local time, Texas state government documents showed that Tesla, a subsidiary of Musk, planned to build an ultra-high purity polysilicon manufacturing plant.
The plant is planned to be located in Nueces County, Texas, with an estimated total investment of about $3.1 billion (equivalent to about 20.7 billion yuan) . The equipment list includes trichlorosilane synthesis unit, chlorosilane distillation and purification production line, silicon tetrachloride recycling system and Siemens chemical vapor deposition reactor. The project is
currently applying for a property tax credit in Texas. According to local media, Tesla is also evaluating the location and preferential policies in other areas. At the beginning of July
this year, it was reported that Musk wanted to lay out the production capacity of silicon materials, and had finalized the purchase contract of 400000 tons of polysilicon equipment to two Chinese enterprises, Japanese-funded Shanghai Sensong Chemical Complete Equipment Co., Ltd. and Chinese-funded Xi'an Hualu (Hualu Engineering Technology Co., Ltd.).
But since then, the three companies have not made an official public response to the above polysilicon equipment orders.
However, based on recent news, it is certain that Tesla is accelerating the 100GW photovoltaic capacity construction plan previously announced by Musk.
Earlier, on November 9, Tesla's solar manufacturing plant in Ford Bend County, Texas, had been started and earthworks were under way. On the same day, Tesla CEO Elon Musk publicly forwarded the news on social media with the caption "Project Crystal Sun" (Chinese literal translation: Crystal Sun Project). According to
public data, Project Crystal Sun is Tesla's vertically integrated photovoltaic manufacturing plant in Texas, with a total investment of $10.1 billion, covering silicon ingots, wafers, batteries and components. It is planned to complete construction in 2028 and put into commercial operation in the first quarter of 2029.
浙公网安备33010802003254号