On October 19, the Bureau of Ecology and Environment of Lincang City, Yunnan Province, issued an approval announcement on the environmental impact report form of Boshan Photovoltaic Power Generation Project (Phase II) .

It is understood that the project is located in Bangbie, Jiashan, Nazhao, Nago, Da and Xiaonai villages in Boshang Town, Linxiang District, Lincang City, Yunnan Province, and is constructed by Lincang Heze New Energy Co., Ltd. with a total investment of 640 million yuan .
The project is planned to have a photovoltaic AC side capacity of 160MW , a DC side installed capacity of 360MWp, a capacity ratio of 2.25, and 575 Wp single-sided monocrystalline silicon modules . A total of 626 100 photovoltaic modules are configured . The project is divided into 50 3.2MW power generation units, each photovoltaic power generation unit is equipped with a 3200kW box transformer and 10 320kW string inverters , and each unit is equipped with a photovoltaic module 12522 block. During the operation period of
the project, tea-light complementary planting of tea trees will be implemented under the photovoltaic panels.
浙公网安备33010802003254号