On October 23, the Bureau of Ecology and Environment of Dali Bai Autonomous Prefecture of Yunnan Province issued a public announcement on the acceptance of EIA documents for Yunding Village Photovoltaic Power Generation Project (re-approval).
The project is located in Yunding Village, Baishi Town, Yunlong County, with a total floor area of 157.99 H ㎡ and a total investment of 497.75 million yuan . It is a major change re-approval project.
According to the EIA document, September 27, 2022. Yunding Village Photovoltaic Power Generation Project has been approved by Dali Ecological Environment Bureau. The project only has major changes in the booster station, and the rest of the photovoltaic array, collector lines and other projects occupy the same area as the original EIA. However, the specification of photovoltaic modules has been changed from 540Wp to 680 Wp , the number of photovoltaic panels has been reduced from 275868 to 219148 , and the laying density of photovoltaic panels has been reduced; At the same time, the construction unit was changed from Huaneng Lancang River (Dali) New Energy Co., Ltd. to Huaneng Lancang River (Yunlong) New Energy Co., Ltd . The rated capacity
of Yunding Village Photovoltaic Power Station Project is 120 MW, and the actual installed capacity is 149.02 MWp. The solar cell array is planned to be developed with monocrystalline silicon photovoltaic modules , and a total of 39 photovoltaic sub-arrays are arranged. The project has started construction of 26 square arrays, has laid 74640 photovoltaic panels, has built 3110 columns, and has built 29 box transformer foundations. The inverter is not installed, and the box transformer is not installed.

浙公网安备33010802003254号