CCCC Construction Wins Bidding for 300 Million Large Orders in Hubei

2026-04-15 16:58:59

The total land area of the project is about 400 mu (266668 ㎡). It is planned to build a high-standard greenhouse vegetable planting demonstration base, a new intelligent multi-span glass greenhouse 180000, a seedling cultivation center of 4000 ㎡, a sorting and processing center of 4400 ㎡, a storage of agricultural materials of 5000 ㎡, and a water and fertilizer center of 1200 ㎡; Supporting construction of irrigation, drainage, intelligent systems and other related ancillary facilities.

EPC of Intelligent Agriculture Construction Project in Xiangzhou District

, Xiangyang City

Construction site: Liangzui Village, Shuanggou Town, Xiangzhou District, Xiangyang City

Construction scale: The total land area of the project is about 400 mu (266668 ㎡), and it is planned to build a high-standard greenhouse vegetable planting demonstration base. Newly build 180000 of intelligent multi-span glass greenhouse, 4000 ㎡ of seedling cultivation center, 4400 ㎡ of sorting and processing center, 5000 ㎡ of agricultural materials storage, 1200 ㎡ of water and fertilizer center, and auxiliary facilities such as irrigation, drainage and intelligent system.

Bid winning information:

First place:

Rong Haichuan Urban and Rural Planning and Design Co., Ltd.

, Water Conservancy and Hydropower Construction Department, Xiangzhou District, Xiangyang City, China Communications Construction Group Co.

, Ltd. Bid price (RMB): 307023902.000 HT ML0UNK8 Second place: CRCC Harbour & Channel Engineering Bureau Group Co., Ltd. 0HTML0UNK9 Hubei Urban Construction Design Institute Co., Ltd. 0HTML0308542742.640 0Bid price (RMB): 308542742.640 HTML0308542742.640 1Third place: Huazi Pentium Construction Engineering Group Co., Ltd. 0HTML0308542742.640 2Shanghai New Construction Design Co., Ltd. 0 HTML0 308470600.000 3 Bid Price (RMB): 308470600.000 HTML0 308470600.000 4

All can be viewed after purchase
Correlation

Hubei Communications Investment Group Co., Ltd. participated in the selection and bidding of investors and cooperative units for Enshi Grand Canyon Branch Expressway Project of Shanghai-Chongqing Expressway

2026-05-11 09:24:02

The group A3 and B1 buildings (the first batch) of the student dormitory construction project of Shandong University Longshan Campus (Innovation Port) are located in the Shengjing plot on the west side of Xiuyuan River, Zhangqiu District, Jinan City, west of Provincial Highway 241, east of Shengjing New Town, north of Jingshi East Road and south of Century Avenue. The project is invested and constructed by Shandong Jianxue Construction Investment Co., Ltd., which adopts EPC general contracting mode, including the whole process of design (including all kinds of construction drawing design), procurement, construction, commissioning, acceptance, warranty and formalities of A3 and B1 group buildings (the first batch), demonstrating its strong undertaking ability and market competitiveness in the field of education infrastructure.

2026-05-11 09:23:38

The accelerated construction of Minjiang Dongfengyan Navigation and Power Hub will open 162 kilometers of water "high-speed" from Chengdu Plain to the Yangtze River Golden Waterway, significantly reduce the cost of Sichuan cargo logistics, and help Sichuan shipping revitalize.

2026-05-09 12:33:12

On May 7, the fifth and seventh bid sections of the 1.6 million kilowatt photovoltaic power generation project in Tuoli County, Shangdian Power, Tacheng, Xinjiang, respectively issued instructions for bid rejection. The two bid sections were rejected because the winning bidders, China Railway 24 Bureau Group Zhejiang Engineering Co., Ltd. and China Communications (Tianjin) Technology Testing Co., Ltd., refused to sign the contract in violation of the regulations and cancelled their qualifications for winning the bid.

2026-05-08 11:46:58

The Project involves 11 prefectures and cities, with a total mileage of 588.922 km, including 132.429 km of Class I highway, 385.597 km of Class II highway, 45.621 km of Class III highway, 25.275 km of Class IV highway, 271.051 km of functional rehabilitation, and 317.871 km of structural rehabilitation.

