Guangdong Huadian Foshan Gaoming District Fanzhou Tangnan Community 150MW Fishery Complementary Photovoltaic Power Generation Project 10MW-10MWh Energy Storage System Construction Project EPC General

2023-09-12 09:31:45

Guangdong Huadian Foshan Gaoming District Fanzhou Tangnan Community 150MW Fishery Complementary Photovoltaic Power Generation Project 10MW-10MWh Energy Storage System Construction Project EPC General Contracting Project has been approved, the tenderer is Guangdong Huadian Gaoming New Energy Co., Ltd., and the project funds are self-owned funds and bank loans. This project has met the bidding conditions and is now open for bidding.

(Bidding No.: CHDTDZ041/18-ZB-042)

Bidding Conditions

Guangdong Huadian Foshan Gaoming District Fanzhou Tangnan Community 150MW Fishery and Photovoltaic Complementary Project

Two、 Project Scale and Bidding Scope

2.1 Bidding and Procurement Project Address: Hecheng Street

, Gaoming District, Foshan City, Guangdong Province 2.2.3 Bidding and Procurement Project Duration: 3 months

2.4 The bidding scope

is divided into one bidding section. Specifically:

III." Bidder Qualification Requirements

[Huadian Foshan Gaoming Fanzhou Project Energy Storage System Construction Project]

1. The bidder is an independent enterprise legal person or other organization legally registered within the territory of the People's Republic of China, with independent civil liability capacity. 2. The bidder has the right

to conclude the contract independently. The bidder has not been ordered to suspend production, business or enter bankruptcy proceedings.

3. The bidder is not in the penalty period

of prohibition of bidding confirmed by the administrative department or the relevant documents of China Huadian Group Co., Ltd. 4. The person in charge of the unit is the same person or different units with holding or management relationship. They shall not participate in bidding for the same bid section or for the same tender project

that is not divided into bid sections. 5. Bidders shall not be included in the list of serious illegal and dishonest enterprises in the national enterprise credit information publicity system (https://www.gsxt.gov.cn) by the market supervision and administration organ (which has not been lifted during the bid evaluation period).

6. Bidders shall not be included in the "list of discredited executives" by the "Credit China" website (www.creditchina.gov.cn) (which has not been lifted during the bid evaluation period).

7. The bidder shall not be included in the "blacklist" of joint punishment for safety production dishonesty by the State Emergency Management Department (www.mem.gov.cn) (which has not been lifted during the bid evaluation period)

8.9.10

.

11.

IV. Acquisition

of bidding documents 4.4. Potential bidders who have not registered and applied for platform services are invited to visit the e-commerce platform of Huadian Group (www. Chdtp. National legal working days (09: 00-17: 30) Customer service consultation telephone: 010-62228787 -1, Telephone on duty for non-working days (09: 00-17: 00): 18601069326. Step

2: Register online. Log in to the e-commerce platform of Huadian Group (www. Chdtp.

) Step 3: Bid purchase. Log in to the business system, click the menu "E-Bidding > Participating Projects", check the project, and click "Tender Purchase". After the online payment is completed, the download permission of the bidding documents will be automatically opened, and the bidder will download the tender by himself. Except that the tenderee terminates the procurement of this bidding project voluntarily, the bidding fee is not refundable after sale; the bidder is requested to open the online bank payment function in advance, and it is recommended to complete the online payment (CFCA) through the enterprise bank account; Potential bidders who have paid the bidding fee do not need to pay the bidding fee again when participating in the subsequent bidding activities of this bidding project, but they need to initiate the payment operation, and the platform will automatically complete the exemption of the bidding fee and the opening of the bidding download permission. Step

4: Apply for a mobile digital certificate. After installing the mobile digital certificate APP (Huadian E-Shield Enterprise Edition), please apply for a digital certificate according to the "Mobile Digital Certificate Operation Guide". In the process of encrypting and uploading bidding documents, submitting bidding queries, signing in for bid opening, and replying to bid evaluation queries, you must scan code and sign, otherwise you cannot complete the relevant operations. (APP download path: For mobile terminal APP of Android system, you need to enter "Service Center"-data download-click "Huadian E-Shield Enterprise Version APP (Android version)"; for mobile terminal APP of IOS system, you need to search "Huadian E-Shield Enterprise Version" in the Apple App Store to download and install. Mobile Digital Certificate Operation Guide Download Path: Platform Home "Service Zone" or enter the "Service Center"-Operation Guide section. Step

