State Energy Group Issues 513 MW Module Tender

2025-11-17 10:50:31

The scope of this tender involves the PV modules required for the north of Plot 16 # and Plot 20 # of the project, with a total DC side capacity of about 513.53 MWp, all of which will adopt N-type TopCon double-sided double-glass high-efficiency modules with a power of 640Wp/645 Wp.

On November 15, the tender announcement of Aba Rong'an 1150MW

" of Dadu River Company showed that. Aba Rong'an 1150MW

The procurement scope of this tender involves project 16 The tender is divided into two packages , covering the whole process of component supply, matching plugs, transportation and on-site technical services. The supply is scheduled to be completed by September 30, 2026.

that consortium is not accepted in this tender Bidding and agent bidding are not accepted . The

deadline for bid submission and bid opening is 9:00 (Beijing time) on December 8, 2025.

All can be viewed after purchase
Correlation

On February 1, Daqin Electric Power (Kunming) Group Co., Ltd., a subsidiary company of "Shaya County Qin Power Investment New Energy Co., Ltd. 490000 kW Photovoltaic Sand Control" EPC Project (2025) Bid Section I (the second time), announced the successful candidates. Hangyang Electric Power Construction Co., Ltd. (The leader of the consortium) and Xinjiang New Energy Research Institute Co., Ltd. (The member of the consortium) are the first candidates with the bidding price of about 2.49 yuan/W.

2026-02-02 17:18:05

On January 30, the EPC project of 100MW fishing-photovoltaic complementary photovoltaic power generation project in Wangji Town, Siyang County, Jingneng was tendered by the Central China Branch of Beijing Jingneng Clean Energy Power Co., Ltd.

2026-02-02 13:20:53

Hohhot announced the allocation results of independent energy storage projects from 2026 to 2027: a total of 8 projects with a total scale of 2.5G W/9.52 GWh, and central enterprises and private enterprises such as CGN, CECEP, Datang and China Energy Construction participated in the bidding.

2026-02-02 13:16:28

Inner Mongolia Wulate Rear Banner announced the bidding results of three independent new energy storage projects with a total of 500 MW/2G Wh in 2027.

2026-02-02 13:16:22

Digital New Energy DataBM. Com was informed that on February 1, Daqin Electric Power (Kunming) Group Co., Ltd., a subsidiary company of "Shaya County Qin Power Investment New Energy Co., Ltd. 490000 kilowatt photovoltaic sand control" EPC project (2025) bid section 1 (second) successful candidate announcement.

2026-02-02 13:06:23

The track laying length of the special line is 1.014 km. Two new cargo lines with an effective length of 400m and one safety line with an effective length of 50m will be built. A new machine waiting line with an effective length of 90 meters, a new container yard (19450 m2) and supporting facilities such as communication, information, signal, power, water supply and drainage will be built. (2) Main technical standards. It is constructed according to the standard of special railway line, with a design speed of 40 km/H, a minimum curve radius of 300 meters, a flat slope, a diesel traction, and a traction mass of 3000 tons.

2026-02-02 10:33:10

On January 29, the tender announcement for EPC design and construction of 180MW photovoltaic power generation project in Longchuan County, Yunnan Province was issued. The tenderer was Tianjing New Energy Co., Ltd. of Longchuan County, with a self-financing source of 470 million yuan.

2026-02-02 09:13:31

Gansu First Construction Group Co., Ltd. and China Construction Fifth Engineering Bureau Co., Ltd. ranked first among the successful candidates for the first bid section and the second bid section respectively, and the bidding unit price was 2.77 yuan/W.

2026-02-02 09:11:43

On January 28, Huarun Guangxi Pingnan Danzhu Mine Repair 100MW Photovoltaic Project Photovoltaic Module Bracket Equipment Tender Announcement was issued, and the tenderer was Huarun New Energy (Pingnan) Co., Ltd.

2026-02-02 09:11:25

Digital New Energy DataBM. Com has learned that the People's Court of Xinwu District, Wuxi City, Jiangsu Province, will conduct a public auction (sale) on the Ali Judicial Auction Network Platform from 10:00 on February 11, 2026 to 10:00 on February 12, 2026. The auction target is the machinery and equipment of Xuzhou Heou Photovoltaic Technology Co., Ltd.

