News List

Intel Bets on Glass Substrate: Not Easy to Bend, Suitable for Large-Size Packaged Chips

2023-06-19

By the end of the 14th Five-Year Plan, green low-carbon energy accounted for more than 75%, and there were business needs for power side energy storage, grid side energy storage and user side energy storage.

2023-06-19

It officially settled in Weihai and became the first subsidiary company of the central enterprises in the construction industry in Weihai.

2023-06-19

New Investment Enterprise China Construction Third Engineering Bureau Group (Dongguan) Investment and Construction Co., Ltd. of China Construction Third Engineering Bureau Group Co., Ltd.

2023-06-19

Researchers in the United States and Germany have developed a new 3D printing process that can produce nano-sized quartz glass products at relatively low temperatures, which is expected to print optical glass components directly on semiconductor chips.

2023-06-19

Nine concrete mixing enterprises did not have legal water intake procedures, and all the production water was privately purchased from groundwater.

2023-06-19

On June 19, the commencement ceremony of Yangxin Washi Green Building Material Phase II and Washi Mine Green Environmental Protection Material Project was held, and Yangxin Washi Mine Project with an annual output of 20 million tons of machine-made sand was started. It is reported that the 6200t/d new green intelligent clinker production line project of Queshi was successfully ignited and put into operation not long ago.

2023-06-19

On June 19, Taiwan Cement Group held the capping ceremony of the main body of the Gongliang Building Project in Hangzhou, marking a new stage in the development of Taiwan Cement Group's deep cultivation of the Chinese mainland market. Dozens of guests, including Zhou Cansen, Deputy Secretary of the Party Committee of the Zhejiang Branch of the Industrial and Commercial Bank of China, Lu Xiande, Director of the Taiwan Affairs Office of Hangzhou, and Zuo Qiang, General Manager of the First Bureau of China Construction, attended the ceremony in person.

2023-06-19

"The thermal intensity of the rotary kiln is not enough, the firing temperature is not high enough, the firepower is not concentrated, and the energy-saving effect will be reduced a lot."

2023-06-19

Generally speaking, the second round of accountability for the transfer of supervision focuses on investigating the main responsibility, supervision responsibility and leadership responsibility of leading cadres, and plays an active role in implementing the same responsibility of the Party and the government for the protection of the ecological environment and promoting the work of supervision and rectification.

2023-06-19

On June 19, China Construction released its business briefing from January to May 2023.

2023-06-19

In order to accelerate the transformation of green environmental protection, Jiangxi Building Materials Group Co., Ltd. has built a co-disposal solid waste production line project in De'an County, Jiujiang City, using the 6600t/d new dry cement clinker production line of Jiangxi De'an Wannianqing Cement Co., Ltd., with a total investment of nearly 250 million yuan.

2023-06-19

Details of recent changes in cement prices across the country (6.12 ~ 6.18)

2023-06-19

On June 19, the Department of Ecology and Environment of Shandong Province announced the results of the performance rating of key industries with heavy pollution weather in 2022.

2023-06-19

The agreed investment is about 26 billion yuan, and the project will land in Bahrain Left Banner and Arukhorqin Banner.

2023-06-19

It accounts for about 11.18% of the company's audited revenue in 2022.

2023-06-19

Methods for the entry and exit of generating units from commercial operation

2023-06-19

Change of glass production line in South China of Taibo on June 19 (ignition)

2023-06-19

According to the market data of China Cement Network, the average price of P.O42.5 bulk cement in China last week was 366.75 yuan/ton, down 1.96% from the previous month.

2023-06-19

Geely's annual output of 100,000 tons of physical polysilicon and photovoltaic industry chain project (Phase I) formally entered the construction stage

2023-06-19