5: Download the bidding document. Log in to the business system, click the menu "E-Bidding > Participating Projects > Bidding Business Management > Business Homepage", and download the bidding documents and clarification documents. Before downloading the bidding documents, please fill in the billing information in the "Maintain Billing Information" menu. Step

6: Download the offline bidding client. Log in to the business system, click the menu "E-Bidding > Participating Projects > Bidding Business Management > Bidding Client Download", and download the bidding client, operation manual and other related documents. In order to avoid affecting the bidding, the bidder shall download the bidding client and handle the mobile digital certificate in time after the successful purchase of the bidding document, and complete the bidding test 2 working days before the bidding deadline (the bidding document can be withdrawn after the successful bidding), so as to ensure the normal bidding through the bidding client software. Step

7: The bid bond can be paid by telegraphic transfer or bid bond insurance (insured: Huadian Tendering Co., Ltd.). In addition to the above forms, other forms of submission of bid bond will not be accepted. The bid bond submitted

in the form of bid bond insurance can be purchased by logging in the business system of Huadian Group's e-commerce platform — electronic bidding menu — participating projects — business homepage — bond information (currently, the system only accepts bid bond insurance purchased in this way). The insurance period of the bid bond insurance shall not be less than validity period of the bid.

Insurance and policy invoice matters contact Huaxin Insurance Company, consultation telephone: 010-83568910, 18710239654.

Each bidder must participate in the supplier management and evaluation activities of Huadian Group and become a member of the supplier network of Huadian Group, and non-network members will not be able to participate in the bidding; Bidders are invited to visit the e-commerce platform of Huadian Group (www. Chdtp)

. V. Submission

of Bidding Documents 5.5.2 Submission Method: The electronic bidding documents shall be submitted to the e-commerce platform of Huadian Corporation through the bidding client (www. Chdtp.

VI. Time and place

of bid opening 6.6.6

. Centralized decryption shall be conducted on the e-commerce platform of Huadian Corporation after the time of bid opening. The submission process shall be recorded for future reference.

VII. Others

None.

8. If

bidders or other interested parties have objections to the contents of the announcement of this tender project, please raise them during the announcement period. This bidding project only accepts the objections raised through the complaint and objection system of Huadian Group's e-commerce platform, and informs the processing dynamics through the platform. The method is as follows:

at the lower right corner of the home page of the e-commerce platform of Huadian Corporation → complete login or identity verification according to the prompt → select the type (bidding objection) → select the associated project → select the stage → upload the supporting file → maintain the information of the proposer.

at the lower right corner of the home page of the e-commerce platform of Huadian Corporation → complete the login or authentication according to the prompt → select the type → select the associated project → select the stage → upload the supporting file → maintain the information of the proposer.

Ten、 Contact information

Tenderee: Guangdong Huadian Gaoming New Energy Co., Ltd.

Contact person: Kong Dezhu

Telephone: 17722781205

E-mail: 838050163@qq.com

Tendering Agency: Huadian Tendering Co., Ltd.

Address: No.

2, Xuanwumennei Street, Xicheng District, Beijing Contact Person: Zhou Jinglei

Tel: 010-83565837

E-mail: zhoujinglei@chd.com.cn

Department E-mail: zhaobiaoyibu@chd.com.

All can be viewed after purchase
Correlation

On October 25, the tender announcement for EPC general contracting of two grid-side independent energy storage projects in Laiwu District, Jinan, Shandong Province was issued simultaneously, with a total scale of 600 MW/1200 MWh and a total investment of 1.44 billion yuan.

2026-10-27 16:50:07

Recently, Tian Eye Check industrial and commercial information shows that Master Kang (Chongqing) Convenient Food Co., Ltd. has undergone industrial and commercial changes, including new power generation business, transmission business, power supply (distribution) business, and photovoltaic power generation equipment leasing.

2026-10-27 16:06:46

Shanshui Group publicly inquired about the price comparison of solid waste transportation projects such as fly ash from 2026.10 to 2027.10 of Dongming and other five companies, requiring bidders to have qualifications, transportation capacity, credit and new energy vehicles.

