On December 7, the Three Gorges Group announced the results of centralized procurement of photovoltaic modules for 2023 photovoltaic projects. Three Gorges Group's centralized procurement of photovoltaic modules for photovoltaic projects in 2023 (two photovoltaic projects in Hami, Xinjiang) announced the results of winning the bid. The first
successful bidder: Chint New Energy Technology Co., Ltd., with a bid price of 2.02 billion yuan and a price per watt of 0.943 yuan;
The second successful bidder: Tongwei Solar Energy (Hefei) Co., Ltd., with a bid price of 2.05 billion yuan and a price of 0.959 yuan per watt;
The third successful bidder: Yidao New Energy Technology Co., Ltd., with a bid price of 2.06 billion yuan and 0.963 yuan per watt;
The fourth bid winner: Trina Solar Co., Ltd., with a bid price of 21.2 yuan and 0.992 yuan per watt.
According to the tender announcement issued by Three Gorges Energy on November 3, the total capacity of the tender is estimated to be about 2141.1549 MWp. The bidding scope covers N-type 575 Wp and above monocrystalline double-sided double-glass photovoltaic modules and their ancillary equipment required for the 1 million kilowatt "photothermal + photovoltaic" integrated energy demonstration project of Three Gorges Energy in Hami, Xinjiang and the 1 million kilowatt photovoltaic project of Three Gorges Energy in Beiting, Jimsar County, Xinjiang.
The bidding documents stipulate that the first winning bidder, the second winning bidder, the third winning bidder and the fourth winning bidder shall be allocated according to 40%, 20%, 20% and 20% of the total capacity of the project in principle.