2026-02-02 09:11:03

The Spring Festival holiday is approaching, and the component production schedule is expected to be lowered in February.

2026-01-30 17:29:08

On January 28, Lintan County 300 MW Distributed Photovoltaic Corridor Project (PC) general contracting successful candidates announced that Gansu First Construction Group Co., Ltd. and China Construction Fifth Engineering Bureau Co., Ltd. were the first successful candidates for the first and second bidding sections respectively, with the bidding unit price of 2.77 yuan/W.

2026-01-30 16:47:39

The construction scope of this project includes subgrade and pavement, bridge and culvert, tunnel, route crossing, traffic engineering, toll station, maintenance work area, tunnel management station, environmental protection and other sub-projects and ancillary works.

2026-01-30 11:13:51

The total construction area of the project is about 145.77 mu, the total building area is about 125,700 square meters, and the capacity building area is about 75,700 square meters. It mainly involves the construction of a stadium with a 31700 of square meters, a gymnasium with a 12000 of square meters, a swimming pool of 3500 square meters, a national fitness center of 9000 square meters, a sports school of 6000 square meters, an underground parking lot of 50000 square meters, a commercial supporting 13500 of square meters, outdoor sports venues and greening projects.

2026-01-30 11:13:46

The total land area of this project is 117917. 89 ㎡ (about 176.88 mu), and the total building area is 855.20.97 ㎡. The construction includes new comprehensive buildings, libraries, teaching buildings, training buildings, dormitory buildings, canteens, ancillary buildings and supporting projects, as well as supporting teaching equipment and facilities. After the completion of the project, it can accommodate about 250 teachers and 2300 students.

2026-01-30 11:13:42

This project is located on the west side of Gulei Petrochemical Base. It starts from the end of the land section of Shugang Avenue Phase I Project on the west side in the north and ends at Daizi Road in the south. It is planned to construct the road, bridge, seawall, comprehensive pipe gallery, emergency canal and other projects of Gulei Refining and Chemical Integration Shugang Avenue (Xingzai-Daizi Section), as well as supporting projects such as power supply, lighting, water supply and drainage, and ancillary pipelines. The total length of the project route is about 3.523km, with 4 bridges of 1013.16m and public pipe gallery of 3.523km. The project is designed according to the standard of first-class highway, with the design speed of 60 km/H, the standard section width of the subgrade of 34 m, the comprehensive pipe gallery plus the maintenance lane and the safety protection distance.

2026-01-30 11:13:37

This project is planned to build the fourth generation of residential buildings compatible with large public transport hub stations, and supporting the construction of commercial buildings. The total building area is 226,628 square meters, of which the above-ground building area is 179,628 square meters and the underground building area is 47,000 square meters; The total capacity building area is 159,399 square meters, the non-capacity building area is 67,229 square meters, and the single building area is about 53,657 square meters (of which the residential basement building area is 41,679 square meters, and the 13 # building building area is 11,978 square meters). Compatible transport hub land, transport hub

2026-01-30 11:13:32

On January 29, the tender announcement for the design and construction of Matai 250 MW photovoltaic project in Linxiang District, Lincang City, Yunnan Province was issued, and the tenderer was Lincang Xianghe New Energy Co., Ltd.

2026-01-30 09:26:12

On January 28, Shanxi International Energy Group New Energy Investment Management Co., Ltd. announced the tender announcement for the centralized procurement project of photovoltaic modules in 2026.

2026-01-29 17:20:26

In the first half of the week, four manufacturers, Longji, Tianhe, Jingao and Aixu, raised their component quotations again! The highest price reached 90 cents to 1 yuan. The main reason for this is that the upstream silver price has been soaring.

