Dalian Shanshui Cement Co., Ltd. Line a Roller Press Hydraulic Control System Renovation Project Tender Announcement

2026-11-27 19:58:10

The public bidding for the reconstruction project of hydraulic and electric control system of roller press in Line A of Dalian Shanshui Cement requires the bidder to have the same performance, qualification and performance ability in the cement industry, and to adopt comprehensive evaluation + secondary quotation.

1. Project Overview

Shandong Shanshui Cement Group Co., Ltd. (Hereinafter referred to as the "Tenderee") is headquartered in Jinan City, Shandong Province. Cement production and

1. The winning bidder directly signs a contract with Dalian Shanshui Cement Co., Ltd. for independent settlement.

2. The specific technical standards, supply and service scope are detailed in Part II Technical Requirements of the Bidding Document. 3.4.5

.

(1) Quotation rules: This project adopts the process of the first round of bidding + centralized communication and clarification + the second final quotation. The bid price is the total fixed tax-inclusive price, including all the expenses required for the normal delivery and operation of the equipment, such as design, equipment, demolition guidance, installation technical guidance, commissioning, training, materials, transportation, insurance and 13% value-added tax.

(2) Delivery rules: the bidder shall submit the shortest delivery period by itself, which shall be included in the comprehensive review.

(3) Payment rules: 60% of the contract amount shall be paid if the goods are accepted, 30% shall be paid if the installation and commissioning are qualified, and 10% shall be paid without interest after the warranty period expires and there is no quality objection. The buyer can pay by electronic bank acceptance draft. Follow the principle of invoicing before payment. The Tenderer may submit the payment deviation scheme, which shall be included in the comprehensive review.

(4) Quality assurance rules: The quality assurance period is 12 months from the date of acceptance of the system.

(5) Site survey: The Tenderee will not organize site survey uniformly. Before bidding, the bidder may contact the technical contact of the buyer to make an appointment for reconnaissance. The bid price is deemed that the bidder has completed the site verification and fully understood the site conditions. After winning the bid, the Seller shall not propose to adjust the contract price or increase additional costs on the grounds that the site conditions are inconsistent with the description in this document or the data is missing.

2. The bidder's qualification requires

that the bidder must meet the following access conditions. Corresponding valid supporting documents shall be provided in the bidding documents:

1.2.3.4.5.6.7.

III 1. Application requirements

1. Deadline for application: 9:00 on December 4, 2026. Bidders must complete the Daqihui Platform (https://www.daqihui.2.

IV. Submission

of Bidding Documents 1.

2. Submission requirements: The bidding document is an electronic bidding document (PDF format, with electronic signature or page by page with official seal), sent to the designated mailbox 841307051 @ QQ.

V. Bid bond

This project does not charge bid bond, no performance bond.

6. Bid opening and selection

1.2

. The tenderee does not promise to accept the lowest bid and does not explain the reasons for not winning the bid.

All can be viewed after purchase
Correlation

The public bidding for the reconstruction project of hydraulic and electric control system of roller press in Line A of Dalian Shanshui Cement requires the bidder to have the same performance, qualification and performance ability in the cement industry, and to adopt comprehensive evaluation + secondary quotation.

2026-11-27 19:58:10

Through energy-saving technology, photovoltaic application, ultra-low emission, solid waste recycling and ecological construction of the plant, Xiangshan Conch has built a national green factory demonstration benchmark integrating clean production, resource recycling and low-carbon operation.

2026-03-17 11:56:16

Wu Wenguang takes responsibility as the first and practical work as the key, and has made outstanding achievements in equipment management, technological innovation and team building, demonstrating the dedication and professionalism of industrial workers in the new era.

2026-02-27 12:55:51

On February 18, the first working day of the Year of the Dragon arrived as scheduled, and conch people quickly switched from "vacation mode" to "work mode".

2024-02-20 09:23:31

On the morning of April 3, Pingyi Zhonglian completed the acceptance of the first phase of the project with an annual output of 200,000 tons of active calcium oxide and synchronous technical transformation of raw material tube mill into roller press final grinding.

2023-04-06 15:57:26

On November 26, 2026, Zhou Yuxian, President of China Cement Association, and his delegation went to Hubei to investigate the cement industry symposium held in Wuhan. Zhou Yuxian, president of China Cement Association, attended and delivered a speech. Wang Xuejun of Hubei Cement Industry Association presided over the meeting. Representatives of key enterprises such as Huaxin, Gezhouba, Queshi, Yadong, Jinglan and Jianfeng attended the meeting. Chen Berlin, Vice Secretary-General of China Cement Association, Hao Guozhu, Director of Party Construction Ministry of Culture, and Xiong Yue, Secretariat, participated in the survey, which was hosted by Queshi Group.