Anqing North New Town Water Conservancy Infrastructure Upgrading Project EPC mainly includes Longzhushan Area Soil Erosion Prevention and Control Project (Phase II), Anqing North New Town Industrial Plant Project (Phase II), Anqing Yixiu Economic Development Zone Sewage Treatment Plant and Reclaimed Water Recycling Construction Project, Anqing North New Town Rain and Sewage Pipeline Reconstruction and Expansion Project, Water conservancy project in industrial area (Sishi River Industrial Park Section), charging pile and supporting facilities construction project in Yixiu District of Anqing City.

Project Name: Design and Construction of China Nongchuang Silicon Valley Natural Farming Cangzhou Industrial Park Construction Project and Announcement of

Bid-winning Results of Agricultural Equipment Procurement Project Overview: The planned total area of this project is about 20,000 mu, with a total investment of 3 billion yuan and a total construction area of about 3.5 million square meters. The specific construction contents are as follows: 1. Natural Farming Cangzhou Industrial Park: The construction area is about 2.2 million square meters, mainly including breeding research and development center, laboratory building, intensive processing workshop of agricultural products, central kitchen, cold chain storage center, packaging workshop, urban agriculture experience center and other permanent buildings. In the part of agricultural facilities, modern planting facilities such as intelligent greenhouses and solar greenhouses will be built simultaneously, and technology research and development, seedling cultivation and digital farm operation will be integrated to build a full-chain agricultural industry system. 2. Jujube Zero Carbon Industrial Park: The construction area is about 800,000 square meters, focusing on the construction of agricultural, cultural and tourism facilities such as Zero Carbon Science Museum, Tourist Center, Jujube Culture Exhibition Center, Research Base and Catering Business, which are used to support the operation and service of "Jujube Theme Sightseeing Park". In the part of agricultural facilities, multi-span greenhouses and greenhouses for picking in four seasons are built to promote the deep integration of jujube planting and cultural tourism. 3. Three-level circulation system for veterans: The construction area is about 500,000 square meters. Through the revitalization of idle resources in counties and villages, the construction of centralized operation centers at district and county levels, township sub-centers and community service stations, supporting cold chain storage and terminal sales facilities, the two-way circulation network of agricultural products and industrial products is constructed. Fixed assets investment mainly includes land consolidation, construction, intelligent agricultural facilities, cold chain equipment, zero carbon system and digital platform.

Construction period requirements: Total construction period: 730 calendar days

Bid winning information:

Bid winning company: Beijing Feipeng Equipment Co., Ltd.

Zhongcheng Keze Engineering Design Group Co., Ltd

. CCCC Second Highway Engineering Co., Ltd. 0 HTML0U NK7 Henan Shuicheng Construction Engineering Co., Ltd. 0 HTML0 UNK8 Bid amount: 0 HTML0 UNK9 Construction and installation fee (yuan): 2960099622 yuan 0 HTML0 UNK1 0 Survey and design fee (yuan): 9900000 yuan 0 HTML0 UNK1 1 Project name: Longyang District Global Tourism Resources Integration Livable Demonstration Project Cheng (EPC + o) Announcement of Successful Candidates 0 HTML0 150000 2 Construction Scale: Build a demonstration model of cultural tourism in western Yunnan in Longyang District, connect the tourism resources of the whole region, and build a urban-rural integrated development pattern of "livable, industrial and tourist", with a total construction area of 90. (2) Activate 150000 square meters of idle assets. We will build 100000 square meters of cultural and creative workshop clusters for coffee, ancient paper-making, national clothing and other industries, 30000 square meters of residential clusters, and 20000 square meters of new service facilities such as convenience complexes. (3) To build a comprehensive system of "tourism plus" with residential clusters as the core, to create 50000 square meters of pastoral landscape, 6000 square meters of non-heritage cultural experience workshops, 3000 square meters of natural exploration, farming experience, non-hereditary inheritance and other characteristics of research bases and 10 camps. 0 HTML0 Estimated Contract Price for 133000 Lot 3: 133,000 Ten thousand yuan 0 HTML0 UNK1 4 Specific location and surrounding environment of the project site: Longyang District, Baoshan City 0 HTML0 UNK1 5 Bid winning information: 0 HTML0 UNK1 6 No.1: Yunnan Jiantou Ninth Construction Co., Ltd. 0 HTML0 UNK1 7 Zhongli Chengyuan Design Group Co., Ltd. 0 HTML0 UNK1 8 Yunnan Jiujian Dianchang Construction Co., Ltd. Limited Company 0 HTML 0 UNK1 9 Baoshan Longkai Construction Engineering Co., Ltd. 0 HTML 0 UNK2 0 Baoshan Zhumeng Construction Engineering Co., Ltd. 0 HTML 0 UNK2 2: Lincang Hongfu Construction Co., Ltd. 0 HTML 0 UNK2 2 Zhongming Engineering Design Consulting Co., Ltd. 0 HTML 0 UNK2 3: Yunnan Engineering Construction General Contracting Co., Ltd. 0 HTML0 UNK2 4 Zhongzhuan Engineering Design Co., Ltd. 0 HTML0 UNK2 5 Project Name: Announcement of EPC Bidding Results of Anqing North New Town Water Conservancy Infrastructure Upgrading Project 0 HTML0 UNK2 6 Construction Location: Anqing North New Town, Yixiu District 0 HTML0 UNK2 7 Construction Scale: Anqing North New Town Urban Water Conservancy Infrastructure Upgrading Project EPC mainly includes Longzhushan Area Soil Erosion Prevention and Control Project (Phase II), Anqing North New Town Industrial Plant Project (Phase II), Anqing Yixiu Economic Development Zone Sewage Treatment Plant and Reclaimed Water Recycling Construction Project, Anqing North New Town Rainwater and Sewage Pipeline Reconstruction and Expansion Project, Industrial Area Water Conservancy Project (Sishi River Industrial Park Section). Charging pile and supporting facilities construction project in Yixiu District, Anqing City.The 156407 of the