2026-01-29 16:58:11

Bengbu Section of Huaiyuan-Fengtai Expressway, the project route starts from the northwest side of Junwang Service Area of G3 Beijing-Taiwan Expressway in Chenji Town, Huaiyuan County, connects with the current G3 Beijing-Taiwan Expressway, lays from north to south, passes through the west side of Bengbu Airport, crosses the North Feihe River on the west side of Feihe Town, and then crosses the Vortex River and the Euryale River on the west side of Fannan Town and the east side of Heliu Town. It continues southward through the east side of Lanqiao Town and the west side of Bailianpo Town, crosses the Cihuai New River, ends at the boundary of Bengbu and Huainan in Huangwei Village, Tangji Town, and connects with the Huainan section of Huaiyuan-Fengtai Expressway, with a total length of about 55.48 km.

2026-01-29 11:46:01

It is located in the east of Xinhuai Avenue, south of Hongshiqiao North Road, west of Huangjin Road and north of Gaoqi East Road. The construction includes residential buildings, supporting garages, supporting businesses and so on. It covers an area of about 222 mu and has a total building area of about 299,000 square meters, of which the underground building area is about 83,000 square meters and the above-ground building area is about 216,000 square meters.

2026-01-29 11:45:56

Guantai Road Upgrading and Reconstruction Phase II (Keyuan Tunnel) Project starts about 300m north of the intersection of Wanlu Road and Guansui Road, crosses Wanlu Road, Xinlian Street and Huayuan Road southward along Guansui Road, sets parallel ramps on the southeast side of Wanlu Road Intersection to connect the ground road and the main line tunnel, and then adopts the whole immersed tube tunnel on the south side of the current Wanjiang Bridge. After crossing the river, two directional ramps will be set up to connect Dongjiang Avenue on the ground. The tunnel will be laid along Keyuan Road to the southeast, passing through Dongjiang Avenue, Kehu Street, Canal West 2nd Road, Canal East 2nd Road and Dongguan Canal. A pair of directional ramps will be set up on Canal West 2nd Road to connect Canal West 2nd Road. The main tunnel is located at

2026-01-29 11:45:51

Taizihe Pumped Storage Power Station in Liaoning Province is a key project of the national "14th Five-Year Plan". It is located in Benxi County and Mingshan District of Benxi City, Liaoning Province. The power station is about 45 km away from Benxi City and 110 km away from Shenyang City. After completion, the power station will mainly serve Liaoning power grid, with installed capacity of 1800 MW (6 units in total), continuous full load hours of 6 hours, rated head of 427 m, and distance-to-height ratio of 5.96. The project construction scale is large (1) type, and the project grade is first class.

2026-01-29 11:45:45

On January 23, Zhongneng Shengshi Maigaiti County 1 million kilowatt photovoltaic sand control power generation project (EPC bid section, supervision bid section) was tendered publicly. The tenderer is Zhongneng Shengshi (Maigaiti) Energy Development Co., Ltd., and the project is located in Maigaiti County, Kashgar, Xinjiang.

2026-01-29 11:34:07

On January 27, the Natural Resources and Planning Bureau of Yixing City, Jiangsu Province, issued the "Pre-approval Announcement of the 100MW Fishing-Photovoltaic Complementary Power Generation Project in Yangxiang Town, Yixing City, Three Gorges".

2026-01-28 17:50:22

According to the feasibility study report of the project, the general situation of the project is as follows (subject to the Project Application Report approved by the competent investment department): The Sanmenxia-Luoning Expressway Project starts from Sanmenxia City, connects with Lianhuo Expressway, runs southeast through Sanmenxia Hubin District, Shaanzhou District and Luoning County of Luoyang City, and ends at the north side of Xishandi Township of Luoning County, connecting with Luolu Expressway. The route is 64.37 kilometers long, including 39.63 kilometers in Sanmenxia City and 24.74 kilometers in Luoyang City.

2026-01-28 14:13:20

Construction and installation works of conventional island and BOP of TY project, including all conventional island subitems, some BOP subitems, some temporary works; corridors, roads and pipe networks within the area; building signs and lightning protection and grounding of engineering buildings, etc.

