News List

Notice of the General Office of the Ministry of Industry and Information Technology on Issuing the National Industrial Energy Conservation Supervision Task in 2023

2023-07-11

The main reasons for disqualification are as follows: firstly, some enterprises use unqualified raw materials in order to reduce the unit price and enhance the market competitiveness; secondly, the quality control of enterprises in the production process is not strict.

2023-07-11

On July 7, the Three Gorges Group issued a tender announcement for centralized procurement of photovoltaic inverter framework in 2023. This tender is not divided into bidding sections. The scope of the tender is 300 kW and above string inverters and their ancillary equipment required by the photovoltaic projects of the Three Gorges Group. The total capacity of the estimated procurement is 4GW.

2023-07-11

On July 10, the Jiangsu Provincial Office of Industry and Information Technology issued a public announcement on the integrated construction plan of the cement clinker production line of Liyang Qianfeng Cement Co., Ltd.

2023-07-11

Yang Zhonghong, head of Taiwan Cement Enterprise, said that he would comprehensively promote the construction of intelligent chemical plants, achieve energy saving and emission reduction, reduce costs and increase efficiency, and deepen the green development of mines is to keep Jinshan and Yinshan.

2023-07-11

In addition, according to relevant information from various places, a number of cement enterprises have recently declared bankruptcy liquidation or entered bankruptcy proceedings.

2023-07-11

Two regulatory letters were received within one month.

2023-07-11

In the first week of July, the signing, start-up and production of photovoltaic industry projects were still hot.

2023-07-11

Recently, according to foreign media reports, micro-inverters produced and sold by Deye, China's leading inverter company, have encountered a "certification fraud crisis" in Germany. Some media even wrote directly, "Wir wurden betrogen: Deye Fake Wechselrichter?" (Chinese: We have been cheated, Deye inverter fraud). ".

2023-07-11

In 2023, it is inevitable that component manufacturers will fight fiercely.

2023-07-11

On July 10, the ex-factory price of glass in various enterprises

2023-07-10

The mining area of the project is 1.784 square kilometers, with a recoverable resource reserve of 150.9 million cubic meters.

2023-07-10

Starting from adjusting the industrial structure and upgrading the industrial level, Xiamen has made great efforts to build a "4 + 4 + 6" modern industrial system with sustained momentum and step-by-step development.

2023-07-10

The price of Shahe glass (5.0mm, large plate) is 1676 yuan/ton.

2023-07-10

Recently, Yiwu Housing and Urban-Rural Construction Bureau organized a special inspection and assessment of commercial concrete quality in the second quarter of 2023.

2023-07-10

One 600t/d Low-E float glass production line and one 600t/d ultra-thin float glass production line of China Yaohua Glass Group Co., Ltd. for equivalent capacity relocation

2023-07-10

Railway construction has maintained a good momentum of development, which has brought a strong pull to the demand for sand and gravel.

2023-07-10

In the first half of last year, the days of kiln shutdown in Guizhou cement enterprises were generally about 100 days, and this year the time was extended to about 120 days.

2023-07-10

The invoicing behavior in this business model has tax risks for both construction enterprises and commercial concrete companies.

2023-07-10

Two cases of illegal sand mining and sand-related violations were seized in succession, and three suspects were arrested, which effectively guaranteed the smooth development of the Xiaogu River Regulation Project.

2023-07-10

On September 26, Guizhou issued a peak-staggering production plan for the fourth quarter, requiring that all new dry-process cement clinker production lines in the province be shut down for 65 days + N in the fourth quarter, that is, no less than 65 days per line. The original text of off-peak production is as follows: