Project Name: Weifang-Yiyuan Section K0 + 000-K50 + 040 of Weifang-Zoucheng Expressway Project
Project Overview: The total length of the project route is 50.04 kilometers, all of which are newly built. The standard construction of two-way four-lane expressway is adopted, and the design speed is 120 kilometers per hour. The integral subgrade is 27.0m wide and the separated subgrade is 13.25m wide. The whole line is provided with 4 interchanges (including 2 hub interchanges and 2 general interchanges), 2 service areas, 1 super large bridge of 1,129 meters, 16 large bridges of 4,371 meters, 7 medium bridges of 628.04 meters, 97 culverts, 15 separated interchanges, 22 bridge passages, 53 culvert passages and 21 overpasses.
Bidding scope: subgrade works, pavement works, bridge and culvert works, crossing works (excluding rail-related works), drainage works, protection works, traffic safety facilities works, greening and environmental protection works (excluding greening of functional areas), embedded pipeline works, temporary works, three-change works, toll Plaza and earthwork of each functional area included in the main line works. Construction preparation stage, construction stage, handover acceptance stage and defect liability period stage of site roads and other works.
Bid winning information:
First place: Shandong Highway and Bridge Construction Group Co., Ltd.
Bid winning amount (RMB): 3399825633.00
Second place: Ningxia Highway and Bridge Construction Co., Ltd
. Bid winning amount (RMB): 3 401129013.00
No.3: Anhui Construction Engineering Highway and Bridge Construction Group Co., Ltd.
Bid amount (RMB): 3373509678. 17
Project name: Weifang-Zoucheng Expressway Changle Liaison Line Construction
Project Overview: The total length of the project route is 22.990km, all of which are new sections. It is constructed according to the standard of two-way four-lane expressway, with a design speed of 120km/H and an integral subgrade width of 27.0m. The whole line is provided with 3 interchanges (including 2 hub interchanges and 1 general interchange), 4 large bridges of 1019m, 3 medium bridges of 233.04m, 38 culverts, 6 separated interchanges, 12 bridge-type passages, 30 culvert-type passages and 7 overpasses.
Bidding scope: subgrade works, pavement works, bridge and culvert works, crossing works (excluding rail-related works), drainage works, protection works, traffic safety facilities works, greening and environmental protection works (excluding greening of functional areas), embedded pipeline works, temporary works, three-change works, toll Plaza and earthwork of each functional area included in the main line works. Construction preparation stage, construction stage, handover acceptance stage and defect liability period stage of site roads and other works.
Bid section No.: WZLLSG-1, starting chainage: K0 + 000, ending chainage: K22 + 989.806, length of bid section: 22.990 KM.
Bid winning information:
First place: Shandong Road & Bridge Group Co., Ltd.
Bid price (RMB): 1436376749.00
Second place: Shandong High Speed Engineering Construction Group Co., Ltd.
Bid price (RMB ): 1437674446.00
No.3: China Construction Eighth Engineering Bureau Co., Ltd.
Bid Price (RMB): 1435225555.00