2026-01-28 14:13:14

The Digital New Energy DataBM. Com was informed that on January 24, the EPC general contracting tender for the 100m W photovoltaic composite power generation project in Yongji City, Shanxi Province was terminated due to the failure of the tender.

2026-01-28 09:41:26

On January 23, Turpan Zhitai Electric Power Development Co., Ltd. issued a tender announcement for the EPC general contracting project of the 100 MW/400 MWh hybrid independent energy storage power station in Gaochang District.

2026-01-27 17:28:21

Shanxi optimizes the time-of-use electricity price mechanism, cancels the artificial regulations, dynamically adjusts the peak and valley electricity prices according to the spot market, promotes the integration of medium and long-term transaction price limits with the spot market, and realizes the more marketization of electricity price fluctuation.

2026-01-27 14:22:11

Digital New Energy DataBM. Com was informed that on January 23, Guangzhou Development Chongqing Xiushan Photovoltaic Project EPC General Contracting Tender Announcement was issued, and the tender unit was Guangzhou Development New Energy Group Co., Ltd.

2026-01-27 11:51:38

Agent construction project: including the resettlement housing plots JW-H-02 and JW-H-04, the park green land plot JW-D-02 (Jiangbin Post Station), and the plots JW-D-02 a and 02b (religious sites and commercial land). The total investment of the above projects is about 892.76 million yuan.

2026-01-27 11:19:05

The project is located in the 72-74 # berth and rear storage yard area on the north bank of Qianwan Port Area of Qingdao Port. It is planned to transform the existing 72-74 # general cargo wharf into a 150,000-ton multi-purpose wharf and construct corresponding supporting facilities. After reconstruction and expansion, the wharf shoreline is 534.36 meters long, and the designed annual throughput capacity of the wharf is 10.42 million tons (including 1.03 million standard containers). The front container yard is arranged in the rear jetty area of 72-74 # berth, and the container yard is arranged in the rear area of the west side. The construction contents mainly include wharf, intelligent yard, harbor basin water area, etc.

2026-01-27 11:19:00

The project includes the main buildings of the outpatient and emergency complex building, the inpatient complex building and the prevention and research complex building. The construction contents include: outpatient service, emergency service, medical technology, hospitalization, administrative logistics, support system, scientific research experiment, underground garage, equipment room, outdoor engineering, underground civil air defense engineering, etc. The planned number of hospital beds is 500. The total floor area of the hospital is 52532. 56 square meters, and the total building area is 108139. 15 square meters (i.e. The building area specified in the project planning permit), of which: 1 # hospital building, 15 floors above the ground, with a 73332 of. 89 square meters; 2 # and 3 # staircase buildings, one floor above the ground, with 30.

2026-01-27 11:18:55

On January 12, China Securities Journal, a subsidiary of Xinhua News Agency, published an article entitled "Breakthrough and Rebirth: a Record of Green Transformation of Enterprises", which focused on the practice of Zhuozhou Base of Beixin Building Materials to promote the green transformation of the whole chain with environmental protection as the priority. Zhuozhou Base builds a national "green factory" through raw material substitution, technological innovation, management upgrading and technological innovation, realizes the simultaneous improvement of environmental and economic benefits, and provides a realistic reference for the transformation of traditional manufacturing industry.

2026-01-27 09:49:38

According to incomplete statistics, in the past month, the bidding for many energy storage projects in China has been terminated, with a total scale of nearly 3 GWh. Most of the reasons are major changes in the project procurement plan or content.

2026-01-26 17:06:56

On January 22, Taiyuan Precision Control Energy Technology Co., Ltd. invited tenders for EPC project of Taiyuan 500MW/1000MWh New Energy Storage Project.

2026-01-26 16:47:09

Rongli New Energy Holding Company, an anode material enterprise, led the investment in two 200MW/800MWh independent energy storage projects in Ningxia, with an EPC bidding unit price of about 1 yuan/Wh.

