1. Project Overview
Shandong Shanshui Cement Group Co., Ltd. (Hereinafter referred to as the "Tenderee") is headquartered in Jinan City, Shandong Province. Cement production and
1. The winning bidder directly signed a contract with Shuozhou Shanshui New Age Cement Co., Ltd. for independent settlement.
2. The specific technical standards, supply and service scope are detailed in Part II Technical Requirements of the Bidding Document. 3.4.5
.
(2) Delivery rules: the bidder shall submit the shortest delivery period by itself, which shall be included in the comprehensive review.
(3) Payment rules: After the installation, commissioning and acceptance are qualified, and the Seller issues a special invoice for 13% of the total amount of the value-added tax, the Buyer shall pay 90% of the total contract price in the form of electronic bank acceptance; the remaining 10% shall be used as the quality guarantee deposit, and shall be paid without interest after the expiration of the quality guarantee period when there is no quality objection. Follow the principle of "invoice first, pay later". The Tenderer may submit the payment deviation scheme, which shall be included in the comprehensive review.
(4) Quality assurance rules: The quality assurance period is 12 months after the installation, commissioning and acceptance, or 18 months after the goods arrive at the factory, whichever comes first.
(5) Site survey: The Tenderee will not organize site survey uniformly. Before bidding, the Bidder may contact the technical contact of the Buyer to make an appointment for reconnaissance and fully verify the site conditions, including but not limited to: the operation status of the existing rotary kiln second gear belt and riding wheel, the matching status of the cylinder and the belt, the site hoisting and replacement conditions and all other contents affecting the quotation and implementation. After winning the bid, the Seller shall not put forward the requirements for contract price adjustment or additional costs on the grounds that the site conditions are inconsistent with the description of this document, the parameters are missing, and the conditions are inconsistent.
(6) Drawing rules: the drawings (drawing No. J984B2-10 (SZ), J984L3-1P-01 (SZ)) shall be provided by the Buyer and distributed together with the bidding documents; See Section 3 of Part II Technical Requirements for details of drawing caliber, review, objection, signature confirmation and responsibility division. The bidder shall review the drawings by itself, and the bidding is deemed to have confirmed the drawings and meet the manufacturing requirements. If there is any objection to the drawings, it shall be put forward in writing before the deadline for bidding, and if there is no objection, it shall be deemed to have no objection.
2. The bidder's qualification requires
that the bidder must meet the following access conditions. Corresponding valid supporting documents shall be provided in the bidding documents:
1.2.3
. In recent 3 years (within 36 months before the deadline for bidding), there are ≥ 2 items Φ4.4.5.6.0
HTML 0 UNK2 37.0 HTML 0 UNK2 48.0 HTML 0 UNK2 5 III. Registration requirements 0 HTML 0 UNK2 61. Registration deadline: 9:00, November 23, 2026. The bidder must complete the Big Enterprise Exchange Platform (https://www.daqihui.0HTML0UNK272.0HTML0UNK28 IV. Submission of Bidding Documents 0HTML0 UNK2 91.
2. Submission requirements: One electronic bidding document in PDF format shall be sent to the designated mailbox 841307051 @ QQ.
V. Bid bond
No bid bond or performance bond shall be charged for this project.
6. Bid opening and selection
1.2
. The tenderee does not promise to accept the lowest bid and does not explain the reasons for not winning the bid.
浙公网安备33010802003254号