On September 29, the tender announcement for the procurement of photovoltaic module equipment for the 330 MW photovoltaic storage demonstration project in Kangbao County, Chahanaoer River Basin Management + Rural Revitalization Phase II was issued, and the tenderer was Hebei Jiaotong Kangnuo Energy Co., Ltd. The
tender announcement shows that the project is located in Kangbao County, Zhangjiakou City, Hebei Province, with a planned total installed capacity of 330 MW (396.00 02004 MWp on the DC side), divided into several scattered plots, and a new 220 kV booster station. Wherein, 620MWp monocrystalline silicon rectangular sheet N-type double-sided component and fixed support are adopted, the capacity ratio is 1: 1.2, and the structural size is 2382 * 1134 * 30.
In this tender, the bidder shall provide monocrystalline silicon solar cell modules and necessary accessories, design, manufacture, factory test, packaging, transportation, delivery, acceptance, field test, technical documents (including drawings, instructions, calculations, standards and specifications) and technical services for monocrystalline silicon solar cell modules. The Bidder shall be fully responsible for the work within the above scope of work. Meet the requirements of the Tenderee for installation, commissioning, operation and equipment performance, provide technical services and cooperation related to equipment installation, commissioning and operation, and provide necessary accessories, spare parts, special tools, technical documents and related technical services (the Tenderer shall list them in detail).
Delivery date: October 2025 is the delivery date of the first batch, and the delivery quantity is 200MWp; the remaining components will be delivered in November 2025.
It is worth noting that the warranty period shall be calculated from the date when the contract equipment is installed, passes the preliminary acceptance and performance acceptance test, and the Buyer issues the Pre-acceptance Certificate. The warranty period for PV module materials and processes shall not be less than 12 years, and the warranty period for power shall not be less than 30 years. Consortium bidding and agent bidding are not accepted
in this tender. The deadline for submission of
bidding documents is 2025-10-23 09:00:00.