On October 10, the Ecological Environment Bureau of Leshan City, Sichuan Province, issued a public announcement on the approval of the ecological environment impact assessment document of Yongxiang New Energy High Purity Silicon Pilot Project .
The content shows that Yongxiang New Energy High Purity Silicon Pilot Project is located in Wutongqiao Chemical Industry Park, Leshan City, Sichuan Province, covering an area of about 67 square meters 20666. Build a " The construction unit of this project is Sichuan Yongxiang New Energy Co., Ltd. (hereinafter referred to as "Yongxiang New Energy"). The company was announced by Tongwei 's Sichuan Yongxiang Co., Ltd. and
According to the content of the document at that time, the first phase of the above-mentioned silicon material manufacturing project will build a polysilicon production line with an annual output of 125000 tons, eventually forming a polysilicon production scale of 25000 tons per year; In the second phase, a production line of 51,000 tons of polysilicon was completed, including 50,000 tons/year of solar-grade polysilicon and 0 of electronic-grade polysilicon.
The production capacity of the above projects was increased to 121,000 tons/year through energy-saving and efficiency-increasing technological transformation. Among them, the production capacity of solar-grade polysilicon is 120000 tons per year , and that of electronic-grade polysilicon is 0.
The total investment is about 6 billion yuan , mainly for the photovoltaic industry.
However, the 2025 annual report of Tongwei shares shows that the progress of Yongxiang New Energy Phase III 120000 tons of high-purity silicon and supporting projects is currently suspended . In the
first half of this year, the operating income of Yongxiang New Energy was 64.0093 million yuan, with a net profit loss of 2.
浙公网安备33010802003254号