On May 29, the EPC tender announcement for the 150 MW distributed photovoltaic corridor power generation project (Phase I) in Nansha District, Guangzhou, Guangdong was issued, and the tenderer was Guangzhou Nansha Zhongzhou Jianxin New Energy Technology Co., Ltd .
The project plans to install distributed photovoltaic panels on both sides of some rural collective public roads with cement pavement in about 128 administrative villages within the jurisdiction of Nansha District, Guangzhou , to form corridors and provide stable power. The project adopts the scheme of block power generation and centralized grid connection, with a total DC installed capacity of 150MW .

This tender requires the successful bidder to contract the whole process of survey, design, procurement, construction, installation and commissioning of the construction project in accordance with the contract, including but not limited to the development of preliminary formalities, all survey and design work of the project, procurement, transportation and storage of all equipment and materials. Consortium bidding is accepted
in this tender . In case of consortium bidding, there shall be no more than 3 members of the consortium, and the leader shall be the construction enterprise; each party of the consortium shall sign a consortium agreement to clarify the division of responsibilities of each party; each party of the consortium shall not bid in its own name or participate in other consortium bidding. The time for
obtaining the bidding documents is from 9:00 on May 29, 2026 to 17:30 on June 4, 2026 (Beijing time, 9: 00-11: 30, 14: 30-17: 30). The bid
closing/opening time is 9:00 on June 18, 2026.
浙公网安备33010802003254号