Tianjin Port No.4 Port Co., Ltd. Berth 22-24 Wharf Upgrading and Reconstruction Project Wharf Part Construction Bid Section
1 Construction Location: General Wharf Area of Beijiang Port Area of Tianjin Port
Project Overview: This project is located in the general wharf area of Beijiang Port Area of Tianjin Port. The existing No.22-24 berths will be upgraded from a 70,000-ton and a 50,000-ton general bulk cargo berth to a 250,000-ton general berth, and the length of the berth will take into account the simultaneous berthing of a 120,000-ton bulk cargo ship and a 30,000-ton general cargo ship.
Bidding scale: 540.9m
Bidding scope: The main work includes the construction of a new 24.5-meter-wide front pile platform and the demolition and reconstruction of the middle and rear pile platforms of the original wharf structure. Harbor basin dredging, navigation facilities, buildings and structures, power supply and lighting, water supply and drainage, fire protection, control, communication, environmental protection, safety and other supporting projects should be carried out simultaneously.
Planned construction period: from December 31, 2025 to Information on winning the bid on November 30
, 2027:
First place: The First Engineering
Co., Ltd. of CCCC First Harbor Engineering Co., Ltd. Bid price (RMB) 467282855.64
Second place: CCCC Second Harbor Engineering Co., Ltd.
Bid Price (RMB) 466833300
No.3: CCCC Third Harbor Engineering Co., Ltd.
Bid Price (RMB) 467953880.5