project with
an annual output of 150,000 tons of recycled zinc castings is located in the development zone of Neihuang County, in the plot enclosed by Tao'er Road, Cidu Avenue, Cilu Road and Cilu Road.
Project overview: The project covers an area of about 877 mu, with a construction area of about 210,000 square meters. It is mainly a secondary zinc production project.
Construction content: preparation and granulation workshop, volatilization kiln workshop, filtration workshop, zinc metal leaching workshop, extraction workshop, electrolysis workshop, casting workshop; other supporting facilities such as environmental protection, water supply and drainage, pipe network, heating and ventilation, power supply and distribution, fire protection, safety, transportation, etc.; office building and living facilities, some factory buildings and ancillary facilities.
Project budget amount: Information
on winning the bid with a 290145 of about RMB 6,600:
First place: MCC17 Group Co., Ltd. Leader
Member 1: Changsha Design and Research Institute of Nonferrous Metallurgy Co., Ltd.
Member 2: Anyang Dadi Exploration Engineering Co., Ltd.
Bid Price: 2894960203.40 yuan
Second Place: China Construction Eighth Engineering Division Co., Ltd. Leader
Member 1: China Nonferrous Metals Industry Kunming Survey and Design Institute Co., Ltd
. Bid Price: 2896377686.70 RMB
Third Place: Shanghai Baoye Group Co., Ltd. Leader
Member I: Henan Hengtai Geotechnical Engineering Co., Ltd
. Bid Price: 2897239960 RMB.34
浙公网安备33010802003254号