-horn scheme, and the ramp crosses the expressway; The design speed of the ramp is 40 km/H, the ramp adopts the opposite separated two-lane with a width of 19.5 meters, and the other ramps adopt the single-lane section. 10.

Bidding scope: implementation, completion and defect repair of temporary works, subgrade works, bridge works, crossing works and connecting line works within the scope of construction drawings and bill of quantities. The details shall be subject to the construction drawing and the bill of quantities.

Bid winning information:

First place: Anhui Construction Engineering Water Resources Development Investment Group Co., Ltd.

Bid price: 742200939.90 RMB

Second place: Anhui Construction Engineering Road and Bridge Construction Group Co., Ltd.

Quotation: 783651388.57 yuan

Third place: Anhui Construction Engineering Construction Investment Group Co., Ltd.

Bid quotation: 783847395.

Construction site: Huaiyuan County, Bengbu City, Anhui Province

Construction scale: Huaiyuan-Fengtai Expressway Road Bengbu section, the project route starts from the northwest side of Junwang Service Area of G3 Beijing-Taiwan Expressway in Chenji Town, Huaiyuan County, connects with the current G3 Beijing-Taiwan Expressway, lays from north to south, passes through the west side of Bengbu Airport, crosses the North Feihe River on the west side of Feihe Town, then crosses the Vortex River and the Euryale River on the west side of Feinan Town and the east side of Heliu Town, and continues to cross the Cihuai River on the east side of Lanqiao Town and the west side of Bailianpo It stops at the boundary of Bengbu and Huainan in Huangwei Village, Tangji Town, and connects with the Huainan section of Huaiyuan-Fengtai Expressway, with a total length of about 55.There are 6 super-large bridges and 11 bridges

along the whole line, including 7 interchanges such as King (hub), Bengbu Airport (hub), Bengbu Airport West (reserved construction conditions), Lunan (hub), Heliu, Lanqiao and Tangji. Three ramp toll stations, one service area, one maintenance area, one management sub-center and other necessary traffic engineering and facilities along the line will be constructed simultaneously. The whole line adopts the standard construction of two-way four-lane expressway, with a design speed of 120 km/H, a roadbed width of 27 meters, a bridge and culvert design vehicle load grade of highway-I, and an asphalt concrete pavement structure.

(1) The total service period of the General Supervision Office (HFB-ZJB) and the Resident Office (HFB-ZDB02) is 60 months (tentative 1800 calendar days) (including the construction preparation period, construction period, acceptance and defect liability period).

(2) The total service period of the resident office (HFB-ZDB01) is 54 months (tentative 1620 calendar days) (including the construction preparation period, construction period, acceptance and defect liability period).

Bidding scope: This project is subject to the establishment of a second-level supervision organization, including one chief supervision engineer office and two resident supervision engineer offices. The scope of this tender is the office of the chief supervision engineer and the office of the resident supervision engineer for the civil engineering construction of Bengbu section of Huaiyuan-Fengtai Expressway.

All can be viewed after purchase
Correlation

Bengbu Section of Huaiyuan-Fengtai Expressway, the project route starts from the northwest side of Junwang Service Area of G3 Beijing-Taiwan Expressway in Chenji Town, Huaiyuan County, connects with the current G3 Beijing-Taiwan Expressway, lays from north to south, passes through the west side of Bengbu Airport, crosses the North Feihe River on the west side of Feihe Town, and then crosses the Vortex River and the Euryale River on the west side of Fannan Town and the east side of Heliu Town. It continues southward through the east side of Lanqiao Town and the west side of Bailianpo Town, crosses the Cihuai New River, ends at the boundary of Bengbu and Huainan in Huangwei Village, Tangji Town, and connects with the Huainan section of Huaiyuan-Fengtai Expressway, with a total length of about 55.48 km.

2026-01-29 11:46:01