2026-01-26 15:11:21

(1) Rectify and renovate the disordered and staggered points of the 15 hm ² drainage system in Dianbai District, renovate the drainage pipe network of 300 km in the area, repair 30 km of defective drainage pipes, and repair and renovate 2 km of structurally damaged drainage culverts; (2) Build 15 km of new drainage pipes and set 200 drainage outlets; (3) Renovate 8 waterlogging-prone water accumulation points in Dianbai District and build 2 new drainage pumping stations. (4) Reconstruction of drainage pipe network in the area of Haibin Avenue (east side of Sengao Flood Drainage Channel).

2026-01-26 13:15:00

Including but not limited to assisting the construction unit to handle the relevant procedures of the project construction, responsible for the whole process of design, preparation of as-built drawings, procurement, construction, responsible for communication and coordination with the Metro Group during the construction process, completion acceptance, delivery, final accounts, warranty, transfer of project archives, operation of cultural and sports venues, park management and operation, and the implementation of the Employer's requirements.

2026-01-26 13:14:44

Muwangxi Pumped-storage Power Station in Taoyuan is a first-class large (1) project, with a total installed capacity of 1200 MW and four 300 MW reversible generating units. This bidding project mainly includes the construction of lower reservoir, water conveyance system (including the fabrication and installation of penstock), civil engineering of underground powerhouse and related construction auxiliary works.

2026-01-26 13:14:34

The franchise scheme of the franchisee (project name, hereinafter referred to as "this project") of the new project of National Highway 310 moving southward to Kaifeng (the section from the junction of Kaifeng and Shangqiu to S223) has been examined and approved by the Kaifeng Development and Reform Commission. Review Opinions of Kaifeng Municipal Development and Reform Commission on the Franchise Scheme of the New Construction Project of National Highway 310 Moving Southward to Kaifeng (Section from the junction of Kaifeng and Shangqiu to S223) (Bian Fa Gai Ji Ji (2025) No.410) This project (project code: 2310-410200-04-01-929716) has been approved by the Franchisee Standard conditions

2026-01-26 13:14:30

The journey is full of wind, and the heavy task is to set sail again. China Railway Construction Corporation is taking the "four transformations" as the driving force, building the foundation of supply chain management through digital intelligence, and writing a new chapter of deepening and upgrading supply chain management in the process of building a world-class enterprise.

2026-01-26 13:05:33

On January 25, Guoneng Dadu River Company invited public bidding for EPC general contracting project of Aba Rong'an 1150MW Photovoltaic Project (Phase II), and the project unit was Guoneng Dadu River Basin Hydropower Development Co., Ltd.

2026-01-26 11:08:59

On January 23, Zhongneng Shengshi Maigaiti County 1 million kilowatt photovoltaic sand control power generation project (EPC bid section, supervision bid section) was tendered publicly. The tenderer was Zhongneng Shengshi (Maigaiti) Energy Development Co., Ltd. and the source of funds was self-financing of 3 billion yuan.

2026-01-26 10:44:41

Recently, Xizang Tianlu announced that the company intends to sell all 41.7694 million shares of China Electric Power Construction through centralized bidding within 12 months in order to optimize the asset structure and improve the yield.

2026-01-26 10:41:36

Recently, Xizang Tianlu (600326. SH) announced that in order to further optimize the company's asset structure and improve the rate of return on assets, the company agreed to authorize the chairman of the company, according to the changes in the securities market, within 12 months from the date of approval by the board of directors, under the condition that the risk is controllable and does not affect the normal operation of the company. Through the Shanghai Stock Exchange system, the stock assets held by China Electric Power Construction will be sold by means of centralized bidding.

2026-01-26 09:23:10

A total of four enterprises were shortlisted.

2026-01-26 09:20:19

The statistics of fixed asset investment and real estate from January to October 2025 show the situation of the whole country and regions in many aspects. On the whole, the cumulative year-on-year data of fixed assets investment, housing construction area, new construction area and completed area in various regions are positive and negative. Among them, in Xizang, the cumulative year-on-year data of fixed asset investment and completed housing area changed significantly, for example, the cumulative year-on-year data of fixed asset investment reached 16.70%, and the cumulative year-on-year data of completed housing area reached 90.50%; while in Tianjin, the cumulative year-on-year data of new housing area changed relatively small, which was 0.15%.