Project name: Fujian-Taiwan Economic and Trade Sustainable Development Industrial Park and Supporting Infrastructure Project (Phase I) Construction and Operation Integration
Tenderee: Fuzhou Urban and Rural Construction General Group Co., Ltd.
Construction Scale: The maximum bidding price of this project is 87006017 93 yuan. This project includes the following contents:
(1) Municipal roads and supporting facilities. Including the supporting facilities around Jinshan Industrial Park, the supporting facilities around Fuxing Economic Development Zone, the supporting facilities around Cangshan Functional Zone, the supporting facilities around Fuzhou Software Park, the fast communication channel around the industrial park, the supporting facilities around the May 4th North Kechuang Industrial Park, the supporting facilities around the industrial park along the industrial road, and the upgrading of the infrastructure around the industrial park; Parking lot and charging pile facilities, including parking lot built in the park, charging pile set in the space under the bridge, parking space in the road and parking lot; advertising facilities and intelligent facilities, including new large advertising light boxes on the roads in the area, advertising space on the light poles on the roads in the area and new intelligent light poles on some roads in the area; Park supporting activity facilities and night economy, including park activity facilities, park ecological rest management facilities.
(2) The project of South Lake Campus of Gezhi Middle School has a total land area of 91323. 03 square meters and a total building area of 148470, of which the above-ground building area is 114769. 76 square meters and the underground building area is 33700. The building density is 35% and the green space rate is 35%. Plot ratio 1. The main construction contents include: new administrative building, aesthetic education complex building, teaching building, laboratory building, gymnasium, student dormitory, canteen, guard room, corridor, outdoor stairs, basement, supporting outdoor sports venues and outdoor ancillary facilities, as well as reinforcement and renovation of historical buildings, transplantation and protection of listed ancient trees, etc.
Bid winning information:
Bid winner: China Construction Fourth Engineering Bureau Construction Development Co., Ltd.
China Railway 22 Bureau Group Co., Ltd.
China Construction Infrastructure Co., Ltd.
Fujian First Construction Group Co., Ltd.
China Municipal Administration Bid Price of Northwest Engineering Design & Research Institute Co., Ltd.
(CNY): 8203299708
Project Name: Construction of "the Belt and Road" Import and Export Commodity Distribution Center (Sichuan) Headquarters Project/Bid Section Bid Results Announcement
Project Overview: "the Belt and Road" Import and Export The Project of Product Distribution Center (Sichuan) Headquarters was officially launched on April 30, 2025 in Fawu Island, Tianfu New District, Sichuan, with a total investment of about RMB 1.8 billion, an area of about 68 mu (about 45,000 square meters) and a total construction area of about 210,000 square meters. It is planned to be completed and put into operation in February 2028. The project is positioned as a dual-core development of "Global Business Headquarters" and "International Consumption Center", focusing on "the Belt and Road" international trade, intelligent logistics and other businesses, aiming to build a major service industry platform for high-level opening up in Sichuan Province.
Bid winning information:
Bid winning company: China Construction Eighth Engineering Division Co., Ltd.
Sichuan Port and Channel Construction Engineering Co., Ltd.
China Construction Third Engineering Bureau Group Co., Ltd.
Bid winning amount: 120271.
Bid Winning Information:
Bid Winning Company: China Construction Eighth Engineering Bureau Co., Ltd.
Bid Winning Amount: 87776 RMB 0.23 million
Project Name: Phase I Construction Project of the New Campus of Hebei Medical University (excluding the scientific research laboratory building, student dormitories,
Project overview: The first phase construction project of the new campus of Hebei Medical University (excluding the scientific research laboratory building, student dormitory and teaching building) mainly includes the construction of the library, public classroom building (C, D) and public teaching building (A, B) in the public teaching area; In the teaching area of the college, there are the teachers' office building (about 6,800 square meters, 4 floors), the administration building (about 11400 square meters, 5 floors) and the auditorium (about 3,600 square meters, 3 floors, 1000 seats); the supporting facilities cover the logistics and ancillary rooms, canteens, corridors, roads, squares, greening, water supply and drainage, electricity, heat, fire protection and other pipe network projects; In addition, management rooms, teacher-student activity rooms, teaching display rooms and related outdoor infrastructure are planned, with a total floor area of about 268810 square meters, including about 241830 square meters above ground and about 26980 square meters underground (including 20185 square meters of civil air defense projects). The total investment of the project is about 2.
Bid Winning Information:
Bid Winning Company: China Construction First Bureau (Group) Co., Ltd.
Bid Winning Amount: 54792 RMB 0.32 million
Project Name: General Contracting of Construction of New Campus of Hefei Sports School (Bid Section I) 0 HTML0U NK28 Tenderee: Hefei Urban Construction Investment Holding Co., Ltd. 0 HTML0 UNK2 9 Source of funds: Local special bonds, municipal finance and municipal share of sports lottery public welfare fund 0 HTML0 UNK3 0 Project contribution ratio: 100% 0 HTML0 UNK3 1 Construction site: Higher Education Base Block, Xinzhan High-tech Industrial Development Zone, Hefei City. Northeastern corner of the intersection of Xiangshan Road and Huaihai Avenue 0 HTML 0 UNK3 2 Estimated contract price: RMB 10,000 91017 0 HTML 0 UNK3 3 Planned construction period: 730 calendar days (730 calendar days refers to the completion acceptance and filing of the project. 0 HTML0 17594 4 Bidding scope: The total construction area of the first bid section is about 124055, of which the above-ground construction area is 106461.03 ㎡ and the underground construction area is UNK3.93 ㎡. The building area of the venue area is about 66122. This project will build a new teaching complex building (main body height is 49.2m), a canteen logistics complex building, a shooting comprehensive training hall and shooting lanes (the above-ground building area is 38308. 70 ㎡), a multi-functional training hall (the roof structure span of the hall is 44.1m × 90.0m, The longest span is 44. Civil engineering, installation, decoration, fire protection, civil air defense, outdoor, water supply, gas (included in the provisional estimate), power supply and distribution works within the scope of drawings and lists are within the scope of this tender, unless the tenderee specifies that they are not within the scope of the tender. 0 HTML0 UNK3 5 Bid winning information: 0 HTML0 UNK3 6 Bid winner: Anhui Shuian Construction Group Co., Ltd. 0 HTML0 UNK3 7 China Construction First Bureau (Group) Co., Ltd. 0 HTML0 UNK3 8 Bid price (RMB): 800794932. The total building area is about 60000 square meters, with document storage area, business processing area, cultural exhibition area and other functional areas, forming a full-chain reserve system covering paper, audio-visual and digital resources.
浙公网安备33010802003254号