On October 28, the commencement ceremony of Wulanchabu Jingda 1500MW "Wind, Solar, Fire and Storage Integration" large-scale wind power photovoltaic base project was solemnly held in Fengzhen City, Wulanchabu City, Inner Mongolia.

The project is jointly invested and constructed by Beijing Jingneng Electric Power Co., Ltd. and Guodian Electric Power Development Co., Ltd. and is a key project of the national large-scale scenery base in Shagohuang. The total installed capacity of the project is 1.5 million kilowatts, including 1.2 million kilowatts of wind power, 300000 kilowatts of photovoltaic power and 225000 kilowatts/4 hours of supporting energy storage facilities. The generated electricity is transmitted to the Beijing-Tianjin-Hebei North Power Grid through the "Jinglong-Datong-Fangshan" 500 kilovolt channel. After
the project is completed and put into operation, it is estimated that about 2.936 billion degrees of green electricity will be delivered annually to the Beijing-Tianjin-Hebei power grid, saving about 1.0385 million tons of standard coal and reducing about 2.959 million tons of carbon dioxide.
浙公网安备33010802003254号