On November 18, China Resources Power Tongchuan 100 MW/200 MWh Independent Energy Storage Power Station Project-Energy Storage Area PC General Contracting Project Tender Announcement was issued. The project is contracted in the mode of construction general contracting. The scope of the project includes: procurement of all equipment and materials in this bid section, unloading and storage (including equipment supplied by Party A), cleaning and coordination of attachments on the ground within the scope of this bid section, civil engineering, installation, commissioning, testing, trial operation, quality assurance, etc.
From November 1, 2023 to the deadline for bidding, the bidder must provide the construction completion performance of not less than two electrochemical energy storage projects with nominal capacity of 100 MWh and above , or the construction completion performance of not less than two 110 kV and above voltage level booster stations. Consortium bidding is not accepted
in this tender, and the deadline for bidding is 9:30 on December 9, 2026.
浙公网安备33010802003254号