2026-05-08 09:55:52

Guangzhou Liwan Kengkou Village Urban Village Reconstruction Project K13 Resettlement Housing Construction Project is located in Plot K13 of Kengkou Village Urban Village Reconstruction Project, Chongkou Street, Liwan District, Guangzhou, with a planned land area of 23558 ㎡, a total building area of 242330.7 ㎡ (subject to the actual construction application), a plot ratio of 6.9, and a building height limit of 120-150m. The total capacity area is 161374 ㎡, including residential 129071 ㎡, commercial building 26803 ㎡, public service and municipal facility building 5500 ㎡. Excluding capacity area: 80956.7 ㎡.

2026-05-06 11:47:31

The total planned land area of this project is 28443.161 ㎡ (42.663 mu), the total building area is 167201.83 ㎡, and the underground 49392 is.44 ㎡. The newly-built buildings include: library, cultural center, Wenchuang service building (138.95m high); Wenchuang office, supporting service room and underground garage. Construction site: east of East 2nd Ring Road, Yuhua District, Shijiazhuang City, Hebei Province, and south of Tanan Road.

2026-05-06 09:45:11

Construction overview of existing projects: The section from Wuhan West to Yichang of Shanghai-Chongqing Expressway starts from Wuhan West Hub, passes through Caidian District of Wuhan City, Hanchuan City, Xiantao City and Qianjiang City of Xiaogan City, Jingzhou District and Shashi District of Jingzhou City, Zhijiang City, Yiling District, Wujiagang District and Xiaoting District of Yichang City, and ends at Gaojiadian Hub Interchange of Wujiagang District of Yichang City (intersection of Shanghai-Chongqing Expressway and Ya Expressway). The mileage is about 265.7 kilometers, and the total mileage is about 271 kilometers after Gaojiadian Hub Interchange is connected to Yichang Toll Station. The highway is a two-way four-lane, fully enclosed expressway with cement concrete pavement.

2026-05-06 09:42:41

The project starts from K0 + 000 and ends at K32 + 960, with an average altitude of 3200m. The main control points along the line are/; The total length of the main line is 33.127 km (including 2 long chains totaling 167.083 m) (branch line length/km). It is constructed according to the standard of expressways with a design speed of 80 km/H. The subgrade width is 26 m, the pavement width is/m, and the design load of bridges and culverts is Grade I highway. The public bidding for the pavement, traffic safety, prefabrication, tunnel, greening, electromechanical and housing construction of K0 + 000 ~ K32 + 960 (stake number range) of the project is now carried out.

2026-05-06 09:39:08

Refer to the red line map of the construction land planning for the land use location of the reconstruction plot 13 of the urban village reconstruction project in Hengyuan and Kezhuang Districts, Nangang Community, Nangang Street, Huangpu District, Guangzhou. The land is Class II residential land compatible with commercial land compatible with commercial land (R2/B1/B2), with a land area of 60019. 00 square meters, a total building area of about 273395. 00 square meters, a tentative total building area of about 421221. 82 square meters, and a basement area of about 135261. 61 square meters. Building height: The maximum height is 119.90m.

2026-04-30 16:51:17

Mingshui-Beian Section of G1211 Jihei Expressway starts from the southeast side of Xinfa No.4 Team in the north of Mingshui County, connects with the proposed Harbin-Mingshui Section of Jihei Expressway, ends at Jianhua Hub Interchange in Bei'an City, and connects with the Beian-Heihe (Port) Section of Jihei Expressway, with a total length of 142.608 km and a construction mileage of 120.528 km. The whole line is provided with 7 large bridges, 8 medium bridges, 11 small bridges, 67 culverts, 4 interchanges, 14 separated overpasses over the main line, 14 separated overpasses under the main line, 25 access bridges, 28 overpasses, 2 pedestrian overpasses, 20 access culverts and 2 service areas.