project is RMB 0.84 million yuan, and the 115539 of the project cost is RMB 0.3 million yuan (of which the 57452 of the project cost of housing construction is RMB 0.04 million yuan, the 46324 of the project cost of municipal projects is RMB 0.01 million yuan; The engineering cost of water conservancy projects is 11763 0.25 million yuan), and the survey and design cost is 2310. The specific construction scale and construction content are detailed in the design documents, and the detailed construction content is subject to the final determination of the construction unit. Estimated

contract price: RMB 1,178,500,000 yuan, including RMB 93,000 yuan 11553 of engineering cost (including RMB 0,400 yuan 57452 of engineering cost for housing construction projects and RMB 0,100 yuan 46324 of engineering cost for municipal projects); The engineering cost of water conservancy projects is 11763 2,500 yuan), and the survey and design cost is 2,310.

Planned construction period: 1,090 calendar days

. Bidding scope: This project is an EPC project. Project design: including but not limited to project scheme optimization, preliminary design (including preliminary design optimization), detailed design, special design, construction drawing design (including survey, drawing review, etc.), construction drawing budget (including preparation cost), construction drawing submission (including fire protection, civil air defense, lightning protection and related drawings); During the contract period, provide relevant design and construction technical services, and provide approval and construction application services, as well as special reports (including but not limited to environmental assessment, flood assessment, traffic assessment, energy assessment, earthquake, flood control, water and soil conservation, etc.) for all approval links in the whole process (if necessary), including report preparation, demonstration, review and assessment.

Project construction: including but not limited to procurement, construction and whole-process construction management within the scope of construction drawings; general contracting management and coordination, completion acceptance, preparation of as-built drawings, cooperation in acceptance, overall handover until the project is accepted, defect repair, warranty and maintenance within the quality defect liability period. Management and control of quality, safety, progress, cost, contract, information and archives shall be carried out within the contract period of the project; expert review and expert demonstration shall be organized during the construction process; all materials for project construction shall be purchased and kept in cooperation with the application for approval and construction.

Bid winning information:

Bid winning company: Anqing Baizehu Construction and Installation Engineering Co., Ltd.

Anhui Longwangda Construction Group Co., Ltd.

Anhui Construction Engineering Transportation and Navigation Group Co., Ltd.

Huike Design Group Co., Ltd. 0HTML 0 106432 0 Anhui Jufang Construction Engineering Co., Ltd. 0 HTML0 UNK1 1 Bid amount: 106432.0 HTML0 UNK1 2 V. Division of bid sections and bidding content, scale and bidding control price of each bid section: 0 HTML0 UNK1 3 Bidding scale: the first section of Line 1, the original Line 2 and Line 4 (station, centralized cooling station, depot, Section air kiosk, main substation and OCC). 0 HTML0 UNK1 4 Contract duration: 18 years, Including the reconstruction period 3 years 0 HTML0 924247622.0 5 Project bidding control price: 924247622.0 HTML0 924247622.0 6 Bid winning information: 0 HTML0 924247622.0 7 First place: (host) Guangzhou Metro Design and Research Institute Co., Ltd. 0 HTML0 924247622.0 8 (host) Guangzhou Kehui Energy Co., Ltd. 0 HTML0 924247622.0 9 Bid price (RMB): 923,901,427.050HTML0UNK2 0Second place: (Main) China Construction Fifth Engineering Bureau Installation Engineering Co., Ltd.0HTML0UNK2 1 (Part) Guangdong Shengwei Construction Engineering Co., Ltd.0HTML0UNK2 2 Bid price (RMB): 914,747, 644.310 HTML0 UNK2 3 Third place: Guangzhou Taiyang Energy Technology Co., Ltd. 0 HTML0 UNK2 4 Bid price (RMB): 924,247,622. The total length of the project route is about 3.523 kilometers, with four bridges of 1013.16 m and public pipe galleries. 3. The project is designed according to the standard of first-class highway. The design speed is 60 km/H, the standard section width of the subgrade is 34 m, the comprehensive pipe gallery plus the maintenance lane and the safety protection distance are 22 m wide, the emergency canal is 5 m wide, and the total width is 61 m. 0 HTML0 UNK2 5 The total estimated investment of the project is 2,071.03 million yuan, including 1,742.89 million yuan for construction and installation. The budget audit price of A1 bid section is 8569,777,933 yuan (including the provisional 25000000 of yuan).