2026-10-26 19:57:03

On October 24, Shanxi Electric Power Co., Ltd. of State Power Investment Group issued a tender for EPC general contracting project of Longjiexing Xiangfen 200MW (Phase I 100MW) photovoltaic power station project (including collector lines). The project unit is Shanxi Longjiexing Energy Investment Co., Ltd.

2026-10-26 18:07:18

On October 24, Jiangsu Xiyuan Group announced the successful candidates for the 500 MW/2 GWh independent energy storage project in Hainan, Qinghai.

2026-10-26 15:23:11

On October 21, Anhui Jianghuai Automobile Group Co., Ltd. Zunjie Super Factory Distributed Photovoltaic Power Generation and Energy Storage Construction Project Photovoltaic Power Station EPC Project (second) bidding results were announced.

2026-10-26 10:49:41

Recently, the Department of Ecology and Environment of Guangdong Province issued the Reply and Announcement of the Department of Ecology and Environment of Guangdong Province on the Eco-environmental Impact Report of the Energy-saving and Environmental Protection Technical Reform Project of Huizhou Tapai Cement Co., Ltd. The project does not change the main equipment of the cement kiln, but improves the production capacity of cement clinker through partial transformation, replacement of auxiliary equipment and energy-saving and environmental protection transformation. After the implementation of the project, the production capacity of the two cement clinker production lines will be 2 × 5,333 tons/day, with an annual output of 300 days and an annual output of 2 × 1,599,900 tons of cement clinker; the production capacity of the cement grinding system will be increased to 4.2 million tons/year.

2026-10-26 10:48:29

The unit price of Anhui Electric Power Construction No.2 Engineering Co., Ltd. of China Energy Engineering Group is about 2.77 yuan/W.

2026-10-26 09:18:55

On October 21, the tender announcement for the general contracting of the centralized photovoltaic power generation project (secondary) in Wusu City, Tacheng District, Xinjiang was issued.

2026-10-24 14:30:10

It covers energy storage area, booster station area, auxiliary facilities area, administrative service area and fire fighting facilities.

2026-10-23 17:46:26

This week, a total of 6 enterprises adjusted their prices, of which 3 manufacturers partially increased their prices and 4 manufacturers partially lowered their prices.

2026-10-23 15:39:47

On October 21, due to the change of bidding content, the EPC general contract of 200MW household distributed photovoltaic project in Ningxia was terminated.

2026-10-23 10:30:31

Shanshui Group carried out public inquiry and procurement for desulfurization gypsum and stone chips transportation projects of Gongyuan, Liaoyang and Yongzhongsheng from October to December 2026, requiring bidders to have qualifications, transportation capacity, reputation and compliance operation capabilities.

2026-10-22 19:56:53

Linfen Company of Shanshui Group made an open inquiry on price comparison for the technical service of 1538-1566m geological detailed survey, sampling and testing. The bidder is required to have the qualification, performance ability and good credit. The deadline for online bidding is October 27, 2026.

2026-10-22 19:56:33

Shanshui Group invited public bidding for the procurement of ceramic hanging pieces for preheaters of four subsidiaries, with a total of 7 sets, about 251.58 ㎡, and implemented pre-qualification, second round of quotation, bid division, all-inclusive price including tax and installation costs.

2026-10-22 19:56:22

Recently, the Review Opinions of the Administrative Examination and Approval Bureau of Fuchuan Yao Autonomous County of Guangxi on the Energy-saving Report (Change) of the Aggregate Project with an Annual Output of 2 Million Tons of Huarun Cement (Fuchuan) Co., Ltd. was issued, and the Energy-saving Report of the above-mentioned Aggregate Project of Huarun Cement was approved in principle.

2026-10-22 14:28:57

On October 21, due to the change of bidding content, the EPC general contract of 200MW household distributed photovoltaic project in Ningxia was terminated.

2026-10-22 11:23:24

On October 21, Guoneng Chongqing Wanzhou Longsha (230MW) Photovoltaic Project, a new energy company of Chongqing Company, invited public bidding for EPC general contracting.

2026-10-22 10:07:00

Recently, the 200MW/800MWh independent new energy storage EPC project in Wusu City, Xinjiang issued a tender termination announcement. The original bid opening time of the project was October 21. The reason for the termination was that the project had undergone major changes.

2026-10-21 16:45:16

On October 20, Fengqing County, Lincang City, Yunnan Province, issued a competitive consultation announcement on the first batch of centralized photovoltaic power generation project investors in 2026.

