On July 9, the tender announcement for EPC general contracting of roof distributed photovoltaic project in Fuchuan County, Hezhou City, Guangxi (02) was issued, and the tenderer was Rundian New Energy (Hezhou) Co., Ltd., a holding subsidiary of China Resources Power New Energy Investment Co., Ltd.
The project is located in Fuchuan County, Hezhou City, Guangxi Zhuang Autonomous Region, with a scale of 11.8 MWp . The project plans to install solar grid-connected power generation system and charging piles in Fuchuan County Phase III Distributed Photovoltaic and Charging Pile Project in Fuchuan County, Hezhou, Guangxi.
This mode is EPC mode, and the bidding scope includes but is not limited to:
construction schedule: the total construction period is 183 days . The EPC unit shall enter the site before August 30, 2025, and the photovoltaic power station and charging pile shall be started before September 15; the first batch of components shall be connected to the grid before November 15; the full-capacity grid-connected power generation shall be carried out before January 15, 2026; The photovoltaic power station and charging pile will be completed before February 28, 2026. In addition to the commercial reputation and relevant qualifications of No.0, the
bidder is required to have the following performance requirements:
from April 1, 2022 to the deadline for bidding (subject to the completion time). (1) Have at least one distributed photovoltaic EPC contract performance of 5MWp and above ; (2) Have at least one distributed photovoltaic project design and construction performance of 5MWp and above (can be the design and construction performance of different projects).
Note: The effective performance of the above two kinds of performance can be combined arbitrarily. Each kind is an effective performance, and at least two effective performances are provided.
The project accepts consortium bidding , and the number of members does not exceed 2 . In case of consortium bidding, each party of the consortium shall provide the performance corresponding to the division of labor in the consortium agreement. Bid
closing/opening time: 2025-07-30 09:30 (Beijing time, subject to further notice).