2026-04-30 16:48:22

Located in Dianbai District, Maoming City, Guangdong Province, this project is an ordinary highway project with a total length of about 18.914 kilometers, starting from the intersection of Fushanling Avenue (proposed) and ending at the intersection of the South Extension Line of the Western Express Line (proposed), crossing Danchang Town, Shuidong Town, Qijing Town and Xiaoliang Town along the line, covering an area of about 1,213,150 square meters. The subgrade is 33m wide, with two-way 6 lanes, design speed of 80km/H, and asphalt concrete pavement; the total length of bridges along the line is 6,389.1m, with 19 bridges, including 2 super-large bridges (4,110.8m in total).

2026-04-28 10:09:37

The G219 Yunnan-Napo Pingmeng Highway starts from Waideng Bridge at the junction of the existing National Highway 219 between Yunnan Province and Guangxi and ends at the junction of Napo County and Jingxi City, with a total length of 112.474 km, a design speed of 40 km/H, a roadbed width of 8.5 meters and a pavement width of 7.5 meters. The whole line is constructed according to the standard of two-way two-lane second-class highway.

2026-04-27 14:48:49

The total land area of the project is 60521.42 ㎡, and the total building area is 63664.93 ㎡. It is planned to build a logistics warehouse, a sorting center, an ancillary building, a guard room, and supporting public works such as parking lot, water supply and drainage, power supply and transformation, fire fighting system, intelligent park, photovoltaic procurement, etc. Of which, the building area of 2 # logistics warehouse is 31397. 85 ㎡, the building area of 3 # auxiliary room is 8861.86 ㎡, the building area of 4 # sorting center is 23344. 23 ㎡, the building area of 5 # guard room is 60.99 ㎡, and the total storage capacity

2026-04-17 11:29:57

The total amount is 527 million yuan, and the lowest unit price is 2.00 yuan/W! Bid Winning Results of 100MW Household Distributed Photovoltaic Power Generation EPC Project in Bayannur City, Inner Mongolia | Weekly Project Statistics (3.30-4.5)

2026-04-15 17:55:03

The total land area of the project is about 400 mu (266668 ㎡). It is planned to build a high-standard greenhouse vegetable planting demonstration base, a new intelligent multi-span glass greenhouse 180000, a seedling cultivation center of 4000 ㎡, a sorting and processing center of 4400 ㎡, a storage of agricultural materials of 5000 ㎡, and a water and fertilizer center of 1200 ㎡; Supporting construction of irrigation, drainage, intelligent systems and other related ancillary facilities.

2026-04-15 16:58:59

Project overview: Starting and ending points: The starting point of the route (K0 + 000) is located near Shahukou Village, Youwei Town, Youyu County. It will be reconstructed and expanded southward along the existing National Highway 241, and a new line will be opened eastward on the north side of Youwei Town. Then it will continue to be reconstructed and expanded along the existing National Highway 241, and a new line will be opened westward to Youyu County Town. In Xucun Village of Weiyuan Town, the existing National Highway 109 is used for reconstruction and expansion for 5.35 kilometers, and then the reconstruction and expansion is continued southward along the existing National Highway 241, and the terminal point (K75 + 146.511) is located near the boundary of Youyushanyin County. The total length of the line is 75.227 km, of which the new section is 24.676 km long.

2026-04-14 15:36:44

General contracting of Jijia Depot of Jinan Rail Transit Line 9 Phase I Project, including but not limited to the construction and warranty of all contents within the scope of construction project drawings and bill of quantities. See the bidding documents for details. The project is divided into two bid sections, and the bid is not successful. The first bid section is the entrance and exit line project of Jijia depot, with an estimated contract price of 65 million yuan; the second bid section is other projects of Jijia depot, with an estimated contract price of 700 million yuan.

2026-04-13 13:10:35

The new construction of Poyang-Wannian Expressway is located in Wannian County and Poyang County of Shangrao City and Leping City of Jingdezhen City, Jiangxi Province. The route starts from Wanwan Expressway, intersects with Hangzhou-Changzhou Expressway, and ends at the planned Pengdong Expressway, with a total length of 40.126 km. The project adopts the standard construction of two-way four-lane expressway, with a design speed of 100km/H and a subgrade width of 26.0m. There are 18 bridges with a total length of about 19638 m and 2 tunnels with a total length of 775 m, and the ratio of bridge to tunnel is 50. 87%. Six interchanges, three toll stations, one service area, one maintenance area and related traffic are set up synchronously.

