News List

On December 23, the Department of Industry and Information Technology of Yunnan Province issued a public announcement on the capacity replacement plan of the supplementary capacity project of the 5000 tons per day cement clinker production line of Xiqian Cement Co., Ltd. in Fengqing County. The public announcement period is from December 23, 2025 to January 6, 2026.

2025-12-23

On December 23, the Department of Industry and Information Technology of Yunnan Province issued a public announcement on the capacity replacement plan of Yiliang Chenshi Building Materials Co., Ltd. for the new dry cement production line with a daily output of 3000 tons of clinker. The public announcement period is from December 23, 2025 to January 6, 2026.

2025-12-23

On December 19, Premier Li Qiang of the State Council chaired the executive meeting of the State Council, focusing on the implementation of the spirit of the Central Economic Work Conference, listening to the progress report of the three-year action to tackle the root causes of production safety, deploying the comprehensive treatment of solid waste, and deliberating and adopting the Regulations on the Implementation of the Value-added Tax Law of the People's Republic of China (Draft) and the Regulations on Commercial Mediation (Draft).

2025-12-23

On December 23, the Department of Industry and Information Technology of Yunnan Province issued a public announcement on the capacity replacement plan of the supplementary capacity project of the 2833 tons per day cement clinker production line of Honghe Ziyan Cement Co., Ltd. for the period from December 23, 2025 to January 6, 2026.

2025-12-23

Since 2027, "household non-natural person distributed photovoltaic projects" will no longer be included in the scope of mechanism price bidding. Prior to this, Shandong has made it clear that industrial and commercial distributed photovoltaic is not included in the scope of mechanism price. Therefore, starting from 2027, Shandong's distributed photovoltaic projects, only natural household photovoltaic projects can participate in the mechanism price bidding.

2025-12-23

On December 22, the Department of Industry and Information Technology of Gansu Province issued the Announcement on the Replacement Scheme of Complementary Capacity of the 2 × 4.5MW Waste Heat Power Generation System Project for the 4000t/d Cement Clinker Production Line of Gansu Hengya Cement Co., Ltd.

2025-12-23

On December 22, the Department of Economy and Information Technology of Sichuan Province announced that the 6 # 3000t/d clinker line of Sichuan Esheng Cement Group Co., Ltd. was supplemented with 1666t/d production capacity, with a replacement ratio of 1.5: 1. The source of the production capacity index was the 2500t/d clinker line of Renshou People's Special Cement Co., Ltd.

2025-12-23

On December 22, the Department of Economy and Information Technology of Sichuan Province announced that Sichuan Yadong Cement Co., Ltd. 3 # 4200t/d clinker line was supplemented with 1350t/d capacity, with a replacement ratio of 1:1. The source of the capacity index was the 1350t/d capacity of 1 # 4200t/d production line in the plant area.

2025-12-23

On December 22, Huadian Xinneng announced that the board of directors had received resignation reports from directors Wu Shaohua and Chen Zhaohui. Due to work needs, Wu Shaohua resigned as director of the second board of directors and member of the strategic committee of the board of directors, and Chen Zhaohui resigned as director of the second board of directors and member of the audit committee of the board of directors.

2025-12-23

On December 18, the Zhejiang Provincial Department of Ecology and Environment issued a public announcement on the third round of feedback from the central supervision of ecological environment protection (No.18).

2025-12-23

On December 22, the Department of Economy and Information Technology of Sichuan Province announced that the 1 # 4500t/d clinker line of Sichuan Lanfeng Cement Co., Ltd. had a supplementary capacity of 1900t/d, with a replacement ratio of 1.5: 1. The source of the capacity index was the 2850t/d capacity of the 1 # 4200t/d clinker line of Sichuan Yadong Cement Co., Ltd.

2025-12-23

Actively promote the construction of photothermal power generation projects, continuously expand new scenarios for the development and utilization of photothermal power generation, and ensure the large-scale development of photothermal power generation. By 2030, the total installed capacity of solar thermal power generation will strive to reach about 15 million kilowatts, and the cost per kilowatt hour will be basically the same as that of coal power. The technology will be internationally leading and completely independent and controllable, and the industry will realize independent marketization and industrial development, becoming a new industry with international competitive advantages in the field of new energy.

2025-12-23

On December 5, the People's Government of Fengrun District of Hebei Province issued an investigation report on the "5.22" general fall accident of Tangshan Jidong Cement Tangshan Branch.

2025-12-23

Recently, the construction progress of the North Far East Cement Clinker Production Line Project with a daily output of 5000 tons in Linkou County has exceeded 80%, and it has entered the stage of equipment installation and commissioning. It is expected that the trial production will be ignited in June 2026.

2025-12-23

On December 3, the Ministry of Industry and Information Technology, the National Development and Reform Commission and the General Administration of Market Supervision jointly issued the List of Energy Efficiency "Leader" Enterprises in Key Industries in 2025.

2025-12-23

On the evening of December 22, three listed companies, Xiangyuan Wenlu (600576. Sh), Jiaotong Construction Stock (603815. Sh) and Haichang Ocean Park (02255. HK), issued heavy announcements simultaneously, disclosing that Yu Faxiang, the actual controller of the company, had been taken criminal compulsory measures by Shaoxing Public Security Bureau for suspected crimes, and related cases were under investigation.

2025-12-23

On December 22, Tianyang New Material announced that it intends to stop the business related to photovoltaic packaging film.

2025-12-23

On December 18, Suzhou Municipal Bureau of Housing and Urban-Rural Development issued the Circular on Dynamic Verification of Ready-mixed Concrete Production Enterprises in the Second Half of 2025, in which the technical director of Zhangjiagang Conch New Building Materials Co., Ltd., a subsidiary of Conch Cement, provided false social insurance certificates; there was no analysis room, and the aggregate room was shared with the cement room.

2025-12-23

After the project is put into production, it is estimated that the annual output of cement clinker will be 1.55 million tons, the annual average sales income will be 447 million yuan, the tax revenue will be 80 million yuan, and nearly 100 new jobs will be created.

2025-12-23

On December 22, Tianshan Material announced that in order to maximize the value of the existing production capacity, combined with the actual situation of the production line, the subsidiary of the company intends to transfer the production capacity index of a cement clinker production line by public listing. The total production capacity index to be listed is 4200 t/d, equivalent to 1.26 million tons, and the amount to be listed for transfer is about 99.54 million yuan.

2025-12-23

Price Statistics of Natural Sand, Machine-made Sand and Gravel (1.17-1.23)