2026-10-21 14:00:42

According to the incomplete statistics of the digital new energy DataBM. Com, from October 12, 2026 to October 18, 2026, there are 36 EPC general contracting projects for photovoltaic power plants in China, as well as DB general contracting, optical storage integrated general contracting and other general contracting projects, involving a project scale of 2.311 GW, with a total bid amount of 7.255 billion yuan. ......

2026-10-21 13:31:01

On October 16, the 72 MW photovoltaic self-contained power supply project in Laos Vientiane Saiseta Comprehensive Development Zone officially started construction.

2026-10-21 13:26:43

On the evening of October 20, Ningxia Building Materials (600449) disclosed the announcement of the progress of share repurchase. The announcement shows that as of October 19, 2026, the company has repurchased 4.8333 million shares through centralized bidding, accounting for 1.0108% of the company's total equity, with the highest price of 13.18 yuan per share and the lowest price of 11.76 yuan per share. The total amount of funds paid is RMB 59,009,400 (excluding transaction costs).

2026-10-21 09:49:49

Shanshui Group invites public bidding for the general contracting project of ultra-low emission construction of Wuxiang Company, requiring bidders to have corresponding qualifications, performance and credit conditions, and adopting the mode of pre-qualification, second round quotation and fixed comprehensive unit price contracting.

2026-10-20 19:57:53

Huludao Company of Shanshui Group carried out public inquiry and comparison procurement for powder fluorite powder and coal sand from October to December 2026, adopting post-qualification, one-time quotation and online bidding, emphasizing supplier qualification, performance ability and compliance credit requirements.

2026-10-20 19:56:49

The People's Court of Ningguo City, Anhui Province, will hold a public auction from 10:00 on November 16, 2026 to 10:00 on November 17, 2026 (except for delay). The auction target is the overall auction of the flooded photovoltaic steel structure plant, solar panels, photovoltaic power generation supporting machinery and equipment and 34 power supply towers of Anhui Tianju Solar Photovoltaic Power Generation Co., Ltd. in Dawu, Meilin Town, Ningguo City.

2026-10-20 18:09:43

On October 16, Jiangxi Ganzhou Nankang District Light Storage and Charging Clean Energy Integration Construction Project was tendered, with a construction and installation cost of about 474 million yuan. The tenderer, Ganzhou Nankang District Hongbo Commerce and Trade Co., Ltd., is a state-owned enterprise.

2026-10-20 11:05:21

From December 2019 to October 2023, Wang Mou and Sheng Mou, Li Mou, Lei Mou and others set up a construction engineering limited company in partnership to win the bid by organizing more than 60 companies nationwide to bid and bribe bid evaluation experts, and then package and sell or subcontract irregularly to intercept project funds at different levels for profit. The total amount of winning projects is as high as 1.459 billion yuan.

2026-10-20 10:12:23

On October 19, Zhejiang Huadian 400MW household distributed photovoltaic power generation project (the fourth batch) EPC and five-year operation and maintenance general contracting bidding project winning candidates were announced.

2026-10-20 09:44:36

On October 16, Hebei Huadian Baoding Tangxian 90 MW Centralized Photovoltaic Power Generation Project EPC General Contracting Tender Announcement was issued.

2026-10-19 09:52:32

According to the incomplete statistics of digital new energy DataBM. Com, the capacity of photovoltaic module collection and calibration and entry projects announced in two weeks (10.3-10.16) is about 2.81 GW, which is 35.4% lower than that of the previous period (9.19-10.2) 4.35 GW; At the same time, the total amount of bidding projects for photovoltaic modules is about 6.60 GW, which is more than 14 times higher than 0.41 GW in the previous period.

2026-10-19 09:12:09

According to the incomplete statistics of the digital new energy DataBM. Com, from October 5, 2026 to October 11, 2026, there are 21 EPC general contracting projects for photovoltaic power plants in China, as well as DB general contracting, optical storage integrated general contracting and other general contracting projects, involving a project scale of 0.693 GW, with a total winning amount of 1.711 billion yuan. ......

2026-10-16 16:32:30

On October 13, Guodian Electric Power Inner Mongolia Comprehensive Energy Guodian Electric Power "Mengdian into Anhui" New Energy Base Overall Implementation Plan and Feasibility Study Report Compilation Service Public Bidding.