2026-04-02 11:14:39

G95 Capital Area Ring Expressway (Tangcheng Expressway to Tianjin-Hebei Boundary Section) starts from Nanjing-Hebei Hub Interchange of Tangcheng Expressway, connects with Tanglang Expressway Phase I Project, and ends at Tianjin-Hebei Boundary on the west side of Dongmaquan Town, Wuqing District. The whole line is routed from east to west, passing through Ninghe District, Baodi District and Wuqing District. The total length of the line is about 76.638 km. There are 11 interchanges along the line, including 1 continued hub interchange, 3 new hub interchanges, 7 new general toll interchanges, 5 super-large bridges, 5 large bridges and 10 medium and small bridges. There are 2 service areas, 2 maintenance work areas and 1 monitoring and communication sub-center. Set

2026-03-31 11:09:27

The new Wuhan hub through line project is drawn from Yunmeng East Station of Hanshi high-speed rail, with Xiaogan South Station and Hanyang Station, crossing the Yangtze River along the Third Ring Road of Wuhan City, with Baishazhou Highway and Railway Yangtze River Bridge, and connecting Wuhuang Intercity after crossing the river. The newly-built main line is 72.193 km long (the length from the junction point of Yunmeng East to the dividing point at the north end of the same line with Wuyi is 40.149 km; the length from Zoumaling Line Station (excluded) to Huangjiahu Line is 32.044 km long), and the connecting line is 8.605 km long. Among them, the main bridge of the newly-built Baishazhou Rail-cum-Road Yangtze River Bridge is 2623 meters long, and the first-and second-line railways, upper highways and synchronous construction of the rail-cum-road joint construction section on both sides of the river

2026-03-26 16:46:22

Beijing Jiaotong University Xiongan Campus Phase I Group III Housing Construction Section IV General Contracting Project is located in Xiongan New District, Hebei Province, with the tender number of E1300000972c00698z01. The project is an important part of the construction of Xiongan Campus, which was won by China Railway Second Bureau Group Co., Ltd. to undertake all the housing construction tasks of the tender section.

2026-03-26 16:46:16

EPC General Contracting of Supporting Wharf Works of Zhangjiagang Haijinjiang LNG Terminal Project (Suzhou LNG Reserve Center) in Dongsha Operation Area of Zhangjiagang Port Area of Suzhou Port

2026-03-20 09:35:40

The project starts from the east of Linyu Bridge in the west, connects with the existing Science and Technology Avenue (Linan Section), and ends at the 6 # shield well in the north of Nanhu embankment in the east, with a total length of about 5 kilometers. The project is divided into two parts: the expressway system and the ground auxiliary road system. The expressway system is heavy. The underground expressway is about 1.77 km long, the ground expressway is about 3.25 km long, and the ground auxiliary road is about 3.76 km long. The main construction contents include road engineering, tunnel engineering, bridge engineering, pipeline engineering, tunnel electromechanical engineering and ancillary engineering.

2026-03-18 11:26:28

Recently, eight major construction central enterprises have announced the data of new contracts signed in 2025. The total value of new contracts signed by the eight enterprises amounted to approximately RMB0.98 billion 165567, and the value of new contracts signed by CSCEC amounted to RMB0.00 billion 45458, ranking first in the total amount; the value of new contracts signed by ChemChina increased by 10.0% year-on-year, ranking first in the growth rate; among the eight central construction enterprises, only the value of new contracts signed by MCC decreased by 10.8% year-on-year.

