On October 13, Ruiyineng announced the result of EPC general contracting of 700000 kilowatt photovoltaic sand control project in Yecheng County .
The announcement shows that the winning bidder is Guiyang Survey and Research Institute Co., Ltd. of China Power Construction Group, with the winning bid price of 192,498,987 yuan and the winning bid unit price of 2.75 yuan/watt .
On September 5, the tender announcement was issued for the project, and the tenderer was Yecheng Ruiyineng New Energy Co., Ltd.
The project is located in Kashgar, Xinjiang, with a photovoltaic scale of 700000 kilowatts , a supporting energy storage of 70000 kilowatts/140000 million hours, and a 220 kilovolt booster station. Photovoltaic sand control lock boundary plot is Yecheng County No.1, with an area of 21000 mu.
Subsequently, on September 27, the project announced the successful candidates, a total of three enterprises were shortlisted, and the bidding unit price was 2.75-2.966 yuan/watt .