On October 26, Wencheng Branch of Zhejiang Wenzhou Ecological Environment Bureau issued a public announcement on the acceptance of the EIA of " Zhejiang Xinneng Wencheng County 70 MW Photovoltaic Power Generation Project ".
According to the announcement, the project is located in Yuhu, Zhou Rang and Dazhen, Wencheng County, Wenzhou City, Zhejiang Province. The land area of the photovoltaic field is 1185273m ². The nature of the leased land is mainly tea gardens, orchards and other gardens, which are constructed by Zhexin Green Energy Photovoltaic Power Generation Co., Ltd. of Wencheng County. The 28974 of the total investment is 90000 yuan . The total installed capacity of the

project is designed to be 69.92 MW (AC side), and the installed capacity of the DC side is 77 00966 MWp. All of them adopt 655 Wp monocrystalline silicon double-sided double-glass N-type Topcon photovoltaic modules , totaling 117572 blocks. The photovoltaic power generation system consists of 21 independent photovoltaic sub-arrays; each string consists of 28 modules in series, and every 26 ~ 29 modules are connected in series and in parallel to a 460kW string inverter .
The project is scheduled to start construction in March 2027 and complete in December 2027, with a total construction period of 9 months .
浙公网安备33010802003254号