2026-03-16 14:12:31

The total length of the recommended line is 164.894 km, and the 46762 of bridges is.2m/111 (including 11 super-large bridges with 14707 of.5m, 80 large bridges with 30507 of.8 m, and 20 medium bridges with 1546.9 m); 20 tunnels with a length of 38771m (4 extra-long tunnels with a 20897 of 0.5m, 9 long tunnels with a length of 13648m, 4 medium tunnels with a length of 3055.5m, and 3 short tunnels with a length of 1170m), and the ratio of bridge to tunnel is 51.87%; It is proposed to set up 13 interchanges (Hedong, Beichuanting Junction, Liannannan, Dadongshan Junction and Libu

2026-03-16 11:25:36

The urban village reconstruction project in Yingchunli Tiexinli District has been approved by Qinhuangdao Administrative Examination and Approval Bureau with the approval of the feasibility study report on the urban village reconstruction project in Yingchunli, Yingchunli District 2, Tiexinli District 1, Tiexinli District 2 and Tiexinli District 3 (Qin Examination and Approval Investment [2025] 04-0040 to 04-0044). The tenderer is Qinhuangdao Minda Real Estate Development Co., Ltd. The construction funds come from municipal financial investment and other investment, and the proportion of project investment is 100%.

2026-03-02 11:38:37

As recommended by China Railway Construction Corporation, the controlling shareholder of the Company, and as considered and approved by the nomination committee of the board of directors of the Company, Mr. Pei Minshan and Mr. Chen Zhiming were nominated as candidates for executive directors of the Company, with their terms of office commencing from the date of approval by the shareholders' meeting and being the same as those of the sixth session of the board of directors of the Company.

2026-03-02 09:19:17

Enterprise investigation APP shows that recently, CCCC Third Harbor Engineering Co., Ltd. Marine Engineering Technology Development (Zhoushan) Co., Ltd. was established with a registered capital of 260 million yuan. Its business scope includes metal structure sales, engineering management services, building materials sales, ship and port services, construction machinery and equipment leasing, etc.

2026-02-27 09:32:51

Section III of West Extension Project of Ganzhou Hakka Avenue (Sanjiang Section), Sanjiang Bridge Project of West Extension Project of Ganzhou Hakka Avenue (Sanjiang Section) and Expressway Project in Central District of Ganzhou-Section III of Chengxi Avenue (K7 + 135-K8 + 550)

2026-02-09 10:13:44

Fabrication, transportation and construction of 30 wind turbine foundations, anti-scouring facilities for 30 wind turbine foundations, installation of 30 sets of towers and wind turbines, temporary navigation mark project, marine pasture science and technology project, etc. Bid award principle: the two bid sections (Datang Hainan Danzhou 1200MW Offshore Wind Power Project Site II (600MW) Offshore Wind Turbine and Foundation Construction Bid Section I and Bid Section II) are tendered and constructed at the same time. The bidder can participate in the bidding of each bid section, but can only get the first successful candidate of one bid section at most.

2026-02-05 14:13:07

This project covers an area of about 589.41 mu, with a total construction area of about 384089. 70 ㎡, of which the 339118 of new standardized factory buildings is. 61 ㎡, the 44971 of production and service facilities is. 09 ㎡, and supporting construction of 1508 motor vehicle parking spaces and 1995 non-motor vehicle parking spaces. Auxiliary facilities such as internal roads, water supply and drainage pipe network, communication pipe network, gas pipe network and power supply, water supply and fire fighting facilities in the park will be constructed.

2026-02-05 14:12:59

Project scale: The total length of the project route is 62.368 kilometers, of which the starting point to Beiluoyin Interchange (30.407 kilometers) adopts the standard of two-way four-lane first-class highway, with a design speed of 80 kilometers per hour, an integral subgrade width of 22.5 meters and a separated subgrade width of 11.25 meters; North Luoyin Interchange ~ Baijing East Interchange (3.4km), sharing the same line with the new construction of Taiyuan Transit Section of National Highway 108, is a two-way six-lane first-class highway with a design speed of 80km/H and a subgrade width of 40m; Baijing East Interchange ~ Terminal (28.561km) is a two-way four-lane first-class highway with a design speed of 80km/H and a subgrade width of 40m.

2026-02-05 14:12:52

In Linjiang City, Jilin Province, the route starts at Fenshui (county boundary) on the north side of Liumaohe Forest Farm, Linjiang City, and ends at Century Street, Sentieqiaotou, Linjiang City.