2026-10-16 16:21:29

According to the incomplete statistics of the digital new energy DataBM. Com, from September 28, 2026 to October 4, 2026, there are 32 EPC general contracting projects for photovoltaic power plants in China, as well as DB general contracting, optical storage integrated general contracting and other general contracting projects, involving a project scale of 1.913 GW, with a total winning amount of 4.775 billion yuan. ......

2026-10-16 16:08:10

A total of 6 manufacturers on the component side lowered their quotations by 0.01-0.03 yuan/W.

2026-10-16 16:07:59

On October 13, Guodian Electric Power Inner Mongolia Comprehensive Energy Guodian Electric Power "Mengdian into Anhui" New Energy Base Overall Implementation Plan and Feasibility Study Report Compilation Service Public Bidding.

2026-10-16 11:37:28

The People's Court of Xiji County, Guyuan City, Ningxia Hui Autonomous Region will publicly auction 19 items of photovoltaic power station equipment in Yumu Village, Piancheng Town, Xiji County, Ningxia from 10:00 on November 1 to 10:00 on November 2.

2026-10-16 10:36:53

On October 13, Inner Mongolia Lvneng Chuangyan Qingshuihe County 600 MW/2400 MWh Independent Energy Storage Project EPC started bidding, the tenderer is Lvneng Chuangyan Investment and Development (Guangxi) Co., Ltd., the total investment of the project is about 2.4 billion yuan, equivalent to EPC unit price of about 1 yuan/Wh.

2026-10-15 16:48:18

The SCR treatment system of 2500t/d clinker cement production line kiln tail is constructed in this project. The original SNCR denitration process has low denitration efficiency and can not meet the ultra-low emission requirements. Now it is planned to transform the original supporting SNCR denitrification system into a high-temperature and high-dust SNCR + SCR denitrification system to realize the coordinated treatment of NOx in flue gas.

2026-10-15 14:06:11

On October 12, Xinjiang Changji Hutubi 400MW Photovoltaic Project EPC General Contracting Project (Bid Section II: 250MW Photovoltaic) was tendered.

2026-10-14 16:30:54

Sudden changes in the billion-level energy storage project in Jimotai District, Qingdao, Shandong! On October 11, the local trading platform issued a notice of bid rejection, and the EPC project of the second phase of energy storage in the urban distribution network with a total investment of more than 1 billion yuan was terminated.

2026-10-14 11:07:43

On October 14, Longyuan Power issued a tender announcement for the first batch of photovoltaic module equipment framework procurement public bidding projects in 2026.

2026-10-14 10:42:57

Shanshui Group invites public bidding for the project of improving the network security of power monitoring system of Aqi Company, requiring bidders to have corresponding qualifications, performance and safe construction capabilities, and to implement the total price and the second round of quotation.

2026-10-13 19:57:14

Weishan Company of Shanshui Group made a public inquiry on the planning of mountain forests and grasslands and the optimization and adjustment of protected areas for survey and delimitation projects, requiring compliance with qualifications, achievement standards and government review and filing.

2026-10-13 19:57:02

Xingye Conch entrusts Haihui Company to bid publicly for the concrete transportation and pumping project. The bid is about 250,000 cubic meters for transportation and 170,000 cubic meters for pumping. The bidder is required to have the qualification, vehicle equipment, safety insurance and platform operation capability. The contract period is up to April 2028.

2026-10-13 17:29:08

The photovoltaic industry held another "closed-door meeting", and this time it also finalized the bottom line of the sales price of silicon materials and components! On October 12, media reported that Tongwei, Xiexin and other head photovoltaic enterprises held a closed-door meeting in Hangzhou on the 11th.

2026-10-13 11:33:54

On October 10, CGN New Energy Ningxia Lingwu 500 MW/2 GWh grid-side shared energy storage power station EPC tender, the tenderer is CGN New Energy Lingwu Co., Ltd., plans to start construction on November 20, 2026, and complete all grid-connected power generation by May 10, 2027.

2026-10-13 11:13:24

BBMG Jidong Cement Group Co., Ltd. announced the issuance of the second issue of medium-term notes in 2026. The actual total amount of this issue of bonds is 1 billion yuan, the term is 3 years, the interest rate is 1.63%, the compliance subscription amount is 2.8 billion yuan, and the effective subscription amount is 1.1 billion yuan.