The total investment is 5.7 billion! China Railway Major Bridge Engineering Group Co., Ltd., China Communications Road Construction Co., Ltd., China Communications Second Public Engineering Institute

2025-12-23 11:04:28

This project starts from Guanqiao, Shifosi Town, Wuxue City, Hubei Province, crosses with G220 and Wushan Lake Ring Road, crosses Fengshou Port in the south, passes through Xiafeng Village, crosses G347, crosses the Yangtze River Bridge near Meijiazhuang, enters Ruichang City, Jiangxi Province, and ends at the north pier of Yanjiang Avenue Bridge in Wharf Town, Ruichang City, Jiangxi Province. It is connected with G220 Wuxue-Ruichang River-crossing Passage (Jiangxi Section). The total length is about 6.151 kilometers, the design speed is 80 kilometers per hour, the standard of two-way six-lane first-class highway is adopted, the bridge width is 37.7 meters, and the roadbed width is 33 meters.

Hubei Construction Investment Group Co., Ltd. participated in the selection of

the cooperative unit for the bidding of the investor of the G220 Wuxue-Ruichang River-crossing Passage (Hubei Section) Project. Construction site: Wuxue City, Hubei Province.

Construction scale: This project starts from Guanqiao, Shifosi Town, Wuxue City, Hubei Province. It crosses with G220 and Wushan Lake Ring Road, crosses Fengshou Port to the south, passes through Xiafeng Village, crosses G347, crosses the Yangtze River Bridge near Meijiazhuang, enters Ruichang City, Jiangxi Province, ends at the north pier of Yanjiang Avenue Bridge in Wharf Town, Ruichang City, Jiangxi Province, and connects with G220 Wuxue-Ruichang River-crossing Passage (Jiangxi Section). The total length is about 6.151 kilometers, the design speed is 80 kilometers per hour, the standard of two-way six-lane first-class highway is adopted, the bridge width is 37.7 meters, and the roadbed width is 33 meters. The total investment of this

project is estimated to be about 5.751 billion yuan.

Bid winning information:

WRTJ-2 Bid Section

No.1: China Railway Major Bridge Engineering Group Co., Ltd.

No.2: CCCC Second Highway Engineering Co., Ltd.

No.3: CCCC Road & Bridge Construction Co., Ltd.

W No.1 in RTJ-3 Section

: CCCC Road & Bridge Construction Co., Ltd.

No.2: China Railway Major Bridge Engineering Group Co., Ltd.

No.3: CCCC Second Highway Engineering Co., Ltd.

No.1 in WRSJ-1 Section

: China Communications Second Highway Survey and Design Institute Co., Ltd.

China Railway Bridge Survey and Design Institute Group Co., Ltd.

No.2: Hunan Communications Planning, Survey and Design Institute Co., Ltd.

No.3: Hubei Communications Planning and Design Institute Co., Ltd.

All can be viewed after purchase
Correlation

This project starts from Guanqiao, Shifosi Town, Wuxue City, Hubei Province, crosses with G220 and Wushan Lake Ring Road, crosses Fengshou Port in the south, passes through Xiafeng Village, crosses G347, crosses the Yangtze River Bridge near Meijiazhuang, enters Ruichang City, Jiangxi Province, and ends at the north pier of Yanjiang Avenue Bridge in Wharf Town, Ruichang City, Jiangxi Province. It is connected with G220 Wuxue-Ruichang River-crossing Passage (Jiangxi Section). The total length is about 6.151 kilometers, the design speed is 80 kilometers per hour, the standard of two-way six-lane first-class highway is adopted, the bridge width is 37.7 meters, and the roadbed width is 33 meters.

2025-12-23 11:04:28

CCCC Fourth Harbor Engineering Co., Ltd. successfully won the bid for the 360 million yuan wharf project, demonstrating its strength and competitiveness in the field of port construction.