Project Name: Connection Project (EPC)
from Daye Section of Daguang Expressway to Daye Lake National High-tech Zone Construction Location: Daye City
Construction Scale: The construction of this project includes route crossing, subgrade and pavement, bridges and culverts, traffic engineering and facilities along the line, landscape greening, other ancillary facilities, etc.
The Project adopts the EPC mode, including but not limited to engineering design (construction drawing design, etc.), procurement of goods and materials, construction and installation works within the design scope, completion acceptance and overall handover, warranty within the warranty period of the project, etc., according to the requirements of relevant specifications and the existing approval. And be fully responsible for the quality, safety and construction period of the contracted project.
Planned construction period: 365 calendar days. Planned commencement date: 2026-01-08
Bid winning information:
First place: CCCC Second Harbor Engineering Co., Ltd.
Beijing Jiaoke Highway Survey and Design Institute Co., Ltd.
Bid price: 166339581 RMB
Second place: CCCC First Highway Engineering Group Co., Ltd.
CCCC Second Harbor Consultants Co., Ltd.
Bid price: 164128555.00 RMB
Third place: CCCC Road & Bridge Construction Co., Ltd.
China Highway Engineering Consulting Group Co., Ltd. Company
Bid Price: 167933691
Name of Project: Reconstruction Project of Zhoubang-Shahu Interchange Highway in Xiantao City (K0 + 000.0 ~ K2 + 672.985, K3 + 550.877 ~ K7 + 961.401, K14 + 020 ~ K20 + 045.01)
Project scale: Total length of the project 13.
Construction site: Hubei Province-county-level administrative divisions directly under the jurisdiction of the province-Xiantao City
Bid winning information:
First place: Xiantao City Sida Highway Construction Co., Ltd.
Tender offer: 177866507.07.
Second place: Xianning Tianli Road and Bridge Co., Ltd.
Tender offer: 178957779.90 yuan
Third place: Hubei Hengchang Road and Bridge Co., Ltd
. Tender offer: 179235618.00 yuan
Project Name: S213 Tianmen City Jiuzhen to Pengshi (Hanjiang Bridge) Section Reconstruction Project (Starting Point to Zhanqian Avenue) Construction Bid Section
II Construction Location: Tianmen City
, Hubei Province Construction Scale: The project starts from Miaozui Village, Jiuzhen Town. Extend from the starting point to the east for about 3 kilometers and then turn to the south. A new bridge across the Hanbei River will be built on the east side of Yongan Driving School, and the end point will be connected with the high-speed railway pile-slab bridge along the river. The total mileage of the route is 5.
The second bid section: K3 + 400 ~ K5 + 663.453, with a length of 2.263 kilometers. Including extra-large bridge 1280. This project mainly focuses on the implementation, completion and defect repair of subgrade, pavement, bridge and culvert and related supporting works.