On December 16, the successful candidates for the 1.6 million kilowatt photovoltaic power generation project (the first bid section) in Tori County, Tacheng, Xinjiang were announced.
2025-12-17
The market presents a situation of "light transaction and rising quotation".
2025-12-17
Since the 17th, some major manufacturers in Nanjing, Zhenjiang and other places in Jiangsu have lowered the price of cement by 10-20 yuan/ton.
2025-12-17
On December 17, Haiyou New Material announced that the company intends to set up a company in Jintang County, Chengdu City, Sichuan Province, and build a special polymer film production project.
2025-12-17
On December 17, the Department of Industry and Information Technology of Liaoning Province issued the Announcement on the Replacement Scheme of Supplementary Capacity for the Production Line Project of Liaoning Fushan Cement Co., Ltd. with a Daily Output of 5000 Tons of Cement Clinker. The announcement period is from December 17 to December 30, 2025.
2025-12-17
On December 15, Jiangxi Provincial Department of Industry and Information Technology issued a public announcement on the capacity supplement and replacement plan for the project of Jiangxi Yadong Cement Co., Ltd. No.5 production line with a daily output of 2000 tons and No.6 production line with a daily output of 2000 tons of cement clinker. The announcement time is from December 15, 2025 to December 26, 2025.
2025-12-17
On December 15, the Office of Industry and Information Technology of Anhui Province issued a public announcement on the capacity adjustment and replacement of the cement clinker production line of Anhui Guangde Hongshan Southern Cement Co., Ltd.
2025-12-17
The PV modules required for Aba Rong'an 1150MW PV Project in the north of Plot 16 # and Plot 20 # are purchased this time. The total AC side capacity is about 434.61 MW, and the DC side capacity is 513.530 94MWp. The PV modules are N-type TopCon double-sided double-glass 640Wp/645Wp modules.
2025-12-17
On December 12, * ST Changyao announced that Yiheng Science and Technology, a subsidiary of the company, had recently stopped production. The reason is that the competitive environment of the photovoltaic industry and its own capital constraints, sustained losses, in order to avoid the expansion of losses, reduce costs and stop production.
2025-12-17
The Digital New Energy DataBM. Com was informed that on December 16, the successful candidates for the 1.6 million kilowatt photovoltaic power generation project (the first bid section) in Tori County, Tacheng, Xinjiang, were announced.
2025-12-17
On December 16, the Department of Industry and Information Technology of Guizhou Province issued a public announcement on the capacity transfer plan of the new dry process cement production line with a daily output of 2500 tons of clinker of Guizhou Qiangui Sanhe Cement Co., Ltd.
2025-12-17
On the evening of December 16, Sinoma International announced that Sui Tongbo had applied to resign as vice president of the company due to job adjustment and was engaged in special scientific and technological work after leaving office.
2025-12-17
As of December 16, more than 240 clinker lines in China have completed capacity replenishment, with a total withdrawal of 134 million tons and a replenishment of more than 87.2 million tons. This supplement has not solved the core problem, but may aggravate overcapacity and magnify the risk of market turbulence next year.
2025-12-17
On December 16, the Shaanxi Provincial Department of Industry and Information Technology announced the list of benchmarking projects for advanced intelligent factories and the first set of major technical equipment products in 2025.
2025-12-17
Jiangxi 2026 wind and solar mechanism price released, photovoltaic 0.379 yuan/degree, wind power 0.365 yuan/degree, are close to the upper limit of quotation, the remaining amount of mechanism electricity is large.
2025-12-17
Publicize the list of new energy non-distributed stock projects in our province, clarify the electricity price mechanism, standardize project management, and promote the orderly development of new energy.
2025-12-17
The meeting emphasized energy security, green transformation and scientific and technological innovation as the core, coordinated development and emission reduction, accelerated the construction of a new energy system, comprehensively promoted the construction of a strong energy country, and provided strong support for Chinese-style modernization.
2025-12-17
On the evening of December 16, China Energy Construction announced that the first phase of Songyuan Hydrogen Energy Industrial Park (Green Hydrogen Ammonia Alcohol Integration) project, the world's largest green hydrogen ammonia alcohol integration project, was officially put into operation.
2025-12-17
Recently, Fenyi Conch Cement Clinker Production Line with a daily output of 4500 tons held an ignition ceremony.
2025-12-17
The project is the first "photovoltaic + energy storage" project in Kazakhstan, the largest single installed capacity photovoltaic storage project in the country, and the first new energy project in the framework agreement on renewable energy cooperation between China and Kazakhstan after the Shanghai Cooperation Summit this year.
2025-12-17
CEMPI
102.01
+1.6 +1.59%
CONCPI
86.65
-0.03 -0.03%
CLKPI
105.00
+2.12 +2.06%
SPPI
41.98
+0.35 +0.84%
MORPI
71.83
0.00 0.00%
On October 13, the Office of Industry and Information Technology of Jiangxi Province announced that due to the revision of the policy of capacity replacement in the cement and glass industry by the Ministry of Industry and Information Technology, the Office of Industry and Information Technology of Jiangxi Province decided to abolish the Rules for the Implementation of Capacity Replacement in the Cement and Glass Industry of Jiangxi Province (Gongxin Regulation No.2024) from the date of issuance of the notice, and to abolish the "Rules for the Implementation of Capacity Replacement in the Cement and Glass Industry of Jiangxi Province". The capacity replacement of cement and glass industry in the whole province will be handled in accordance with the relevant policies of the Ministry of Industry and Information Technology in the future.