On September 2, Datang Chongqing Fengjie Baidi 100MW Centralized Photovoltaic and Fruit Complementary Test New Project EPC General Contracting Tender Announcement was issued, and the tenderer was Datang Sanquan (Chongqing) Clean Energy Co., Ltd.
The announcement shows that the construction site of the project is Baidi Town, Fengjie County, Chongqing, with a construction scale of 100MW, and the planned construction period is tentatively scheduled from September 30, 2025 to September 29, 2026.
The bidding scope includes the preliminary design of the project, the survey and design of construction drawings and the preparation of as-built drawings (including photovoltaic power plants , collector lines, overhead lines, etc.), including the preparation of project filing change reports and the obtainment of approval documents from the competent authorities.
This tender requires bidders to have good business status, business reputation and corresponding qualifications. In terms of performance, the bidder must have 2 or more 100MW (or Performance of completed EPC general contracting of complementary photovoltaic power stations in mountainous areas or agricultural photovoltaic (including forest photovoltaic) (MWp) and above .
The project accepts consortium bidding, and the consortium allows up to two units to form a joint venture. Deadline for
submission of bidding documents: 9 o'clock on September 23, 2025.