2026-02-04 13:32:46

The construction site of Rongjiang to Rongan (boundary between Guizhou and Guangxi) Expressway Project is located in Congjiang County and Rongjiang County, Qiandongnan Prefecture, Guizhou Province. The scale of the project is clear and definite. The starting point of the route is near Dushi Village, Nanguzhou Town, Rongjiang County. Rongjiang South Hub Interchange is set to connect with the existing Xiamen-Chengdu Expressway. It passes through Guzhou Town of Rongjiang County, Tiandong Town of Congjiang County, Xiajiang Town, Bingmei Town, Xishan Town and Douli Town. It ends near Jiefangtun of Guizhou-Guangxi boundary and connects with the second phase of Rongan-Congjiang Expressway to be built in Guangxi.

2026-02-04 13:32:40

Project overview: The steel greenhouse project of Zhongmang Longgang Pollution-free Red Agricultural Base Intelligent Greenhouse Project has been approved by the project approval/approval/filing authority. The source of funds for the project is self-raised funds: the 117996 is 100000 yuan, and the tenderer is Zhongmang Construction Co., Ltd. This project has met the bidding conditions, and now the bidding method is public bidding.

2026-02-03 11:42:06

Bidding scope: subject to the bidding documents, construction drawings and bill of quantities (including preparation instructions) of the project, the general contracting of project construction shall be carried out, including the whole process of project related formalities, procurement, construction, commissioning, acceptance, handover and warranty.

2026-02-03 11:41:53

The construction scope of this project includes subgrade and pavement, bridge and culvert, tunnel, route crossing, traffic engineering, toll station, maintenance work area, tunnel management station, environmental protection and other sub-projects and ancillary works.

2026-01-30 11:13:51

The total construction area of the project is about 145.77 mu, the total building area is about 125,700 square meters, and the capacity building area is about 75,700 square meters. It mainly involves the construction of a stadium with a 31700 of square meters, a gymnasium with a 12000 of square meters, a swimming pool of 3500 square meters, a national fitness center of 9000 square meters, a sports school of 6000 square meters, an underground parking lot of 50000 square meters, a commercial supporting 13500 of square meters, outdoor sports venues and greening projects.

2026-01-30 11:13:46

Bengbu Section of Huaiyuan-Fengtai Expressway, the project route starts from the northwest side of Junwang Service Area of G3 Beijing-Taiwan Expressway in Chenji Town, Huaiyuan County, connects with the current G3 Beijing-Taiwan Expressway, lays from north to south, passes through the west side of Bengbu Airport, crosses the North Feihe River on the west side of Feihe Town, and then crosses the Vortex River and the Euryale River on the west side of Fannan Town and the east side of Heliu Town. It continues southward through the east side of Lanqiao Town and the west side of Bailianpo Town, crosses the Cihuai New River, ends at the boundary of Bengbu and Huainan in Huangwei Village, Tangji Town, and connects with the Huainan section of Huaiyuan-Fengtai Expressway, with a total length of about 55.48 km.

2026-01-29 11:46:01

Guantai Road Upgrading and Reconstruction Phase II (Keyuan Tunnel) Project starts about 300m north of the intersection of Wanlu Road and Guansui Road, crosses Wanlu Road, Xinlian Street and Huayuan Road southward along Guansui Road, sets parallel ramps on the southeast side of Wanlu Road Intersection to connect the ground road and the main line tunnel, and then adopts the whole immersed tube tunnel on the south side of the current Wanjiang Bridge. After crossing the river, two directional ramps will be set up to connect Dongjiang Avenue on the ground. The tunnel will be laid along Keyuan Road to the southeast, passing through Dongjiang Avenue, Kehu Street, Canal West 2nd Road, Canal East 2nd Road and Dongguan Canal. A pair of directional ramps will be set up on Canal West 2nd Road to connect Canal West 2nd Road. The main tunnel is located at

2026-01-29 11:45:51

The project is located in the 72-74 # berth and rear storage yard area on the north bank of Qianwan Port Area of Qingdao Port. It is planned to transform the existing 72-74 # general cargo wharf into a 150,000-ton multi-purpose wharf and construct corresponding supporting facilities. After reconstruction and expansion, the wharf shoreline is 534.36 meters long, and the designed annual throughput capacity of the wharf is 10.42 million tons (including 1.03 million standard containers). The front container yard is arranged in the rear jetty area of 72-74 # berth, and the container yard is arranged in the rear area of the west side. The construction contents mainly include wharf, intelligent yard, harbor basin water area, etc.