Bid winning information:

Bid winning candidate: Fujian Construction Engineering Group Co.,

Ltd. Bid offer: 807811935 RMB (including provisional 25000000 RMB)


Project name: Comprehensive Protective Development Project of Longhu Ancient Village, Chaoan District, Chaozhou City F + E PC + 0 Announcement

of Bid Winning Result Project Overview: The protective comprehensive development project of Longhu Ancient Village, Chaoan District, Chaozhou City is a traditional village protection and comprehensive development project located in Longhu Town, Chaoan District, Chaozhou City. The project focuses on protecting the history and culture of the ancient village and improving rural tourism and public service facilities. The protection and development plan for 2021-2035 has been formulated. The total investment of the project is about 7.

Bid-winning information:

Bid-winning company: Guangdong Baotaisen Construction Engineering Co., Ltd.

Guangdong Shanhai Lianhe Cultural Industry Investment Co., Ltd.

Guangdong Geotechnical Engineering Survey Institute Co., Ltd.

Guangdong Zhongren Engineering Design Co., Ltd.

Bid winning amount: 653564184. Respectively: starting and ending mileage of Hujin Expressway Station SK (XK) 7 + 520.689 ~ SK (XK) 8 + 025.949; The starting and ending mileage of Zizhu High-tech Zone Station is SK9 + 079.700 (XK9 + 078.764) ~ SK (XK) 9 + 243.978; the starting and ending mileage of Jiangchuan East Road Station is SK (XK) 10 + 259.976 ~ SK (XK) 10 + 479. (2) Station overview 1) Hujin Expressway Station Hujin Expressway Station is located under Dongchuan Road, and is set along Dongchuan Road in the east-west direction on the east side of the intersection of Dongchuan Road and S4 Hujin Expressway. The station is an open-cut island station with two underground floors, the main building scale is 505.26 m (inner net length) X 19.54 m (inner net width), and the main building area is 21182. The station is equipped with 4 ground entrances and exits, 2 safety entrances and exits (one of which is also used as a fire entrance and exit), 3 groups of wind pavilions, and 2 barrier-free elevators. 2) Zizhu Hi-tech Zone Station Zizhu Hi-tech Zone Station is located in the east of the intersection of South Lianhua Road and Dongchuan Road. It is arranged in an east-west direction along Dongchuan Road and forms a channel transfer with Zizhu Hi-tech Zone Station of Line 15, which has been completed and put into operation. The station is an underground three-storey island station, with a main building scale of 164m (net length of inner structure) X 21.54m (net width of inner structure), an effective platform length of 140m, a platform width of 14m, a main building area of 12220 0.74m2, and an underground ancillary building area of 4442.7 m2. The ground auxiliary building area is 652.1 m2, and the total building area is 17315. The station is provided with 3 ground entrances and exits and 2 groups of wind pavilions. 3) Jiangchuan East Road Station Jiangchuan East Road Station is located under Dongchuan Road, about 200 meters east of the intersection of Dongchuan Road and Jiangchuan East Road, and is arranged in east-west direction along Dongchuan Road. The station is arranged along the east-west direction of Dongchuan Road. The main body of the station is an open-cut island station with two underground floors. The main building scale is 219.5m (inner net length) X 19.54m (inner net width), the effective platform scale is 140mx12m, the main building area is 9583.404m2, and the underground ancillary building area is 5639.733m2. The ground auxiliary building area is 1107.412 m2, and the total building area is 16330. The station is provided with four ground entrances and exits, and two groups of wind pavilions, which are located on the sidewalks on both sides of Dongchuan Road and in the planned green belt. The above description of the project shall be subject to the design drawings and corresponding electronic data.

All can be viewed after purchase
Correlation

Anqing North New Town Water Conservancy Infrastructure Upgrading Project EPC mainly includes Longzhushan Area Soil Erosion Prevention and Control Project (Phase II), Anqing North New Town Industrial Plant Project (Phase II), Anqing Yixiu Economic Development Zone Sewage Treatment Plant and Reclaimed Water Recycling Construction Project, Anqing North New Town Rain and Sewage Pipeline Reconstruction and Expansion Project, Water conservancy project in industrial area (Sishi River Industrial Park Section), charging pile and supporting facilities construction project in Yixiu District of Anqing City.