News List

In order to facilitate a more intuitive and vivid understanding of the relevant provisions of the Interpretation of the Supreme People's Court on Several Issues Concerning the Application of Law in the Trial of Road Traffic Accident Damage Compensation Cases (II), the Supreme People's Court issued six typical cases of road traffic damage compensation.

2026-05-07

As the 2025 Framework Agreement will expire on 31 May 2026, it is currently expected that the transactions under the 2025 Framework Agreement will continue on a recurring basis. On 30 April 2026, Shanshui Cement Group entered into the 2026 Framework Agreement with CNBMG, Shandong Quanxing and Shandong Donghua to renew the 2025 Framework Agreement and the Annual Caps.

2026-05-07

The theme of the June 5 Environment Day 2026 is "Comprehensive Green Transformation, Building a Beautiful China Together", and the theme of the World Environment Day focuses on the urgency of climate action.

2026-05-07

On April 2, Zhanjiang Municipal Bureau of Ecology and Environment issued an administrative penalty decision, imposing a fine of 305000 yuan on Zhanjiang Yufeng Concrete Co., Ltd. for violating the Law of the People's Republic of China on the Prevention and Control of Atmospheric Pollution.

2026-05-07

On May 7, Xinlong Kaisheng Yecheng County 600000 kilowatt photovoltaic sand control project (EPC) public tender announcement was issued, and the tenderer was Xinjiang Xinlong Kaisheng New Energy Co., Ltd.

2026-05-07

On May 2, the restoration of 100 MW photovoltaic project in Danzhu Mine, Pingnan, Guangxi, contracted by China Nengjian Anhui Electric Power Construction Company II, started.

2026-05-07

On April 29, China Railway 11th Bureau Group Co., Ltd. announced the shortlisted suppliers for the framework agreement procurement of photovoltaic cables, photovoltaic brackets and photovoltaic modules in 2026-2027.

2026-05-07

According to the announcement, the design capacity of the original 5000t/d cement clinker production line of Liaoning Yinsheng Cement Group Co., Ltd. is 4000t/d, the supplementary capacity is 1000t/d, the replacement capacity is 2000t/d, and the replacement ratio is 2:1. A 2000t/d cement clinker production line of Cement Branch of Guizhou Bohong Industrial Co., Ltd. is used to replace the production capacity of this project. The production line has been shut down and is planned to be dismantled and withdrawn before November 30, 2026.

2026-05-07

In May 6th, the price of lithium carbonate broke through 200 thousand yuan/ton and reached a new stage high! UBS said that "the upward cycle of lithium industry is coming again", raising the target price to about 298000 yuan/ton, predicting a surge of nearly 50%.

2026-05-07

The 4000t/d clinker production line of Penglai Weiyang Cement has been dismantled according to the regulations and completely shut down. It does not have the conditions to resume production and is subject to social supervision.

2026-05-07

On May 5, the tender announcement of the 2026-2027 Photovoltaic Module Framework Agreement of Shenneng Stock System Enterprise was issued, and the tenderer was Hainan Shenneng Material Co., Ltd. 

2026-05-07

Cement Industry Air Pollutant Emission Standard "No.1 Amendment" will be implemented on May 1! Compulsory New National Standard "Safety Technical Code for Working in Confined Space" GB 46768-2025! Effective May 1!

2026-05-07

The total length of the line is 27.401km, with 1 large bridge of 146.04m, 4 medium bridges of 239.16m, 97 culverts and 6 grade crossings. This project is constructed according to the standard of two-way four-lane first-class highway, with a design speed of 80km/H, a subgrade width of 25.5m, and a vehicle load grade of highway-I.

2026-05-07

Last week, the national cement market as a whole fell more or rose less, and prices in many provinces bottomed out.

2026-05-07

The project includes three sub-projects: education project (middle school in the central functional area of Luojiang River), directional pricing commercial housing project and municipal infrastructure project (municipal infrastructure supporting project in Xinyang District of Luojiang River, municipal infrastructure supporting project in Xinyang District of Luojiang River-flood drainage canal project).

2026-05-07

Recently, China Construction Co., Ltd. issued a major project announcement, which showed that the company recently won seven major projects, including housing construction and infrastructure, with a total amount of 28.88 billion yuan.

2026-05-07

Located in Leting County, Tangshan City, Hebei Province, Huaneng Leting 350MW Onshore Wind Power Project is invested and constructed by Huaneng Leting County Integrated Energy Co., Ltd. The project includes the 220 kV booster station built in Daxianggezhuang Town and several wind farm stations distributed in Laoting Town Station and Maozhuang Town Station, with a total installed capacity of 350 MW, belonging to the onshore wind power generation project.

2026-05-07

A few days ago, China Resources Building Materials Technology (01313. HK) announced that KPMG ( "KPMG") has been an independent auditor of the company since May 2023 and will retire after the annual general meeting of shareholders held on May 29, 2026. After careful consideration, the Board proposes not to re-appoint KPMG as the independent auditor of the Company at the AGM.

2026-05-07

Sichuan Jinding announced that the board of directors of the company received a written resignation report from Vice General Manager Du yuanyuan on May 6, 2026. For personal reasons, he resigned from the position of Vice General Manager. The resignation report took effect from the date of delivery to the board of directors, and no longer held any position in the company and its subsidiaries after his resignation.

2026-05-07

The leased object is located in the factory area of Fujian Fuqing Wannianqing Cement Co., Ltd. in Pengyang Village, Chengtou Town, Fuqing City, and the rent is paid annually. The company is 90% owned by Jiangxi Wannianqing Cement Co., Ltd.

2026-05-07

In view of all the problems found in this unannounced visit, the Central Safety Production Assessment and Inspection Team has handed over all the problems to the territorial government and relevant departments in accordance with the procedures, and requires the territorial supervision departments to strictly perform their supervisory duties, urge enterprises to implement the main responsibility of safety production, carry out investigation and rectification, and keep the bottom line of safety production.