2026-01-27 11:19:00

It has been included in the project database of the Notice of the Ministry of Transport on Issuing Matters Relating to the Mid-term Adjustment of the 14th Five-Year Plan for Highway Development (Jiao Planning Fa [2023] 163), and is a key project for the mid-term adjustment of the 14th Five-Year Plan for Highway Development of the Ministry of Transport. The starting point of the project is located at the Sichuan-Guizhou provincial boundary of the original Jianrong-Zunyi Expressway. The expansion plan adopts the reconstruction and expansion mode. The expansion is implemented along the existing roads, passing through Chishui City, Wanglong Town, Tucheng Town, Longxing Town, Huilong Town, Hema Town and Daba Town, and ending at Canglong Hub of Renhuai City, connecting with Renhuai-Zunyi Expressway. The total length of the route is 136 kilometers, and the design speed is 100 kilometers per hour.

2026-01-26 13:14:39

On January 21, China Jiaotong Construction issued an announcement on the departure of senior managers of the company.

2026-01-22 11:32:56

This project is located in Dapeng Town, Tongshan District, Xuzhou City, Jiangsu Province. It starts from the Beijing-Taiwan Expressway on the west side of Xuzhou City and ends at the boundary between Jiangsu Province and Anhui Province, connecting the Anhui section of Xufu Expressway.

2026-01-22 11:13:41

The total planned land area of this project is about 2369 mu, and the constructable land area is about 1500 mu. Based on the difference between the north and south sides of the plot, it is proposed to divide the development into two functional parts. Among them, the north side of the South Ring Road is the core part of the construction, relying on the local Fuyang culture in Xiaoxian County, to build a distinctive Fuyang Cultural Park, to inherit and carry forward the local cultural characteristics, to synchronously promote infrastructure upgrading, supporting residential construction, characteristic commercial cultivation and park and river landscape upgrading, and to build a comprehensive functional area of "culture + life + ecology". The south side of the South Ring Road focuses on the renewal of the urban interface, focusing on the systematic upgrading and renovation of the building facades along Shengli Avenue.

2026-01-22 11:13:21

This bidding project, Xiangqiong Advanced Manufacturing Industry Co-construction Industrial Park and Port-vicinity Logistics Base Facilities Supporting Project (Basuogang Gaopai Port Area Phase I Project)-Wharf and Waterway Project Investor + Construction General Contracting Bidding is approved by Dongshen Zhengtou [2025] No.119. The tenderer (project owner) is Hainan Jiaotou Port and Shipping Investment and Construction Co., Ltd., and the construction funds come from finance. The proportion of project investment is 30.82% of state-owned funds and 69.18% of non-state-owned funds. The project has met the bidding conditions, and now the supporting facilities of Xiangqiong Advanced Manufacturing Industrial Park and Lingang Logistics Base (Basuogang Gaopai

2026-01-22 11:12:20

The project starts from the boundary between Hubei and Henan in Caodian Town, Suixian County, Suizhou City, Hubei Province, connects with the proposed G4222 Hexian-Xiangyang Expressway Henan Xinyang Section, passes through Yindian Town and Wanhe Town, ends at the boundary between Suizhou and Xiangyang in Wushan Town, Suixian County, Suizhou City, and connects with the synchronously constructed G4222 Hexian-Xiangyang Expressway Xiangyang Section.

2026-01-22 09:58:33

The infrastructure giants of central enterprises jointly won the bid for 44 major projects, highlighting the stable investment of the state, the strategic orientation of strengthening infrastructure and the core supporting role of leading enterprises.

2026-01-21 10:03:23

According to the feedback from the market, the price of cement in Northeast China has shown a weak downward trend recently.