On July 24, the commencement ceremony of Datang Xi Wei Centralized Photovoltaic Project was held, marking the company's new energy layout in eastern Fujian.

The project is located in the aquaculture pond area of Xiapi Village, Xiwei Town, Fuan City, Fujian Province, with a total area of 1180 mu, a planned AC installed capacity of 80 MW, and a synchronous supporting energy storage facility of 8 MW/16 MWh. By adopting the three-dimensional development mode of fishing-light complementarity , the synchronous operation of water photovoltaic power generation and underwater aquaculture can be realized, so as to achieve "dual-use, fishing-light symbiosis" and greatly improve the comprehensive utilization rate of beach water and soil resources. After the
project is completed and put into operation, the annual average power generation will reach 123 million kilowatt-hours. It is estimated that the project can save 35000 tons of standard coal per year.
It is reported that the project will start EPC general contracting bidding in November 2025, and the tenderer is Fujian Datang International Ningde Power Generation Co., Ltd.
In December of that year, the consortium of China Energy Engineering Group Northeast Electric Power Third Engineering Co., Ltd. and Fujian Yongfu Electric Power Design Co., Ltd. finally won the project with a price of about 161 million yuan and a unit price of 2.013 yuan/W.

浙公网安备33010802003254号