On August 28, Hebei Huadian Langfang Anci Donggu Port 120 MW Photovoltaic Project PC General Contracting Tender Announcement was issued, and the tenderer was Huadian (Langfang Anci District) Technology Development Co., Ltd.
The total installed capacity of the bidding project is planned to be 120 MW, 221,924 N-type 650Wp monocrystalline silicon double-sided modules will be installed , and a 220 kV booster station will be built. The planned construction period of the project is 10 months, and it is planned to start on September 15, 2025, put into operation on December 31, 2025, and put into full capacity on June 30, 2026.
The announcement shows that the bidder's scope of work includes but is not limited to construction and installation projects, material procurement, related formalities and coordination, responsible for internal and external acceptance inspection, construction project "three simultaneous" work, quality engineering requirements and other work. Project supervision, feasibility study, survey and design, production preparation fee, purchase of production vehicles and engineering construction management of the tenderee are within the scope of responsibility of the tenderee.
It is worth noting that the actual site may change due to the impact of land use policy and civil coordination. The bidder shall consider the above risks comprehensively, and the contract price shall not be adjusted due to the above reasons.
This tender requires bidders not only to have good business ability, commercial credit and corresponding qualifications, but also to have good performance from January 1, 2022 to the deadline for bidding. It shall have the construction performance of at least one photovoltaic project with a single capacity of 100MW or above and the construction performance of one 110kV or above booster station. Consortium bidding is not accepted for
this project. Deadline for
submission/time of bid opening: 9:00, September 18, 2025.