DBM Video: Yahua Group Signs Five-year Spodumene Concentrate Purchase Agreement in Brazil

2026-03-26 16:59:52

On March 25, Yahua Group announced the signing of the Purchase and Sale Agreement with MGLIT, Brazil, and planned to continue purchasing the product within five years after the stable production of spodumene concentrate.

On March 25, Yahua Group announced the signing of the Purchase and Sale Agreement with MGLIT, Brazil, and planned to continue purchasing the product within five years after the stable production of spodumene concentrate.

According to the agreement, MGLIT is required to sell and deliver at least 120,000 dry metric tons of spodumene concentrate to Yahua Group in each contract year, and the product pricing is based on 6% lithium oxide content per dry metric ton, with a minimum price of $1,000 per dry metric ton.

Yahua Lithium Industry is the main supplier of lithium salt products in the world, and its main business includes lithium mining and lithium salt processing. Lithium salt production capacity is 130000 tons, and overseas production capacity is planned to be 60000 tons.

All can be viewed after purchase
Correlation

On March 25, Yahua Group announced the signing of the Purchase and Sale Agreement with MGLIT, Brazil, and planned to continue purchasing the product within five years after the stable production of spodumene concentrate.

2026-03-26 16:59:52

On March 25, the bidding results of the energy storage system framework procurement project of CGN New Energy in 2026 were officially announced. The procurement scale of the project reached 7.2 GWh, and the tenderer was CGN Wind Power Co., Ltd.

2026-03-26 16:55:39

Recently, China's first new energy storage AI data analysis platform was officially put into use. The platform can access different types of new energy storage devices, rely on AI autonomous learning and massive data analysis capabilities, remotely and real-time detection of equipment defects, and automatically generate operation and maintenance programs for processing.

2026-03-25 17:35:17

On March 24, the announcement of termination of EPC general contract for independent new energy storage project in Shizuishan National High-tech Zone of Ningxia was issued. This project is terminated due to major changes, and will be released at a later date after adjusting the corresponding contents.

2026-03-25 15:01:58

On March 20, Shanxi Province issued two tender announcements for energy storage projects, covering EPC and energy storage equipment, with a total scale of 460 MW/1.4 GWh.

2026-03-24 16:09:22

Recently, Xinjiang Changji Guotou issued an announcement on the termination of the procurement of energy storage system equipment for four shared energy storage projects, with a total scale of 800 MW/3.2 GWh, all due to the adjustment of the bidding plan.

2026-03-24 11:06:31

Recently, Trina Solar officially withdrew its application for the development of the 200MW/800MWh Pleystowe battery energy storage project in Queensland, Australia. It is understood that the project site near Mackay, Queensland, encountered strong opposition from the local community during the approval stage, and the government received 733 objections during the consultation period, with only three in support.

2026-03-23 17:18:53

On March 17, Atlas Sunshine Power Group announced that Atlas Energy Storage, a subsidiary of its energy storage solutions business, had signed a supply agreement with a large overseas utility company to provide battery energy storage systems for an energy storage project with a scale of about 500 MW/2,493 MWh.

2026-03-19 16:17:46

The new Wuhan hub through line project is drawn from Yunmeng East Station of Hanshi high-speed rail, with Xiaogan South Station and Hanyang Station, crossing the Yangtze River along the Third Ring Road of Wuhan City, with Baishazhou Highway and Railway Yangtze River Bridge, and connecting Wuhuang Intercity after crossing the river. The newly-built main line is 72.193 km long (the length from the junction point of Yunmeng East to the dividing point at the north end of the same line with Wuyi is 40.149 km; the length from Zoumaling Line Station (excluded) to Huangjiahu Line is 32.044 km long), and the connecting line is 8.605 km long. Among them, the main bridge of the newly-built Baishazhou Rail-cum-Road Yangtze River Bridge is 2623 meters long, and the first-and second-line railways, upper highways and synchronous construction of the rail-cum-road joint construction section on both sides of the river