On September 5, Huasheng New Energy Xuancheng Phase III High Efficiency Heterojunction Module Project was successfully launched and formally entered the stage of full mass production.
It is reported that the highest power module in the first batch of mass production of heterojunction modules reached 720 W, which once again refreshed the self-created record of mass production power of heterojunction modules, leading the mass production level of photovoltaic modules into a new stage of 720 W +.
According to the Digital New Energy DataBM. Com, this is the tenth heterojunction intelligent chemical plant put into operation by Huasheng New Energy in Xuancheng, which was put into operation on August 7, 2023.
The third phase component project has a planned capacity of 8GW, which is the largest component workshop in the field of heterojunction at present, and is also the first intelligent manufacturing workshop with a single-line design rhythm of 16s. The project will mainly produce three mainstream size heterojunction modules with large market demand, namely 210, 182 and 182R.